PDU8000 Transformer Power Distribution Cabinet-T
Quick Installation Guide
PDU8000 变压器配电柜-T
快速安装指南
Issue: 01
文档版本:01
PDC Code:02403787
配电柜编码:02403787
Date: 2017-03-31
发布日期:2017-03-31
Model Description / 设备型号说明
The following figure shows the model naming conventions for a transformer PDC.
变压器配电柜的设备型号说明如下所示:
华为技术有限公司
深圳市龙岗区坂田华为总部办公楼
邮编:518129
www.huawei.com
4008302118
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People's Republic of China
www.huawei.com
Powering On and Commissioning / 上电调测
Switch on the upper-level circuit breaker and the input circuit breaker to power on the cabinet. The indicators turn on.
合上前级电源空开和配电柜输入空开使机柜通电,机柜电源指示灯点亮。
Precautions / 安全注意事项
To ensure safety of humans and the equipment, pay attention to the safety symbols on the equipment and all the safety
instructions in this document. The "NOTE", "CAUTION", and "WARNING"marks in this document do not represent all
the safety instructions. They are only supplements to the safety instructions. When operating Huawei equipment, in
addition to following the general precautions in this document, follow the specific safety instructions given by Huawei.
Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design,
production,and usage standards.
为保障人身和设备安全,在安装、操作、维护设备时,请遵循设备上标识及手册中说明的所有安全注意事项。手册中的
“安全警告”、“注意”、“说明”事项,并不代表所应遵守的所有安全事项,只作为所有安全注意事项的补充。在进行
本公司产品、设备的各项操作时,必须严格遵守由华为公司提供的相关设备注意事项和特殊安全指示。手册中列出的“安
全警告”仅代表了华为公司知道的部分,华为公司不承担任何因违反通用安全操作要求或违反设计、生产和使用设备安全
标准而造成损失的责任。
Safety Precautions / 遵守所有安全注意事项
Copyright © Huawei Technologies Co., Ltd. 2017. All rights reserved.
版权所有 © 华为技术有限公司2017。保留一切权利。
Local Safety Regulations / 遵守当地法规和规范
Whenoperating the equipment, you must follow the local laws and regulations.
操作设备时,应遵守当地法规和规范。
Personnel Requirements / 人员要求
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment.
负责安装维护华为设备的人员,必须先经严格培训,掌握正确的操作方法及安全注意事项后,方可安装、操作和维护设备。
Before installation, get familiar with the following documents:
安装开始前,确保已经学习并掌握了除本文档以外的以下文档信息:
Parts documents / 随货的其它部件资料
Human Safety / 人身安全
After the installation is completed, verify the items in the following tables before power-on.
安装完成后,在上电前,请根据下表内容进行检查。检查合格后方可进行上电操作。
Checking After Installation / 安装后检查
Electrical connection checklist / 电气连接检查
To ensure human safety, connect the ground cable first when connecting cables.
配电柜接线时,需按照本指南指导的接线顺序,首先安装地线以确保人身安全。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment, and they must
understand basic safety precautions to avoid hazards.
系统接线的操作人员必须具备基本的安全操作知识,需经过培训,掌握正确的操作方法,并具有相应作业资格。
To prevent electric shocks, get tools insulated and wear electrostaticdischarge (ESD) gloves when connecting cables.
进行接线操作时,操作人员需对工具进行绝缘处理,佩戴绝缘手套,避免触电。
After the installation and commissioning, do not open the rear door or side panel. Otherwise, electric shocks may occur.
安装调测完成后,请勿擅自打开后门和侧板,否则会有触电的危险。
6
5
Cable installation checklist / 线缆安装检查
No. /
编号 Check That / 检查项
1
All bolts are tightened, especially the bolts used for electrical connection. Flat washers and spring washers are
installed properly in the correct sequence.
所有螺栓都要拧紧(尤其要注意电气连接部分),平垫、弹垫要齐全,且不能装反。
2
Cables are bundled neatly, and cable ties are secured evenly and properly in the same direction.
电缆绑扎应整齐美观,线扣间距均匀,松紧适度,朝向一致。
3
Cables are routed for ease of future maintenance and expansion.
电缆布放应便于维护和将来扩容。
4
There is no unnecessary adhesive tape or cable tie on the cables.
线缆上无多余胶带、扎带等遗留。
5
Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing.
接线端子处的裸线及线鼻柄应用绝缘胶带缠紧,或套热缩套管,不得外露。
6
The power and signal cables are routed in accordance with the weak- and strong-current cable routing
specifications and the cable routing plan.
电源线走线和监控线走线满足强弱电走线要求,符合系统走线规划。
Switch on SPD circuit breakers and the input circuit breakers.
闭合防雷空开,合上输入空开。
1
NOTE / 说明
1. Power cables routed inside the cabinet need to be secured using cable ties.
各电源线缆在柜内走线时,需要用扎带绑扎。
2. The following table lists the colors of the power cables for your reference. The local cable color standards prevail.
各电源线缆对应的颜色如下表所示。图中线缆颜色仅供参考,请以当地电源线缆标准为准。
Connecting signal cables / 信号线接线
NOTE / 说明
For the definitions of wiring terminal blocks from the RS485 port to the management system, see the Schematic
Diagram delivered with the product.
RS485接口至管理系统的接线端子排定义参见随机附带的原理图。
Hardware installation checklist / 硬件安装检查
5
This guide is for reference only. The actual product prevails.
本指南仅供参考,内容如有改动,请以实物为准。
Check that parameters displayed on the PDC LCD are normal. Then switch on all output circuit breakers in sequence
and check that the voltage of each output branch is normal by using a multimeter.
