Safety warnings
Any installation or operations on the inverter must be performed by qualified electricians in compliance with
standards, wiring rules, and the requirements of local grid authorities or companies (such as AS 4777 and
AS/NZS 3000 in Australia).
Never insert or remove the AC or DC connecons when the inverter is running.
Before any manipulaon in the inverter connecon area, it is necessary to turn o all power from the DC and
AC sides. Aer that, you must wait 5 minutes before starng work with the inverter.
The temperature of the inverter surface can exceed 60°C during operaon. Make sure it has cooled down
before touching it and make sure the inverter is out of reach of children.
Do not open the inverter cover or change any components without the manufacturer's authorizaon.
Otherwise, the warranty for the inverter will be invalid.
The usage and operaon of the inverter must follow the instrucons in this User Manual. Otherwise, the
protecon design might be impaired and the warranty for the inverter will be invalid.
Appropriate methods must be adopted to protect the inverter from stac electricity damage. Any damage
caused by stac electricity is not warranted by the manufacturer.
The negave (PV-) input of the inverter is not grounded. It is prohibited to connect the PV- or BAT- inputs to
the ground.
PV panels shall comply with class A according to IEC61730. The total idle voltage of the string, must not exceed
the permied maximum DC input voltage of the inverter. Exceeding the maximum permied DC voltage will
cause the changer to be destroyed and the warranty to be lost.
When exposed to sunlight, the PV array generates dangerous high DC voltages. Please operate the inverter
according to these instrucons, or danger to life may result.
The inverter has a built-in RCMU protector that monitors leakage currents on the DC side up to 6mA, when
using an external protector, use an RCD/A type protector
In Australia, the output of the backup side in the switch box should be labeled "Main Switch UPS Supply". The
output on the normal load side in the switch box should be labeled "Main Switch Inverter Supply".