In-ground Installation
The in-ground scale installation will require installation prior to concrete floor installation
or the cutting of the existing concrete floor for the scale to be installed. This is the more
labor-intensive of the two installations but is also the most desirable installation as the
scale is flush with the floor allowing the scale to be walked on/around as if it is part of
the floor.
When choosing a location for the in-ground scale it is important to consult with the
building engineers to ensure the scale is in a place that will not interfere with existing
building wiring, plumbing, etc., and at the same time ensure that the scale is away from
general traffic and that the chosen area is protected from water, misc. debris, wind, and
or vibration.
Consult with your concrete contractor to perform the pit frame installation. The pit frame
should be installed so that the top edge is even with the floor and surrounded by
concrete to ensure a solid and sound installation. Note: The pit frame will require
conduit to be run from the pit frame to a wall location directly behind the scale to run the
interconnect cable from the scale to the indicator. The image below shows the proper
installation of the pit frame.