INDEX
CONTROL UNIT FOR TWO-LEAF GATES GE UNI24R
INSTRUCTIONS AND WARNINGS FOR INSTALLATION, USE AND MAINTENANCE
MANUAL DESTINED FOR USE BY PROFESSIONAL FITTERS ONLY
QUICK INSTALLATION OF LIGHTWEIGHT
GATE WITH 90° OPENING 2
STANDARD INSTALLATION 4
1 WIRING AND CONNECTIONS 7
1.3 GEBOX container installation 7
1.3.1 Control unit extraction 7
1.4 List of electric cables 7
1.5 Preparing the electrics and mains
connection 7
1.6 Introducing the electric wires into the
GEBOX6 7
1.7 Control unit connections 7
1.7.1 Wiring diagram of the right hand side
of the control unit 8
1.7.2 Wiring diagram of the lower part of the
control unit 8
1.7.3 Indicator LEDs 9
2 STARTING UP 9
2.1 Description of the keyboard 9
2.2 Radiocontrolidentication 10
2.2.1 STEPcommandidentication 10
2.2.2 PEDESTRIANcommandidentication 10
2.2.3 Radiocontrolresetting 10
2.2.4 Resettingallidentiedradiocontrols 11
2.2.5 Identicationwithoutusingthekeyboard11
2.3 INITIALISATION 12
2.3.1 Travelandstaggeringidentication 12
2.3.1.1 2-leaf gate 13
2.3.1.2 Single leaf gate 13
3 ADJUSTMENTS 14
3.1.1 Card initialisation 14
3.1.2 Resetting travel and functions 14
3.1.2 Resetting the travel 14
3.2 Function modes 14
3.2.1 Dead man 14
3.2.2 Semi-automatic 15
3.2.3 2-step automatic 15
3.2.4 4-step automatic 15
3.2.5 4-step automatic with stop 15
3.2.6 Condominium 16
3.3 Functions 16
3.3.1 Blackout 16
3.3.2 Pre-ashing 16
3.3.3 Flashing in pause 16
3.3.4 Photo test 16
3.3.5 Photo 1 17
3.3.6 Close after photo 17
3.3.7 Opening ram blow 17
3.3.8 Force 18
3.3.9 Pause time 18
3.3.10 Courtesylight 18
3.3.11 Deceleration in opening and closure. 19
3.3.12 Obstacle detection 19
3.3.13 Pedestrian opening 19
3.4 Fuses 20
3.4.1 Externalfuse 20
3.4.2 Cardfuses 20
3.5 PresetfunctionsF1&F2 20
4 BUFFER BATTERIES (OPTIONAL) 21
4.1 Battery installation in the GEBOX 21
5 DIAGNOSTICS 21
5.1 Malfunction signals 21
6 AUTOMATION USE 22
6.1 Flashing light functions 22
6.2 Automation malfunction 22
7 GENERAL INFORMATION 22
7.1 INFORMATION ON THE MANUFACTURER
7.2 INTENDE USE 22
8 SAFETY INSTRUCTIONS AND
WARNINGS 23
8.1 General instructions and warnings 23
8.2 Storage instructions and warnings 23
9 INSTALLATION 23
9.1 INSTRUCTIONS AND WARNINGS FOR
INSTALLATION 23
10 TESTING AND TRIAL RUN 23
10.1 Testing 23
10.2 FirstUsage 24
11 SAFETY INSTRUCTIONS AND
WARNINGS 24
11.1 Indications and warnings for use 24
12 MAINTENANCE 24
12.1 Maintenance instructions and warnings 24
12.2 Routine maintenance 24
13 DEMOLITION AND DISPOSAL 24
14 MANUFACTURER’S DECLARATION
OF CONFORMITY 25
15 LIST OF RESIDUAL RISKS PRESENT
ON THE AUTOMATION 25
ENGLISH