
Fonna Scientific,
Inc._'--
____________________
Content
Table
of
Contents
SECTION
1 -
RECEIVING
1.1
Prelinrinary Inspection................................................................................
1-1
1.2 Visible Loss or Damage.............................................................................
1-1
1.3
Responsibility for Shipping Damage...........................................................
1-1
SECTION
2 - INSTALLATION AND START-UP
2.1 Location .....................................................................................................2-1
2.2 Water (Hunridity System) and Drain Connections........................................2-1
a.
Connecting the Water Inlet for the Hunridity System.............................2-1
b.
Connecting the Drain Line .....................................................................2-2
2.3 RS-232 Output Interface and Remote Alarm Connector..............................2-3
2.4 Power Connection .....................................................................................2-4
2.5 Start-Up Procedure...................................................................................;.2-4
2.6 Setting the Overtemp Safety Thennostat....................................................2-4
2.7 Setting the Undertemp Safety Thermostat...................................................2-5
2.8 Preparing the optional Cob
ex
Recorder.....................................................2-6
a.
Installing the Chart Recorder Battery....................................................2-6
b.
Changing the Chart Paper.....................................................................2-6
c.
Changing the Pen ..................................,................................................2-7
d.
Calibrating the chart recorder................................................................2-7
2.9 Controller Configuration.............................................................................2-8
Temperature Configuration
Hunridity Configuration
SECTION
3 -
CONTROL
PANEL
OPERATION
3.1 The Control Panel ....................................................................................3-1
Main
Power
Switch and Indicator Light..............................................3-1
Refrigeration Switch and Indicator Light................................................3-1
Defrost Switch and Indicator Light.........................................................3-2
Overtemp Safety Control, Indicator Light, and Audible Alarm ..............3-2
Undertemp Safety Control, Indicator Light, and Audible Alarm ............3-2
11