
Contents and general safety instructions
IV
Festo P.BE-MTR-DCI-PB-EN en 1209a
3.3.2 Shared supply with load and logic voltage
(not for MTR-DCI-32) 3-9.....................................
3.3.3 Separate supply with load and logic voltage 3-10..................
3.4 Serial interface 3-11.................................................
3.5 Input for external reference switch 3-13.................................
3.6 Connecting the higher-order controller 3-15..............................
3.6.1 Fieldbus cable 3-16..........................................
3.6.2 Fieldbus bit rate and fieldbus length 3-17........................
3.6.3 Bus termination 3-18.........................................
4. The control panel (MTR-DCI-...-H2) 4-1................................
4.1 Composition and function of the control panel 4-4.......................
4.2 The menu system 4-6...............................................
4.2.1 Accessing the main menu 4-6.................................
4.3 [Diagnostic] menu 4-8..............................................
4.4 [Settings] menu 4-12................................................
4.5 [Positioning] menu 4-18..............................................
4.6 Menu command [HMI control] 4-22.....................................
5. Commissioning 5-1................................................
5.1 Commissioning procedure 5-4........................................
5.2 Commissioning with the control panel (only MTR-DCI-...-H2) 5-6............
5.2.1 Selecting the axis type 5-8...................................
5.2.2 Setting homing parameters 5-9...............................
5.2.3 Carrying out homing 5-12.....................................
5.2.4 Teaching the axis zero point AZ and the software end positions 5-15..
5.2.5 Teaching position set records 5-17..............................
5.2.6 Test run 5-19...............................................
5.2.7 Setting PROFIBUS addresses 5-21..............................
5.3 Commissioning with FCT 5-22.........................................
5.3.1 Installing the FCT 5-23........................................
5.3.2 Procedure 5-24.............................................
5.4 Overview of commissioning on the PROFIBUS 5-26........................
5.5 Configuration 5-27..................................................