FS S5850-24S2C-DC User manual

SWITCH DE ROUTAGE L3 MANAGEABLE
MANAGED L3 ROUTING SWITCH
MANAGED L3 ROUTING SWITCH
V1.0
Quick Start Guide
Quick Start Anleitung
Guide de Démarrage Rapide
S5850-24S2C-DC/S5850-24S2C
S5850-24S2C-DC
100G

S5850-24S2C-DC
1 2 345 6 78 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
Introduction
S5850-24S2C-DC/S5850-24S2C
Terminal Block Connector x 2
Grounding Cable x1 Rubber Pad x4 M4 Screw x8
Mounting Bracket x2
Console Cable x1 Cat5e Cable x1
Accessories
Thank you for choosing S5850-24S2C-DC/S5850-24S2C Switch. This guide is designed to
familiarize you with the layout of the switch and describes how to deploy the switch in your
network.
1
EN
S5850-24S2C-DC:

Grounding Cable x1 Rubber Pad x4 M4 Screw x8
Mounting Bracket x2
Console Cable x1 Cat5e Cable x1
2
EN
S5850-24S2C:
Power cord x1

3
EN
S5850-24S2C-DC
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
S5850-24S2C-DC
Hardware Overview
Front Panel Ports
Front Panel LEDs
QSFP28
SFP+
USB
CON
QSFP28
SFP+
ETH 40G Breakout LED
SYS
Ports Description
SFP+
QSFP28
CON
SFP+ ports for 1/10G connection.
QSFP28 ports for 40/100G connection.
An RJ45 console port for serial management.
ETH
USB
An Ethernet management port.
A USB management port for software and configuration backup
and offline software upgrade.
ETH
ID

4
EN
+
NULL
-
-48V- -60V,6A
+
NULL
-
-48V- -60V,6A
Back Panel
Grounding Point 3 Fixed Fans
ID
SYS
ID indication function enable.Blue
Green
Off
Off
Amber
ID indication function disable.
The System is normally running.
The system occurs alarm or error.
No power or no system runs or runs abnormally.
ETH
Green
Blinking Green
Off
Port is linked.
Port is receiving or transmitting packets.
Port is not linked.
LEDs Status Description
Breakout
Loop Blinking
Off
QSFP28
SFP+
Green
Blinking Green
Blinking Green
Off
Off
Amber
Blinking Amber
Blinking Amber
Green
Amber
One or more 40/100G ports are breakout.
None of the 40/100G port is breakout.
10G port is linked.
The SFP+ port is transmitting or receiving packets at 10G.
1G port is linked.
The SFP+ port is transmitting or receiving packets at 1G.
Port is not linked.
40/100G port is linked.
The QSFP28 port is transmitting or receiving packets at 40/100G.
10/25G port is linked.
The QSFP28 port is transmitting or receiving packets at 10/25G.
Port is not linked.
2 Hot-swappable Power Supplies

5
EN
Site Environment:
Installation Requirements
Do not operate it in an area that exceeds an ambient temperature of 45°C.
The installation site must be well ventilated. Ensure that there is adequate air flow around the
switch.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Before you begin the installation, make sure that you have the followings:
Phillips screwdriver.
M6 Screws.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ-45 Ethernet cables, fiber optical cables, and console cable for
connecting network devices.
Mounting the Switch
Desk Mounting
1. Attach four rubber pads to the bottom.
2. Place the chassis on a desk.
S5850-24S2C-DC
100G
S5850-24S2Q
1 2 345
ID SYS
CON
ETH
S5850-24S2Q
ID SYS
CON
ETH

6
EN
Rack Mounting
1. Secure the mounting brackets to the two sides of the switch with eight M4 screws.
2. Attach the switch to the rack using four M6 screws and cage nuts.
678910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
100G
40GE Breakout 123 4
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
40G
40GEBreakout 123 4
100G

7
EN
S5850-24S2Q
ID SYS
CON
ETH
1. Connect one end of the grounding cable to a proper earth ground, such as the rack in which the
switch is mounted.
2. Secure the grounding lug to the grounding point on the switch back panel with the washer and
screws.
Grounding the Switch
CAUTION: The earth connection must not be removed unless all supply connections
have been disconnected.
Connecting the Power
+
NULL
-
-48V- -60V,6A
The front panel of the power supply indicates a DC inlet power socket and consists of one terminal
block connector within 3 contacts. Please follow the steps below to insert the power wire.
1. Insert positive/negative DC power wires into Contacts + and -.
+NULL
-

8
EN
CAUTION: Laser beams will cause eye damage. Do not look into bores of optical modules
or optical fibers without eye protection.
First install SFP+ transceivers and then connect the fiber optic cable to the transceiver ports, or directly
connect DAC cables to the SFP+ slots.
Connecting the SFP+ Ports
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
100G
40GE Breakout 123 4
S5850-24S2Q
ID SYS
CON
ETH
2. Tighten the wire-clamp screws to prevent the wires from loosening.
NO.
1
2
3
Name
+
-
NULL
Description
Positive
Negative
Null

