Huawei PDU8000 Series User manual

PDU8000 Modular Integrated PDC V1.0
User Manual
Issue
07
Date
2019-04-15
HUAWEI TECHNOLOGIES CO., LTD.

Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
i
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior
written consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and
the customer. All or part of the products, services and features described in this document may not be
within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,
information, and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address:
Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website:
http://e.huawei.com

PDU8000 Modular Integrated PDC V1.0
User Manual
About This Document
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
ii
About This Document
Overview
This document describes the precautions and methods for installing, configuring,
commissioning, and maintaining the integrated power distribution cabinet (PDC), providing
guidelines for the integrated PDC operation and maintenance (O&M).
The figures provided in this document are for reference only. The actual product appearance prevails.
Intended Audience
This document is intended for:
Maintenance engineers
Technical support engineers
System engineers
Hardware installation engineers
Commissioning engineers
Data configuration engineers
Symbol Conventions
The symbols that may be found in this document are defined as follows.
Symbol
Description
Indicates an imminently hazardous situation which, if
not avoided, will result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, could result in death or serious injury.
Indicates a potentially hazardous situation which, if not
avoided, may result in minor or moderate injury.

PDU8000 Modular Integrated PDC V1.0
User Manual
About This Document
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
iii
Symbol
Description
Indicates a potentially hazardous situation which, if not
avoided, could result in equipment damage, data loss,
performance deterioration, or unanticipated results.
NOTICE is used to address practices not related to
personal injury.
Calls attention to important information, best practices
and tips.
NOTE is used to address information not related to
personal injury, equipment damage, and environment
deterioration.
Change History
Changes between document issues are cumulative. The latest document issue contains all the
changes made in earlier issues.
Issue 07 (2019-04-15)
Added description of bottom cabling and hot-swappable circuit breaker.
Updated the section "Technical Specifications."
Issue 06 (2018-04-21)
Updated the section "Technical Specifications."
Issue 05 (2017-09-28)
Added the description about the 250A input scenario for air conditioner power distribution.
Added the 1200 mm deep cabinet scenario.
Issue 04 (2017-06-28)
Added the description about the single input scenario for IT power distribution.
Added the description about the scenario where the PE bar needs to be installed in the middle
of the rack.
Issue 03 (2017-02-24)
Optimized the description.
Issue 02 (2016-08-20)
Optimized the position where cables are bound in the cabinet.
Updated the description about the positions to which the PDC input power cable connects.

PDU8000 Modular Integrated PDC V1.0
User Manual
About This Document
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
iv
Issue 01 (2016-04-20)
This is the first release.

PDU8000 Modular Integrated PDC V1.0
User Manual
Contents
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
v
Contents
About This Document.................................................................................................................... ii
1 User Manual Usage.......................................................................................................................1
2 Safety Precautions.........................................................................................................................2
2.1 General Safety Precautions...........................................................................................................................................2
2.2 Electrical Safety............................................................................................................................................................3
2.3 Environmental Safety ...................................................................................................................................................4
2.4 Mechanical Safety ........................................................................................................................................................4
2.5 Laying Out Cables........................................................................................................................................................5
3 Overview.........................................................................................................................................6
3.1 Product Model ..............................................................................................................................................................6
3.2 Introduction ..................................................................................................................................................................6
3.3 Features.........................................................................................................................................................................9
3.4 Technical Specifications .............................................................................................................................................10
4 Components .................................................................................................................................13
4.1 MDU...........................................................................................................................................................................13
4.2 Power Distribution Monitoring Board........................................................................................................................15
5 Installation Guide.......................................................................................................................17
5.1 Site Requirements.......................................................................................................................................................17
5.2 Installation Preparations .............................................................................................................................................17
5.2.1 Obtaining Tools and Materials.................................................................................................................................17
5.2.2 Checking Personnel Requirements ..........................................................................................................................20
5.2.3 Checking the Installation Environment ...................................................................................................................21
5.3 Unpacking and Checking............................................................................................................................................21
5.4 Installing the PDC.......................................................................................................................................................23
5.4.1 Non-Secured Installing the Cabinet on a Concrete Floor ........................................................................................23
5.4.2 Secured Installing the PDC on a Concrete Floor .....................................................................................................24
5.4.2.1 Marking Mounting Holes......................................................................................................................................24
5.4.2.2 Installing Expansion Sleeves ................................................................................................................................25
5.4.2.3 Securing the PDC .................................................................................................................................................26
5.4.3 Installing the PDC on an ESD Floor........................................................................................................................29
5.4.4 Installing a Tail Frame .............................................................................................................................................30