检查配电柜显示屏显示是否正常。若正常,逐一合上所有输出空开,用万用表检查输出支路电压是否正常。
After the check, switch off all circuit breakers in sequence, and disconnect the power supply.
确认参数正常后,依次断开所有空开,再断开电源。
Color / 颜色 Connection / 接线说明
Yellow / 黄色
To L1 / 接L1
Green / 绿色
To L2 / 接L2
Red / 红色
To L3 / 接L3
Yellow and green / 黄绿色
To PE copper bar (ground cable) / 接PE排(地线)
Blue / 蓝色
To N copper bar / 接N排
Red / 红色
To BAT+ / 接电池正
Black / 黑色
To BAT- / 接电池负
No. /
编号 Check That / 检查项
1
All cables are correctly connected based on the Schematic Diagram.
参考原理图,检查所有接线是否正确。
2
Ground cables are securely connected.
检查地线是否已连接牢靠。
3
Redundant parts of the ground cables and power cables are cut off instead of coiled.
电源线、地线的余长应被剪除,不能盘绕。
4
Phase cables are connected properly.
各相位连线正确。
5
Power cables and ground cables are routed and bundled separately from other types of cables.
电源线、地线在布放时应与其他电缆分开绑扎。
6
All circuit breakers are OFF.
所有空开处于“OFF”状态。
No. /
编号 Check That / 检查项
1
The cabinet is clean, without dust or sundries.
机柜清洁干净,无灰尘、污物,柜内无杂物。
2
The paint on the cabinet exterior is intact. If paint flakes off, repaint that area immediately to avoid corrosion.
外部漆饰应完好,如有掉漆,立即补漆,以防止腐蚀。
3
The cabinet door and lock work properly.
柜门开闭灵活,门锁正常。
4
All labels are correct, clear, and complete.
各种安全警告标识正确、清晰、齐全。
5
The surrounding area of the cabinet contains no waste tape, cable ties, paper, or packing materials.
机柜周围不得有胶带、扎带线头、纸屑和包装袋等施工遗留物。
PDU8000–XXXX AC XX TC XXXX
Transformer power distribution cabinet / 变压器配电柜
V4: Rated 380 V to 415 V / V4: 额定380V~415V
V5: Rated 480 V / V5: 额定480V
V7: Rated 200 V to 220 V / V7: 额定200V~220V
AC power supply / 交流电
Power distribution capacity / 配电容量
Power distribution cabinet / 配电柜
Serial number / 流水码
Data center power distribution product / 数据中心配电产品
1QF
QF1-QF6
2QF
QF7-QF12 QF13-QF15
QF28-QF30QF22-QF27QF16-QF21
FS QFS FAN
Open the packing case, and check that all components listed in the packing list are intact. Ensure that all components
are available before cleaning up the package materials. If components or fittings are damaged during transportation or
do not comply with the order contract, make records onsite and contact the local Huawei regional office or
representative office immediately.
打开包装箱,根据装箱清单检查设备的配件是否齐全、是否在运输过程中损坏。清除包装材料之前,要确保所有配件都
已找到。如设备和配件在运输中损坏或与订货合同不符,应及时现场记录,并与华为公司当地分公司或办事处代表联系。
Circuit breaker Layout / 空开示意图
Tools / 安装工具 Installing a transformer PDC / 安装变压器配电柜
Checking Before Installation / 安装前检查
Cabinet dimensions (H x W x D): 2500 mm x 800 mm x 1200 mm
机柜尺寸(高×宽×深):2500mm×800mm×1200mm
NOTE / 说明
3
24
Installing the Cabinet / 安装机柜
Move the cabinet from the wood pallet to the ground.
将机柜从木栈板移动至地面。
Plan the cabinet installation position based on the following figure.
参考下图规划机柜安装位置。
Drill holes using a hammer drill and install expansion bolts.
用冲击钻钻孔并安装膨胀螺栓。
Tighten the bolts in diagonal order.
按对角线顺序交叉紧固螺栓。
If the cabinet is installed on a support, skip steps 2
and 3.
如果机柜安装在支架上,步骤2、3可省略。
NOTE / 说明
Installing Input and Output Cables / 安装输入输出线缆
Input cables / 输入接线
800
1200 1036
NOTE / 说明
The following table lists the tightening torque of different bolts.
各螺栓紧固扭矩说明如下表所示。
Bolts /
螺栓 Recommended Torque
/ 推荐扭矩 (N·m)
M8
13
M10
27
M12
47
M16
120
Measuring tape
卷尺
Adjustable wrench
活动扳手
Electroprobe
电笔
Phillips/Flat-head
screwdriver
十字 / 一字螺丝刀
Level
水平尺
Claw hammer
羊角锤
Diagonal pliers
斜口钳
COAX crimping tool
压线钳
Wirestripper
剥线钳
Protective gloves
防护手套
Socket wrench
套筒扳手
Heat gun
热风枪
Electrician'sknife
电工刀
Hydraulic pliers
液压钳
Insulated gloves
绝缘手套
Step ladder (2 m)
人字梯(2m)
Short-handle Phillips
screwdriver (85 mm)
短柄十字螺丝刀(85mm)
Hammer drill
冲击钻
Output cables / 输出接线
Right view of the transformer PDC / 变压器配电柜右视图
NOTE / 说明
The ground terminal is identified by a
sign.
接地端子通常以 标识。
S200
SH200
S200M
S200P
NOTE / 说明
Surge protective
device (SPD) and
SPD circuit breakers
防雷器及防雷空开
Output circuit
breakers
输出空开
Cables are routed in and out from the top.
进出线方式为:上进上出线。
The positions of cable holes in the figure
are for reference only. The actual
product prevails.
图中出线孔位置仅为示意,具体请以实物
为准。
NOTE / 说明
Fan circuit
breakers
风扇空开
Input circuit breaker
输入空开
The positions and number of circuit
breakers in the figure are for
reference only. The actual product
prevails.
空开位置和数量仅为示意,请以实
物为准。
NOTE / 说明
Left view of the transformer PDC / 变压器配电柜左视图
Unit: mm
单位:mm
Insert bolts into the mounting holes and partially tighten the bolts.
将螺栓插入安装孔并预紧固。
Align the cabinet with mounting holes.
将机柜对齐安装孔。
Input circuit breaker
输入空开
S200
SH200
S200M
S200P
S200
SH200
S200M
S200P
Left view of the transformer PDC / 变压器配电柜左视图

