
Internal Battery Pack for TPMC-4XG Crestron TPMC-4XG-BTP
Setup
Charging
NOTE: A Lithium Ion (Li-Ion) battery typically provides 300-500
charge/discharge cycles.
To charge the TPMC-4XG-BTP, install the TPMC-4XG-BTP in a
TPMC-4XG touchpanel and mount the touchpanel on an AC powered
TPMC-4XG-DS Docking Station/Charger (sold separately).
NOTE: The battery pack may take up to three hours to charge in a
powered touchpanel if the panel is in use during charging.
Installation
Use the following procedure to install the TPMC-4XG-BTP in a
TPMC-4XG touchpanel:
1. Place the touchpanel screen side down on a clean, soft surface.
2. Remove the battery compartment cover on the rear of the
touchpanel.
3. Place the TPMC-4XG-BTP in the battery compartment oriented so
the multi-pin connector is on the top.
4. Carefully connect the multi-pin connector of the TPMC-4XG-BTP
with the corresponding connector inside the battery compartment.
The pin side of the connector should be facing downward (toward
the front of the TPMC-4XG).
NOTE: When installing the battery in the TPMC-4XG, ensure the
connecting wires are not under the battery. Refer to the photo on the
following page for proper wire routing.
5. Re-attach the battery compartment cover.
NOTE: To prevent battery drain during shipment or for long-term
storage, the TPMC-4XG has a battery switch inside the battery
compartment. To use the internal battery, move the switch to the left (on)
4 •Internal Battery Pack: TPMC-4XG-BTP Operations & Installation Guide – DOC. 6657A