PDU8000 Modular Integrated PDC V1.0
User Manual
Contents
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
vi
5.4.5 Combining Cabinets ................................................................................................................................................35
5.4.6 Verifying the Installation..........................................................................................................................................37
5.5 Connecting Cables......................................................................................................................................................38
5.5.1 Cable Connection Precautions.................................................................................................................................38
5.5.2 Connecting the Ground Cable for the PDC .............................................................................................................41
5.5.3 Connecting Input Power Cables for the PDC ..........................................................................................................42
5.5.4 Connecting Output Power Cables for the PDC........................................................................................................45
5.5.5 Connecting Signal Cables for the PDC....................................................................................................................47
6 Power-On Commissioning........................................................................................................49
6.1 Check Before Power-On Commissioning...................................................................................................................49
6.2 PDC Power-On Commissioning.................................................................................................................................51
7 MDU Commissioning Guide....................................................................................................53
7.1 Interface Description ..................................................................................................................................................53
7.2 Common Operations...................................................................................................................................................63
7.2.1 Information Export ..................................................................................................................................................63
7.2.2 Configuration Loading.............................................................................................................................................64
7.2.3 Modbus Protocol Expansion....................................................................................................................................66
7.2.3.1 Import MD Config................................................................................................................................................66
7.2.3.2 Extend MD Config ...............................................................................................................................................67
7.3 DIP Switch..................................................................................................................................................................68
8 Operation and Maintenance .....................................................................................................69
8.1 Routine Maintenance..................................................................................................................................................69
8.1.1 Monthly Maintenance..............................................................................................................................................69
8.1.2 Quarterly Maintenance ............................................................................................................................................70
8.1.3 Annual Maintenance ................................................................................................................................................70
8.2 Alarm Reference.........................................................................................................................................................70
8.3 Troubleshooting..........................................................................................................................................................73
8.4 Parts Replacement ......................................................................................................................................................74
8.4.1 Replacing a Circuit Breaker.....................................................................................................................................74
8.4.2 Replacing a Hot-Swap Circuit Breaker....................................................................................................................77
8.4.3 Replacing an MDU..................................................................................................................................................80
8.4.4 Replacing an SPD Module.......................................................................................................................................81
8.4.5 Replacing a Fuse......................................................................................................................................................83
8.4.6 Replacing an Indicator.............................................................................................................................................85
8.4.7 Replacing a Power Distribution Monitoring Board .................................................................................................87
8.4.8 Replacing an Electricity Meter ................................................................................................................................88
A PDC Silk Screen Description...................................................................................................90
B Common Cable Preparation Methods....................................................................................91
C Acronyms and Abbreviations..................................................................................................93