Other manuals for PDU8000 Series

29

Other Huawei Power Distribution Unit manuals

Huawei PDC-0038V4ACIOA User manual

Huawei

Huawei PDC-0038V4ACIOA User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei New Main Way 2.0 User manual

Huawei

Huawei New Main Way 2.0 User manual

Huawei PDC-0038V4ACIOA User manual

Huawei

Huawei PDC-0038V4ACIOA User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei UPS2000-MBS-16A User manual

Huawei

Huawei UPS2000-MBS-16A User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei PDU8000 Series User manual

Huawei

Huawei PDU8000 Series User manual

Huawei DPU40D-N06A3 User manual

Huawei

Huawei DPU40D-N06A3 User manual

Popular Power Distribution Unit manuals by other brands

Compaq 207590-B21 - Power Distribution Unit Strip Quick install guide

Compaq

Compaq 207590-B21 - Power Distribution Unit Strip Quick install guide

MGE UPS Systems Rackmount PDU installation guide

MGE UPS Systems

MGE UPS Systems Rackmount PDU installation guide

Ediseja 21 LSU 110/32 user manual

Ediseja 21

Ediseja 21 LSU 110/32 user manual

ASCO POWER TECHNOLOGIES 425 Installation & operation manual

ASCO POWER TECHNOLOGIES

ASCO POWER TECHNOLOGIES 425 Installation & operation manual

D&R ELECTRONICS PDU42-8S Installation & operation manual

D&R ELECTRONICS

D&R ELECTRONICS PDU42-8S Installation & operation manual

LEGRAND Server Technology PRO3X user guide

LEGRAND

LEGRAND Server Technology PRO3X user guide

ABB SMISSLINE TP quick start guide

ABB

ABB SMISSLINE TP quick start guide

Siemens SIVACON 8PS BD2 Series installation instructions

Siemens

Siemens SIVACON 8PS BD2 Series installation instructions

Electroneering SureStart Battery Power Protector owner's manual

Electroneering

Electroneering SureStart Battery Power Protector owner's manual

Allen-Bradley 140G2-K H Series manual

Allen-Bradley

Allen-Bradley 140G2-K H Series manual

ABB Relion REQ650 Product guide

ABB

ABB Relion REQ650 Product guide

Raritan Dominion Px Quick installation and setup guide

Raritan

Raritan Dominion Px Quick installation and setup guide

Minuteman RPM 1609 Specifications

Minuteman

Minuteman RPM 1609 Specifications

Eaton ePDUG3 troubleshooting guide

Eaton

Eaton ePDUG3 troubleshooting guide

ICT Distribution 3 Series instruction manual

ICT

ICT Distribution 3 Series instruction manual

Emerson Network Poewr MPH2 user manual

Emerson

Emerson Network Poewr MPH2 user manual

PSC PowerStar EuroLiFE Operation manual

PSC

PSC PowerStar EuroLiFE Operation manual

Essential Audio Tools Mains Multiplier 6+ user manual

Essential Audio Tools

Essential Audio Tools Mains Multiplier 6+ user manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.