Cleaning and maintenance
Cauon
Wash offthe roof and the side parts with soapy water. Mould and mould stains can be removed using a mild
chlorine soluon. Observe the instrucons provided by the manufacturer and test the chlorine soluon on a
hidden spot to make sure that there is no discolouraon.
Cauon! The party tent must not be and packed up when it is wet. First, allow it to dry completely.
1. Always handle the tent with care to avoid damage.
2. Do not apply too much pressure to the frame parts to avoid damage.
3. Tents are intended for temporary accommodaon and should be taken down in adverse weather
condions.
4. Always be sure to keep sufficient distance to hoses as well as gas and power lines to avoid possible
damage.
5. When using suitable heaters (available e.g. in specialist shops), keep a minimum distance of 1.2 m to tarp
material. Open fire or heaters with open flames such as pao heaters, umbrella heaters, gas heaters etc.
should not be used in any case.
6. The person seng up the tent is responsible for adequately securing it to ensure its safety.
dismanteled
Instrucons
1
2
3
4
5
Select a flat surface for the tent. Unpack the boxes and check if all listed parts are included.
Assemble the roof frame by mounng parts 10 to 15 on the pipes (parts 1, 2,and 3).
Use the screws 22 to aach the parts.
Aach the reinforcement braces (parts 4 and 5) using screws (23) and wing nuts (26).
Li one side of the tent frame and aach the legs (7). Aach the legs with part no. 8 to the outside in all four corners. Place the
roof (32) onto the frame and use the bungees (28) to fasten it. Be sure not to put too much tension on the bungees in order not
to make aaching the other side more difficult.
Aach the legs on the other side and install the feet (16, 17) at the boom.
Aach the side covers to the pipes (7, 8) using hooks (31). Reinforce the side frame by aaching
the diagonal pipes (6) to all four corners. Complete the boom frame with the required pipes (2 and 9) and connector (18).
Unfold the side walls (33) and the end walls (34) and aach the side walls to the frame using the bungees (28). Aach the end walls
directly to the roof using the short bungees (29). Use the short ground pegs (21) to fasten the end walls to the ground. The guy rope
runs from every corner of the tent and is braced to the ground using the ground pegs.
Remove the slight oil film from the pipes
with a cloth. In colder weather condions we suggest to bring the roof to room temperature before installing.
Make sure, that the leg pipes are in vercal posion,
to avoid overtenon on the endwalls.
Use the big ground pegs (19) to fasten the feet to the ground.