9
EN
First install QSFP28 transceivers and then connect the fiber optic cable to the transceiver ports, or
connect DAC cables to the QSFP28 slots.
Connecting the QSFP28 Ports
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
100G
40GE Breakout 123 4
ID SYS
CON
ETH
Connecting the Management Ports
1. Insert the RJ45 connector of the console cable into the RJ45 console port on the front of the switch.
2. Connect the other end of the console cable to the RS-232 serial port on the computer.
Connecting the Console Port

10
EN
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
40G
40GE Breakout 123 4
1. Connect one end of a standard RJ45 Ethernet cable to a computer.
2. Connect the other end of the cable to the ETH port on the front of the switch.
Connecting the ETH Port
1 2 345 6 78910
ID SYS
CON
ETH
USB
Insert the Universal Serial Bus (USB) flash disk to the USB port for software and configuration backup
and offline software upgrade.
Connecting the USB Port
1 2 345 6 7
ID SYS
CON
ETH
S5850-24S2C-DC
S5850-24S2C-DC

11
EN
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
40G
40GE Breakout 123 4
Configuring the Switch
Step 1: Connect the computer to the Management port of the switch with the network cable.
Step 2: Set the IP address of the computer to 192.168.1.x. (“x”is any number from 2 to 254.) Set the
subnet mask of the computer to 255.255.255.0.
Configuring the Switch via the Web-based Interface
?x
OK Cancel
General
IP address:
Subnet mask:
Default gateway:
You can get IP settings assigned automatically if your network
supports this capability. Otherwise, you need to ask your network
administrator for the appropriate IP settings.
Internet Protocol Version 4(TCP/IPv4) Properties
Use the following IP address:
Obtain an IP address automatically
Preferred DNS server:
Alternate DNS server:
Validate settings upon exit Advanced...
. . . 21168192
0255
255255
. . .
. . .
. . .
. . .
Obtain DNS server address automatically
Use the following DNS server addresses:
Step 3: Open a browser, type http://192.168.1.1, and enter the default username and password,
admin/admin.
Step 4: Click Sign in to display the web-based configuration page.
8910 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
40G
40GE Breakout 123 4
admin
English
......
Remember Password
Login

12
EN
Step 1: Connect a computer to the switch's console port using the supplied console cable.
Step 2: Start the terminal simulation software such as HyperTerminal on the computer.
Step 3: Set the parameters of the HyperTerminal: 115200 bits per second, 8 data bits, no parity, 1 stop
bit and no flow control.
Step 4: Enter the default username and password, admin/admin.
Configuring the Switch Using the Console Port
x
Quick Connect
Protocol: Serial
Flow Control
DTR/DSR
RTS/CTS
XON/XOFF
Save sessionShow quick connect on startup
Open in a tab
Connect Cancel
COM3
115200
8
None
1
Port:
Baud rate:
Data bits:
Parity:
Stop bits:
Name of pipe:

13
EN
Troubleshooting
After loading fails, the system will keep running in the original version. At this time, users should
re-check if physical port connections are good firstly. If some ports are not connected, then
re-connect them to ensure that physical connections are correct, and begin re-loading. If physical
connections are correct, then check the loading process information displayed on the super terminal
to verify if there are input errors. If there are input errors, correct them and re-load.
Loading Failure Troubleshooting
If system password is lost or forgotten, the following method can be used to reset the password:
1. Connect the console port of the switch to the computer through the console cable.
2. Press ctrl + b to enter the Uboot mode.
3. Start the system with an empty configuration file with no password.
Bootrom#boot_flash_nopass
Bootrom#Do you want to revert to the default config file?[Y|N|E]:
User Password Lost Troubleshooting
Configuration System Troubleshooting
1. Make sure the power supply is normal and the console cable is properly connected.
2. Check if the console cable is the right type.
3. Check if the control cable driver is properly installed on the computer.
4. Ensure the parameters of the HyperTerminal are correct.
NOTE: Forgetting your username and password and restoring them through console port
may cause configuration loss and business interruption. Please remember your username
and password.

14
EN
Online Resources
Download
Help Center
Contact Us
https://www.fs.com/products_support.html
https://www.fs.com/service/fs_support.html
https://www.fs.com/contact_us.html
Product Warranty
FS ensures our customers that if there are any damage or faulty items due to our workmanship, we
will offer a free return within 1 month from the day you receive your goods. This excludes any custom
made items or tailored solutions.
Warranty: This product enjoys 5 years limited warranty against defect in materials or
workmanship. For more details about warranty, please check at
Return: If you want to return item(s), information on how to return can be found at
5
https://www.fs.com/policies/day_return_policy.html
https://www.fs.com/policies/warranty.html

S5850-24S2C-DC
1 2 345 6 78 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
Einführung
S5850-24S2C-DC/S5850-24S2C
2x Klemmenleistenstecker
1x Erdungskabel 4x Gummipad 8x M4-Schraube
2x Montagehalterung
1x Konsolenkabel 1x Cat5e Kabel
Zubehör
Vielen Dank, dass Sie sich für den S5850-24S2C-DC/S5850-24S2C Switch entschieden haben.
Dieses Handbuch soll Sie mit dem Aufbau des Switches vertraut machen und beschreibt, wie Sie
den Switch in Ihrem Netzwerk einsetzen.
15
DE
S5850-24S2C-DC:

1x Erdungskabel 4x Gummipad 8x M4-Schraube
2x Montagehalterung
1x Konsolenkabel 1x Cat5e-Kabel
16
DE
S5850-24S2C:
1x Netzkabel

17
DE
S5850-24S2C-DC
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
1 2 345 6 78910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
100G
40GEBreakout 123 4
ID SYS
CON
ETH
S5850-24S2C-DC
Hardware-Übersicht
Ports an der Vorderseite
LEDs an der Vorderseite
QSFP28
SFP+
USB
CON
QSFP28
SFP+
ETH 40G Breakout LED
SYS
Ports Beschreibung
SFP+
QSFP28
CON
SFP+-Ports für 1/10G Verbindungen.
QSFP28-Ports für 40/100G Verbindungen.
Ein RJ45-Konsolenport für serielle Verwaltung.
ETH
USB
Ein Ethernet Verwaltungs-Port.
Ein USB Verwaltungsport für Software- und Konfigurationssicherung
und Offline-Software-Upgrade.
ETH
ID

18
DE
+
NULL
-
-48V- -60V,6A
+
NULL
-
-48V- -60V,6A
Rückseite
Erdungspunkt 3x feste Lüfter
ID
SYS
ID-Anzeigefunktion aktivieren.Blau
Grün
Aus
Aus
Bernstein
ID-Anzeigefunktion deaktivieren.
Das System funktioniert normal.
Das System zeigt einen Alarm oder Fehler an.
Kein Strom oder kein System läuft oder läuft fehlerhaft.
ETH
Grün
Blinkt Grün
Aus
Port ist verbunden.
Der Port empfängt oder sendet Pakete.
Port ist nicht verbunden.
LEDs Status Beschreibung
Breakout
Schleife Blinken
Aus
QSFP28
SFP+
Grün
Blinkt Grün
Blinkt Grün
Aus
Aus
Bernstein
Blinkt Bernstein
Blinkt Bernstein
Grün
Bernstein
Ein oder mehrere 40/100G-Ports sind unterbrochen.
Keiner der 40/100G-Ports ist unterbrochen.
10G-Port ist verbunden.
Der SFP+-Port sendet oder empfängt Pakete mit 10G.
1G-Port ist verbunden.
Der SFP+-Port sendet oder empfängt Pakete mit 1G.
Der Port ist nicht verbunden.
40/100G-Port ist verbunden.
Der QSFP28-Port sendet oder empfängt Pakete mit 40/100G.
10/25G-Port ist verbunden.
Der QSFP28-Port sendet oder empfängt Pakete mit 10/25G.
Port ist nicht verbunden.
2x Hot-swap-fähige Stromversorgungen

19
DE
Standortumgebung:
Installationsanforderungen
Betreiben Sie das Gerät nicht in einem Bereich, in dem die Umgebungstemperatur 45°C
übersteigt.
Der Installationsort muss gut belüftet sein. Stellen Sie sicher, dass um den Switch herum ein
ausreichender Luftstrom herrscht.
Achten Sie darauf, dass der Switch eben und stabil steht, um gefährliche Situationen zu
vermeiden.
Installieren Sie das Gerät nicht in einer staubigen Umgebung.
Der Installationsort muss frei von austretendem oder tropfendem Wasser, starkem Tau und
Feuchtigkeit sein.
Stellen Sie sicher, dass Gestell und Arbeitsflächen gut geerdet sind.
Bevor Sie mit der Installation beginnen, vergewissern Sie sich, dass Sie
über die folgenden Dinge verfügen:
Kreuzschlitzschraubendreher.
M6 Schrauben.
Ein 19"-Rack in Standardgröße mit einer Mindesthöhe von 1 HE.
RJ-45-Ethernet-Kabel der Kategorie 5e oder höher, Glasfaserkabel und Konsolenkabel für den
Anschluss von Netzwerkgeräten.
Montage des Switches
Tischmontage
1. Befestigen Sie vier Gummipuffer an der Unterseite.
2. Stellen Sie das Gehäuse auf einen Tisch.
S5850-24S2C-DC
100G
S5850-24S2Q
1 2 345
ID SYS
CON
ETH
S5850-24S2Q
ID SYS
CON
ETH
Other manuals for S5850-24S2C-DC
1
This manual suits for next models
1
Table of contents
Languages:
Other FS Switch manuals

FS
FS MANAGED L2 User manual

FS
FS S3700-24T4F Instruction Manual

FS
FS S1900-16T User manual

FS
FS S5850-24S2Q User manual

FS
FS S2800S Series User manual

FS
FS S3910 Series User manual

FS
FS S5850-24XMG User manual

FS
FS S5860 Series Operating manual

FS
FS IES3110-8TF User manual

FS
FS S3700-24T4F Instruction Manual