manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. 360 YIELD CENTER
  6. •
  7. Farm Equipment
  8. •
  9. 360 YIELD CENTER 360 Y-DROP User manual

360 YIELD CENTER 360 Y-DROP User manual

Other 360 YIELD CENTER Farm Equipment manuals

360 YIELD CENTER 360 Series User manual

360 YIELD CENTER

360 YIELD CENTER 360 Series User manual

360 YIELD CENTER BANDIT KINZE 3000 User manual

360 YIELD CENTER

360 YIELD CENTER BANDIT KINZE 3000 User manual

360 YIELD CENTER 360 SOILSCAN Manual

360 YIELD CENTER

360 YIELD CENTER 360 SOILSCAN Manual

360 YIELD CENTER 360 BANDIT User manual

360 YIELD CENTER

360 YIELD CENTER 360 BANDIT User manual

Popular Farm Equipment manuals by other brands

Schaffert Rebounder Mounting instructions

Schaffert

Schaffert Rebounder Mounting instructions

Stocks AG Fan Jet Pro Plus 65 Original Operating Manual and parts list

Stocks AG

Stocks AG Fan Jet Pro Plus 65 Original Operating Manual and parts list

Cumberland Integra Feed-Link Installation and operation manual

Cumberland

Cumberland Integra Feed-Link Installation and operation manual

BROWN BDHP-1250 Owner's/operator's manual

BROWN

BROWN BDHP-1250 Owner's/operator's manual

Molon BCS operating instructions

Molon

Molon BCS operating instructions

Vaderstad Rapid Series instructions

Vaderstad

Vaderstad Rapid Series instructions

HighLine BM1400 operating manual

HighLine

HighLine BM1400 operating manual

GSi PNEG-2314 installation manual

GSi

GSi PNEG-2314 installation manual

Checchi & Magli TEXDRIVE owner's manual

Checchi & Magli

Checchi & Magli TEXDRIVE owner's manual

Amazone Cenius 4003-2TX operating manual

Amazone

Amazone Cenius 4003-2TX operating manual

MASSEY FERGUSON MF 9313S Operator's manual

MASSEY FERGUSON

MASSEY FERGUSON MF 9313S Operator's manual

Cima BLITZ Maintenance Instruction

Cima

Cima BLITZ Maintenance Instruction

Amazone CombiDisc 3000 Original operating manual

Amazone

Amazone CombiDisc 3000 Original operating manual

HE-VA Disc-Roller XL Contour Operating instructions/spare parts list

HE-VA

HE-VA Disc-Roller XL Contour Operating instructions/spare parts list

AGT AGT-SSFM product manual

AGT

AGT AGT-SSFM product manual

Milestone 72-84 manual

Milestone

Milestone 72-84 manual

KUHN Hector 3000 Complementary instructions

KUHN

KUHN Hector 3000 Complementary instructions

Krone X-Disc 6200 operating instructions

Krone

Krone X-Disc 6200 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

2015 360 Y-DROP ASSEMBLY
INSTRUCTIONS
CASE 80’/90’ BOOM
It’s important to know where each mounting bracket fits up, relative
to the row spacing of the crop that will be serviced. The first position a
360 Y-DROP & 360 UNDERCOVER unit should be placed is the very
center of the machine. This is critical in understanding the assembly of
the system to the sprayer. This will give good guidance for mounting
the system to your sprayer boom. There are, however, numerous
permutations of booms among all sprayer models; it could very well
be that your sprayer is not identical to the model in the following steps
of the guide and pictures may dier from yours. While these steps
will help you install most of your 360 Y-DROP system, you may need
to custom fit some components, based on your particular boom.
1. From center of the machine, there are five (5) mounting zones
on each of the primary side booms (first fold) in which the
mounting brackets will be installed. This depends on the width
of your boom and account for both 20” & 30” row spacing.
