
Roko Outdoor Bollard Fitting
Safety Warnings
INSTRUCTION MANUAL
• It is recommended that this light be installed by a qualied electrician in accordance with current IEE Wiring
RegulationsandBuildingRegulations(PartP).
• Thisproductisonlysuitableforconnectiontoa240v~50Hzsupplyandisforoutdooruse.
• Runsupplywirefroma5-ampelectricalsupplyusingdoubleinsulated2or3-corecableoftypeH05RN-F1.0mm2
(notsupplied)toselectedsite,ensuringitisadequatelyprotectedthroughthefulllengthofthecablerun,itmust
comeoutoftheatsurfaceofthewallinlinewiththeentrytothetting
• ThisttingisaClassIproduct,andmust beconnectedtoEarth.
• Switchoffthemainssupplyandremovetheappropriatefuseorswitchofftheappropriatecircuitbreakerbefore
commencinginstallation.
• Exceptwhereinstalledinaconduitorductwhichprovidesequivalentprotectionagainstmechanicaldamage,
acableburiedinthegroundshallincorporateanearthedarmourormetalsheathorboth,suitableforuseasa
protectiveconductor,orbeofinsulatedconcentricconstruction.Buriedcablesshallbemarkedbycablecoversor
asuitablemarkingtape.Buriedconduitsandductsshallbesuitablyidentied.Buriedcables,conduitsandducts
shallbeatasufcientdepthtoavoidbeingdamagedbyanyreasonablyforeseeabledisturbanceoftheground.
• Iftheglassordiffuserisbrokenorcrackeditmustbereplaced,pleaseconsultyourretailer.Thisisthesymbol
whichdenotesthisrequirement:
• Thisproductmustonlybeinstalledtoasolid,xedsurface,suchasconcrete,deckingorpavingslabs.Itmust
NOTbeinstalledonsoil.
• Donotinstallabulbwithagreaterwattageordifferentshapethanspeciedonthelabel.
• Ifanymodicationismadeitwillinvalidatethewarrantyandmayrendertheproductunsafe.
67703_67704RokoPost_Bollard20171129
EndonLighting,LS90SE
Assembly/ User Instructions
Before you start
Pleasereadtheseinstructionscarefullybeforettingandretainforreference.Checkthepackagingandmakesure
thatyouhavealltherequiredparts.Followeachassemblystepinordertopreventincorrectassembly.Ensurethat
theproductisfullyassembledasillustratedbeforeuse.Ensurethattherearenocables/pipesbeneaththesurface
(otherthanthesupplycableforthistting).
Themountingsurfacemustbexed,solidandabletoaccommodatetheweight/heightofthetting.Ifinstallingonan
existingsecure(concrete)base,usetheholesinthepostbaseasatemplatetodrillsuitablexingholesandprepare
withsuitablegroundxingbolts(notsupplied).Thesupplycable(atleast250mm)mustcomeoutofthemounting
surfaceanddirectlyintotheterminalblockinthebase/postofthetting.
Makesureallscrews/nuts,includingelectricalconnectionsetcarefullytightenedbeforeuse.
The Light pack contains:
Lighttting.
Terminalconnectionblock(s).
Fixingpack.
The following tools may be required:
Selectionofcrossandatheadscrewdrivers.
Electricdrillandassorteddrillbits.
Wirestrippers.
Electricalinsulationtape.
Care Information
Allow10minutestocoolbeforereplacing,adjustingorcleaning.
ToachievemaximumcorrosionresistancethesurfaceoftheStainlessSteelmustbekeptclean.Surfacecontamination
andtheformationofdeposits,forexamplesalt,arecriticalfactorswhichmayleadtodrasticallyreducedlife.Careful
washingwithsoaporamilddetergentandwarmwaterfollowedbyacleanwaterrinseandnallywipingdryisusually
adequateformostS/Sitemsusedinthedomesticenvironment.Caremustbetakentoturnoffthemainssupplyuntil
thecleaningprocesshasbeencompletedandthettingiscompletelydry.