PDU8000 Modular Integrated PDC V1.0
User Manual
1 User Manual Usage
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
1
1 User Manual Usage
This chapter describes the notes for using the integrated PDC user manual.
Before using this document, read through and keep in mind the safety precautions in this
document, the precautions in each chapter or section, and the cautions and notes for
operations.
Before using this document, get familiar with the actual configuration and application
scenario of the integrated PDC.
Before using this document, make available the documents delivered with each
component.
Put on necessary protective equipment such as the safety helmet and gloves before
entering the site.
Before performing an operation, ensure that the prerequisites are met. Otherwise, the
expected result may not be achieved. More seriously, equipment damage and personal
injury may occur.
The system configuration parameters are essential to reliable running of the system.
Improper modifications of parameters may easily cause abnormal running status, or even
damage to the system. You are not allowed to modify configuration parameters without
permission when using the integrated PDC. If a modification is necessary, contact
Huawei technical support. Huawei shall not be responsible for any loss caused by
unauthorized configuration modification.
Some parameters mentioned in this document should be provided and configured by
onsite technical support engineers based on the actual application of the integrated PDC.
Operations mentioned in the chapters, sections, or procedures marked "Optional" can be
performed depending on the actual configuration and requirements of the integrated
PDC.

PDU8000 Modular Integrated PDC V1.0
User Manual
2 Safety Precautions
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
2
2 Safety Precautions
2.1 General Safety Precautions
Overview
To ensure safety of humans and the equipment, pay attention to the safety symbols on the
equipment and all the safety instructions in this document.
The "Note", "CAUTION", "WARNING", and "DANGER" statements in this document do not
represent all the safety instructions. They are only supplements to the safety instructions.
Local Safety Regulations
When operating Huawei equipment, you must follow the local laws and regulations. The
safety instructions in this document are only supplements to the local laws and regulations.
Personnel Requirements
Personnel who plan to install, operate, and maintain Huawei equipment must be thoroughly
trained, understand all necessary safety precautions, and master correct operation methods.
Only trained and qualified personnel are allowed to install, operate, and maintain the
equipment.
Only qualified professionals are allowed to remove safety facilities and check the
equipment.
Only personnel certified or authorized by Huawei are allowed to replace or change the
equipment or components (including software).
Any fault or error that might cause safety problems must be reported immediately to a
supervisor.
Grounding Requirements
Equipment to be grounded must meet the following requirements:
When installing the device, always make the ground connection first. When removing
the device, disconnect the ground cable at the end.
Do not damage the ground conductor.
Do not operate the device in the absence of a properly installed ground conductor.

PDU8000 Modular Integrated PDC V1.0
User Manual
2 Safety Precautions
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
3
The device (or system) must be connected permanently to the protection ground before
operation. Before operating the device, check its electrical connection to ensure that it is
securely grounded.
Human Safety
Do not operate the device or cables during thunderstorms.
In the case of a thunderstorm, disconnect theAC power supply, and do not use fixed
terminals or touch the terminals or antenna connectors.
Before operating the device, put on electrostatic discharge (ESD) clothes, ESD gloves,
and an ESD wrist strap. Do not wear conductive articles such as jewelry or watches
when you operate the device.
In the case of fire, immediately leave the building or the equipment room, and turn on
the fire alarm bell or make an emergency call. Do not enter a building that is on fire.
Equipment Safety
The device must be fixed securely on the floor or to other immovable objects such as
walls or mounting racks before operation.
Do not block the ventilation vents while the device is operating.
Tighten the screws using tools when installing panels.
After the installation, remove packing materials from the equipment area.
2.2 Electrical Safety
High Voltage
The high voltage power supply provides power for the device operation. Direct or indirect
contact (especially with a damp object) with the high voltage power supply may result in
serious injury.
Non-standard and improper high voltage operations may result in fire and electric shock.
High Electrical Leakage
Ground the device before powering it on. Otherwise, personal injury or device damage may
be caused by high electrical leakage.
If a "high electrical leakage" tag is present on the power terminal of the device, you must
ground the device before powering it on.