Extend the right and left primary booms (first fold) and
measure from machine center, marking both ends of each of
the following zones on both right and left primary booms:
1. Zone 1: 80”-90” from center
2. Zone 2: 120”-140” from center
3. Zone 3: 180”-200” from center
4. Zone 4: 240”-260” from center
5. Zone 5: 300”-320” from center
2. Assemble mounting bracket in Zone 1 on the boom and leave
loose, shown in Fig 2.
1. One (1) 6” z-slider bracket
2. Two (2) 5” top plates
3. Two (2) 3/8” x 4” bolts
4. Four (4) 3/8” flat washers
5. Two (2) 3/8” lock washers
6. Two (2) 3/8” nuts.
!"#$%$
&'$()*$+,-./$
0'$123,45/6$
3. Install remainder of the mounting brackets in Zones 2 through 5
and leave loose, shown in FIG 3:
1. One (1) 6” z-slider bracket
2. Two (2) 5” plates
3. Two (2) 3/8” x 4” bolts
4. Four (4) 3/8” flat washers
5. Two (2) 3/8” lock washers
6. Two (2) 3/8” nuts
4. Space all five sets of mount brackets nominally 60” apart, fold
boom to check clearances and tighten. Distances between
brackets may vary, depending on your specific boom. Be sure to
take into account where your drops will fall.
5. Repeat STEPS 2 - 4 on the other boom fold.
6. Install two (2) mounting brackets on center section and tighten,
right side is shown in FIG 4a, 4b & 4c:
1. Two (2) 6” z-slider brackets
2. Four (4) 6” plates
3. Four (4) 4.5” bolts
4. Eight (8) 3/8” flat washers
5. Four (4) 3/8” lock washers
6. Four (4) 3/8” nuts
!"#$7$ 0'$123,45/6$
&'$*,-./$
!"#$8-$
0'$.)*$*,-./$
0'$123,45/6$
!"#$89$
!"#$8:$
7. Install z-bars and stop bolts in all 12 z-brackets, leave loose and
carefully fold sprayer booms into cradle to adjust fore/aft locations.
1. Twelve (12) 38” z-bars
2. Twelve (12) 5/16” x 3/4” stop bolts and nuts
8. Install 3” z-slider brackets and stop bolts on all z-bars, shown in FIG 5:
1. Twelve (12) 3” z-slider brackets
2. Twelve (12) 5/16” x 3/4” stop bolts and nuts
9. Install and tighten 3/8” set screws with jam nuts in all z-slider
brackets, shown in FIG 6 (three per 6” z-slider, two per 3” z-slider):
1. (60) 3/8” set screws
2. (60) 3/8”jam nuts
!
7;<'$=/.$=:6/>$?$@A.$
7'$B23,45/6$
!"#$&$
!"#$0$
10. On both the left and right boom wings, assemble four (4) 5’ boom
sections with 8” connector bars using provided hardware. Another
5’ boom section will need to be field cut in half to extend the length
needed for all 24Rx30” or 36Rx20” drops. Assemble this shorter
section to the inner part of both boom folds. In total, the 360 Y-
DROP boom should span 22-1/2 feet, example shown in FIG 7. The
center section will take (2.5) 5’ boom sections. Cap the ends of boom
sections with rubber cap.
1. 5’ Boom Section
2. 8” connector bar
3. 3/8” x 1-3/4” stainless steel flange bolt
4. 3/8” flat washer
5. 3/8” lock washer
6. 3/8” nut
7. 1-1/4” square rubber cap
!"#$C$
!"#$&$
11. Assemble (8) 2-section yokes to be used as support straps from 360 Y-
DROP boom to left & right upper sprayer boom, shown in FIG 8. Note:
Length will need to be adjusted to fit distance between booms.
1. (2) 23” Yoke straps
2. (4) Yoke ends
3. (4) 3/8” x 1-1/4” carriage bolts
4. (2) 3/8” x 1-1/4” bolts
5. (6) 3/8” flat washers
6. (6) 3/8” lock washers
7. (6) 3/8” nuts
8. (2) 3.5” locking clip pin
!"#$<$
!
D%E "@3.-,,$F0G$%2=/:H)@$I)J/3$.)$9).K$,/L$?$64MK.$K-@5$3*6-I/6$
9))N$-@5$70O$P2QRS+$9))NT$as!shown!in!FIG!9a!&!9b,!
spaced!evenly!along!each!side.!!Adjust!length!of!each!yoke!
as!required!to!support!the!square!360!YEDROP!boom.!!
Secure!with!3.5”!locking!clip!pin!at!top!and!boNom!of!yoke.!
!
!"#$U9$
!"#$U-$