PDU8000 Power Distribution Box-T
Quick Guide
PDU8000 配电箱-T
快速指南
To ensure safety of humans and the equipment, pay attention to the safety symbols on the equipment and all the safety instructions
in this document. The "NOTE", "CAUTION", and "WARNING" marks in this document do not represent all the safety instructions.
They are only supplements to the safety instructions. When operating Huawei equipment, in addition to following the general
precautions in this document, follow the specific safety instructions given by Huawei. Huawei will not be liable for any consequences
that are caused by the violation of safety regulations and design, production, and usage standards.
为保障人身和设备安全,在安装、操作、维护设备时,请遵循设备上标识及手册中说明的所有安全注意事项。手册中的
“安全警告”、“注意”、“说明”事项,并不代表所应遵守的所有安全事项,只作为所有安全注意事项的补充。在进行
本公司产品、设备的各项操作时,必须严格遵守由华为公司提供的相关设备注意事项和特殊安全指示。手册中列出的“安
全警告”仅代表了华为公司知道的部分,华为公司不承担任何因违反通用安全操作要求或违反设计、生产和使用设备安全
标准而造成损失的责任。
Issue: 01
文档版本:01
Box Code: 02402732-011, 02402732-012, 02402732-015
配电箱编码:02402732-011, 02402732-012, 02402732-015
Date: 2019-06-05
发布日期:2019-06-05
Copyright © Huawei Technologies Co., Ltd. 2019 All rights reserved.
版权所有 © 华为技术有限公司2019。保留一切权利。
When operating the equipment, you must follow the local laws and regulations.
操作设备时,应遵守当地法规和规范。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment.
负责安装维护华为设备的人员,必须先经严格培训,掌握正确的操作方法及安全注意事项后,方可安装、操作和维护设备。
Before installation, get familiar with the following documents: Parts documents.
安装开始前,确保已经学习并掌握了除本文档以外的以下文档信息:随货的其它部件资料。
The following figure shows the model naming conventions for a power distribution box.
配电箱的设备型号说明如下所示:
To ensure human safety, connect thegroundcable first when connecting cables.
为确保人身安全, 连接电缆时先连接接地电缆。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment, and they must understand
basic safety precautions to avoid hazards.
系统接线的操作人员必须具备基本的安全操作知识,需经过培训,掌握正确的操作方法,并具有相应作业资格。
To prevent electric shocks, get tools insulated and wear electrostatic discharge (ESD) gloves when connecting cables.
进行接线操作时,操作人员需对工具进行绝缘处理,佩戴绝缘手套,避免触电。
1
1Precautions / 安全注意事项
Safety Precautions / 遵守所有安全注意事项
1.1
Local Safety Regulations / 遵守当地法规和规范
1.2
Personnel Requirements / 人员要求
1.3
Human Safety / 人身安全
1.4
2Model Description / 设备型号说明
Open the packing case, and check that all components listed in the packing list are intact. Ensure that all components
are available before cleaning up the package materials. If components or fittings are damaged during transportation or
do not comply with the order contract, make records onsite and contact the local Huawei regional office or
representative office immediately.
打开包装箱,根据装箱清单检查设备的配件是否齐全、是否在运输过程中损坏。清除包装材料之前,要确保所有配件都
已找到。如设备和配件在运输中损坏或与订货合同不符,应及时现场记录,并与华为公司当地分公司或办事处代表联系。
1. There are three types of 02402732-011 and 02402732-012 and 02402732-015 cabinets, which are similar. The
quick guide use the 02402732-011 as an example.
02402732-011、02402732-012和02402732-015编码有三种机柜,机柜相似,快速指南以02402732-011为例进
行介绍。
2. Box dimensions (H x W x D): 1200 mm x 600 mm x 300 mm
箱体尺寸(高×宽×深):1200mm×600mm×300mm
NOTE / 说明
Measuring tape
卷尺
Adjustable wrench
活动扳手
Electroprobe
电笔
Phillips screwdriver
十字螺丝刀 Claw hammer
羊角锤
Diagonal pliers
斜口钳
Crimping tool
压线钳
Wire stripper
剥线钳
Protective gloves
防护手套
Socket wrench
套筒扳手
Heat gun
热风枪
Electrician's knife
电工刀
Hydraulic pliers
液压钳
Insulated gloves
绝缘手套
Step ladder (2 m)
人字梯(2m)
Flat-head screwdriver
一字螺丝刀
Short-handle Phillips
screwdriver (85 mm)
短柄十字螺丝刀(85mm)
3
2
Hammer drill
冲击钻
NOTE / 说明
The following table lists the tightening
torque of different bolts.
各螺栓紧固扭矩说明如下表所示。
Unit: mm
单位:mm
Rear view of power distribution box
配电箱背部视图
Do not replace original components of the product during installation without authorization. If the replacement is
required, contact Huawei engineers.
安装过程中,产品出厂原配部件不能擅自更换,如需更换,请联系华为工程师。
Bolts /
螺栓 Recommended Torque
/ 推荐扭矩 (N·m)
M8 13
M10 27
M12 47
M16 120
Front view of power distribution box
配电箱前视图
4Power Distribution Box Layout / 配电箱布局图
3Tools / 安装工具 5Installing a Power Distribution Box / 安装配电箱
Checking Before Installation / 安装前检查
5.1
Installing the power distribution Box / 安装配电箱
5.2
1. Plan the PDB installation position based on the following figure.
参考下图规划配电箱安装位置。
3. Align the four holes on the power distribution box with the secured bolts. Then move the power distribution box
downwards until the holes fit into the bolts.
将配电箱上面的4个安装孔对应扣入紧固好的螺栓,向下移动,使得配电箱安装孔扣入螺栓。
2. Drill holes using a hammer drill and install expansion bolts.
用冲击钻钻孔并安装膨胀螺栓。
5. Tighten the four bolts to secure the power distribution box to the wall.
拧紧4个螺栓,将配电箱固定在墙上。
4. Open the door of the power distribution box, and remove the partition board.
将配电箱的门打开,拆除内部隔离板。