PDU8000 Modular Integrated PDC V1.0
User Manual
2 Safety Precautions
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
4
Power Cable
Do not install or remove power cables when the device is on. Transient contact between the
core of the power cable and the conductor may generate electric arcs or sparks, which may
cause fire or injury to human eyes.
Before installing or removing a power cable, turn off the power switch.
Before connecting a power cable, verify that the label on the power cable is correct.
Fuse
To ensure that the system runs safely, if a fuse is to be replaced, the new fuse must be of the
same type and specifications.
2.3 Environmental Safety
This section describes environmental safety precautions.
Do not place or operate a device in a flammable, explosive, or smoky environment.
Operating any electronic device in a flammable environment can be fatal.
2.4 Mechanical Safety
Moving Sharp Objects
Wear protective gloves when moving sharp objects.
Moving Heavy Objects

PDU8000 Modular Integrated PDC V1.0
User Manual
2 Safety Precautions
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
5
Be careful to prevent injury when moving heavy objects.
A power distribution cabinet is heavy. It is recommended that you move it with the help of
a tool such as the pallet truck.
2.5 Laying Out Cables
Binding Signal Cables
Signal cables must be bound separately from strong-current cables and high-voltage cables.
Laying Out Power Cables
When the temperature is very low, violent impact or vibration may damage the power cable
sheathing. To ensure safety, comply with the following requirements:
Power cables should be laid out or installed only when the temperature is higher than
0°C.
Store power cables for at least 24 hours at room temperature before laying out them if
they were previously stored at sub-0ºC.
Handle power cables with caution, especially at a low temperature. Do not drop the
power cables directly from the vehicle.

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
6
3 Overview
3.1 Product Model
Figure 3-1 Product Model
3.2 Introduction
The integrated PDC is an intelligent AC PDC especially designed for small- and
medium-sized modular data centers. It combines air conditioner PDC, and IT PDC, features
space saving, cost saving, and high integration, and applies to the power supply and
distribution system of small- and medium-sized modular data centers.
When the load power is small, the air conditioner and IT power distribution functions can be
integrated in a cabinet to save installation space and reduce costs.
The integrated PDC, as the EOS, provides power supply to air conditioners and IT loads in
the modular data center.

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
7
Figure 3-2 Position of the PDC in the power supply and distribution network a modular data
center
Figure 3-3 Position of the PDC in the power supply and distribution network
Both IT power distribution input of the integrated PDC and power distribution input of the air
conditioner have single-input and dual-input scenarios. The appearance of the cabinets is also
similar.
The following figure uses the dual-input scenario as an example for IT power distribution and
air conditioner power distribution.

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
8
Figure 3-4 Integrated PDC

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
9
Figure 3-5 Integrated PDC front panel
(1) IT power distribution
input indicator
(2) IT power distribution
input circuit breaker
(3) IT power distribution
SPD and SPD circuit
breaker
(4) IT power distribution
output circuit breaker
(5) Power distribution
monitoring board
(6) Air conditioner power
distribution input indicator
(7) Air conditioner power
distribution input circuit
breaker
(8) Light output circuit
breaker
(9) Air conditioner power
distribution SPD and SPD
circuit breaker
(10) Air conditioner power
distribution output circuit
breaker
3.3 Features
The integrated PDC complies with the IEC 60950-1 and GB7251.1. Modular design is
adopted for the electrical devices and structural components, providing the following features:
Optimal security protection for human and devices

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
10
High operation reliability and continuity
Compact and space-saving design
Reasonable and practical integration of functional units
Comprehensive and intelligent power management
Uniform and elegant appearance
3.4 Technical Specifications
Table 3-1 Technical specifications of the integrated PDC
Item
Specifications
Engineering
features
Dimensions (H x W x
D) (mm)
Basic dimensions: 2000 x 600 x 1100,
2000 x 600 x 1200
Expanded dimensions: 2200 (including a
top frame) x 600 x 1200
Weight (kg)
< 350
Operating temperature
(°C)
–5 to +40
Operating humidity
(RH)
5%–95%
Altitude (m)
≤ 2000 (If the altitude exceeds 2000 m, the
device is derated based on GB/T3859.2-93.)
Transportation/storage
temperature (°C)
–40 to +70
Enclosure protection
level
IP20
Cabling
1100 mm deep cabinet: routed in and out
from the top
1200 mm deep cabinet: routed in and out
from the top, or routed in from the bottom
and out from the top
Maintenance mode
Operated from the front and maintained from
the rear
Installation mode
Installed on an ESD floor or concrete floor
Electrical
specifications
Rated voltage (V AC)
380/400/415
Rated insulation
voltage (V AC)
690
Rated frequency (Hz)
50/60
Rated operating
current (A)
IT power distribution input: 160/250
Air conditioner power distribution input:

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
11
Item
Specifications
160/250
IT power distribution
input mode
One 3-pole 160 A MCCB input
One 3-pole 250 A MCCB input
Two 3-pole 160 A MCCB inputs
Two 3-pole 250 A MCCB inputs
Air conditioner power
distribution input
mode
One 3-pole 160 A MCCB input
One 3-pole 250 A MCCB input
Two 3-pole 160 A MCCB inputs
Two 3-pole 250 A MCCB inputs
Output switch (for
standard
configuration)
IT power distribution branch: a maximum
of 48 branches (single-phase), a maximum
40 A circuit breaker for each branch
Air conditioner power distribution branch:
a maximum of 16 branches (three-phase), a
maximum 63 A circuit breaker for each
branch
(Optional) Branch temperature monitoring,
Hot-Swap Circuit Breaker
Lighting switch
Air conditioner two inputs: one 1-pole 10 A x
6
Air conditioner one input: one 1-pole 10 A x 3
Surge protection
Level C. Nominal discharge current In (8/20
µs) = 20 kA, maximum discharge current Imax
(8/20 µs) = 40 kA; voltage protection level Up
(20 kA, 8/20 μs) ≤ 1.8 kV (L-N)/≤ 1.0 kV
(N-PE)
Monitoring
function
Detection
Three-phase input voltage, current, frequency,
active power, reactive power, electric energy,
power factor, and temperature
Communication mode
Supports the Modbus TCP protocol and
Modbus RTU protocol.
Certification
compliance
current transformer (CE) and China Compulsory Certification (CCC)
Table 3-2 Input circuit breaker derating
Type
Circuit Breaker Capacity
Derating Coefficient
Single input
250 A
0.9
160 A
0.9
Dual inputs
250 A
0.9

PDU8000 Modular Integrated PDC V1.0
User Manual
3 Overview
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
12
Type
Circuit Breaker Capacity
Derating Coefficient
160 A
0.9
Table 3-3 Output circuit breaker derating
Type
Circuit Breaker Capacity
Derating Coefficient
Fixed circuit breaker
63 A
0.75
40 A
0.8
Hot-swappable circuit
breaker
63 A
0.65
40 A
0.75

PDU8000 Modular Integrated PDC V1.0
User Manual
4 Components
Issue 07 (2019-04-15)
Copyright © Huawei Technologies Co., Ltd.
13
4 Components
4.1 MDU
The monitor display unit (MDU) allows you to set power distribution cabinet (PDC)
parameters, view the running status and alarms, and upgrade software. The MDU does not
support web pages.
Figure 4-1 MDU
(1) Alarm indicator
Table 4-1 Alarm indicator status
State
Color
Meaning
On
Red
A critical alarm has been generated, and the buzzer is
buzzing constantly.
Yellow
A major alarm has been generated, and the buzzer buzzes
at intervals of 0.5s.
Other manuals for PDU8000 Series
29
Table of contents
Other Huawei Power Distribution Unit manuals

Huawei
Huawei DPU40D-N06A3 User manual

Huawei
Huawei PDU8000 Series User manual

Huawei
Huawei New Main Way 2.0 User manual

Huawei
Huawei PDU8000 Series User manual

Huawei
Huawei PDU8000 Series User manual

Huawei
Huawei PDC-0038V4ACIOA User manual

Huawei
Huawei PDU8000 Series User manual

Huawei
Huawei PDC-0038V4ACIOA User manual

Huawei
Huawei UPS2000-MBS-16A User manual

Huawei
Huawei PDU8000 Series User manual