
Page 4
“Written records of testing shall be kept by the owner for inspection by the authority having jurisdiction.”
SERVICING SHOULD BE PERFORMED BY QUALIFIED PERSONNEL.
Consult Customer Service or visit www.iotaengineering.com for current warranty information.
FULL WIRING DIAGRAM
Load Calibration
48 hours after the unit connector is joined, the ILB CP20 HE AELR HV will conduct a Load Calibration. Note: after the Load Calibration is
complete, any changes to the LED load that will aect its nominal input voltage will necessitate a new Load Calibration. See Table 2 for the
sequence of button presses to conduct a manual Load Calibration.
ILB CP HE CLS - WITH TCTS TEST ACCESSORY
ILB-CP-HE-CLS.EPS
AC (NORMAL)
DRIVER
IOTA ILB CP HE AELR
EMERGENCY DRIVER
LED
LOAD
WHITE
WHITE
BLK/WHT
BLK/WHT
COMMON
UNSWITCHED
24/7 POWER BLK/ORG (120 TO 277V, 50/60HZ)
AC INPUT (120 TO 277V)
SWITCHED OR
UNSWITCHED
HOT
TCTS
TEST ACCESSORY
RED (+)
BLUE (-)
RED/WHT (+)
BLUE/WHT (-)
LED INPUT(+)
LED INPUT (-)
LED OUTPUT (+)
LED OUTPUT (-)
UNIT
CONNECTOR
RED OR RED/BLK
RED/BLK
WHT/RED
ORANGE
WHITE OR WHT/RED
ORANGE
ATTENTION: DO NOT MATE UNIT CONNECTOR UNTIL
INSTALLATION IS COMPLETE AND AC POWER IS SUPPLIED.
TEST ACCESSORY LEADS-OBSERVE
PROPER POLARITY WIRING.
PRE-CONNECTED QUICK DISCONNECT
TERMINALS ARE ON SELECT MODELS ONLY.
MATE TERMINALS WITH SIMILAR COLORED
WIRES IF REPLACING A UNIT.
CAP THE LEDCODE WIRES
IF NOT CONNECTED TO THE
LEDCODE BUS
YELLOW
BROWN
LEDCODE (+)
LEDCODE (-)
3
MATE UNIT CONNECTOR AFTER
INSTALLATION IS COMPLETE AND
AC POWER IS SUPPLIED
4
4
3
33
3
TESTING AND MAINTENANCE
Automatic Testing
The ILB CP20 HE AELR HV is designed to automatically test its emergency
function for 60 seconds monthly and 90 minutes annually. Automatic
testing will begin within 28 days after the unit is connected to A.C. Power
and the batteries have been installed.
If the ILB CP20 HE AELR HV detects a failure it will ash a status code
through the TCTS. See Table 1: TCTS Self Diagnostic Status Codes to identify
the fault state of the ILB CP20 HE AELR HV. Test results will also be acces-
sible in the connected emergency lighting system software application (if
connected).
Manual Testing
Manual Testing can be performed on the ILB CP20 HE AELR HV, provided
the unit is fully charged, by pressing and releasing the TCTS. Manual Testing
cannot be initiated until the unit has received a full 24 hour charge. Manual
Testing will not interfere with the automatic testing schedule of the ILB CP20
HE AELR HV and will display the same diagnosis indicators as automatic
testing.
Manual test sequences can be started by pressing the TCTS according to the
patterns listed in Table 2: Manual Test Sequences. A record of this manual test
will be accessible in the connected emergency lighting system software ap-
plication (if connected).
TCTS Color
Flashing Amber Battery is charging
Green Battery is fully charged
O Emergency mode
Flashing Green Unit is performing a test
Flashing Red (Continuous) Electronics failure
Flashing Red (Slow) Battery Failure
Double Flashing RedLoad Failure
Status
Test Type
Quick Test Press and Hold
60-Second Test 2 X Press and Release
90-Minute Test 3 X Press and Release
Load Calibration 4 X Press and Release
Cancel 90-Minute Test 1 X Press and Release
TCTS Button Sequence
Table 1: TCTS Self Diagnostic Status Codes
Table 2: TCTS Manual Test Sequences
Rev. 2108
68E20-109
In case of multiple failures only the highest priority failure will be
indicated. Charge Failure is the highest priority failure, followed by
Battery Failure, followed by Load Failure.
Replacement
Disconnect the unit connector and ensure that AC power is o before replacing an ILB CP20 HE AELR. If the model features quick
disconnect terminals, mate similar colored wire terminals to install replacement.