Setting the station communication..........................................................35
Verifying the communication...................................................................35
Section 5 Testing IED operation..........................................................37
Preparing the IED to verify settings........................................................37
Activating test mode...............................................................................39
Preparing the connection to the test equipment.....................................39
Connecting the test equipment to the IED..............................................40
Releasing the function to be tested........................................................41
Verifying analog primary and secondary measurement.........................42
Testing protection functionality...............................................................43
Section 6 Testing functionality.............................................................45
Testing disturbance report......................................................................45
Introduction........................................................................................45
Disturbance report settings................................................................45
Identifying the function to test in the technical reference manual ..........45
Testing impedance protection functions.................................................46
Five zone distance protection, quadrilateral and mho
characteristic ZQMPDIS (21)............................................................46
Quadrilateral characteristics.........................................................46
Mho characteristics.......................................................................49
Measuring the operating limit of set values with shaped load
encroachment characteristics.......................................................51
Measuring the operate time of distance protection zones............51
Completing the test.......................................................................51
Phase selection with load encroachment, quadrilateral
characteristic FDPSPDIS (21)...........................................................52
Measuring the operate limit of set values.....................................55
Completing the test.......................................................................55
Faulty phase identification with load encroachment FMPSPDIS
(21)....................................................................................................55
Phase preference logic PPLPHIZ .....................................................55
Completing the test.......................................................................57
Power swing detection ZMRPSB (68)...............................................57
Verifying the settings....................................................................58
Testing the power swing detection function ZMRPSB (68)..........59
Testing the
tR1
timer....................................................................59
Completing the test.......................................................................60
Automatic switch onto fault logic, voltage and current based
ZCVPSOF..........................................................................................60
Table of contents
2
Commissioning Manual