
2 ©2007 MadCow Rocketry™ Mozzie™ Assembly Mozzie™ Assembly ©2007 MadCow Rocketry™ 3
Please make sure you read all directions and understand how to assemble your model
beforeyoustartconstruction.Itisalsoagoodideatotestteachpartbeforeassembly
–somemanufacturingtolerancesmayrequirelightsandingbeforenalassembly.
Laser cut parts will exhibit varying amounts of charring on the edges depending on the
density of the plywood. The charred edges do not interfere with bonding and do not
need to be cleaned before assembly. In most cases the charring will be cleaned up
duringsandingfornishingandpainting.
Step 1 – Motor Mount Assembly
Testtthecenteringringsoverthemotormounttubeandsandifnecessary.The
ringsshouldhaveasnugtbutlooseenoughtomovetheringoverthemotortube
withoutdeformingit.Alsotesttthecenteringringsinthebodytubeandsandif
necessary. One of the rings will have a notch for the shock cord - this will be the
forward ring. Spread some epoxy on the outside of one end of the motor tube and
slide the ring (without the notch) until there is approximately 1/8” of motor tube exposed.
IMPORTANT:Make sure you clean the motor tube of any epoxy so as not to interfere with
thentangslater.
After the aft ring is dry, make a mark
2” from the other end of the motor
tube. Spread some epoxy on the motor
tube and slide the forward ring (with
the notch) until it aligns with the mark.
NOTE: After this assembly cures, you
may want to cut off any excess motor
tube in front of the forward centering
ring to make more room for the
recovery components.
Step 2 – Shock Cord Attachment
The shock cord in this kit consists of a shorter section of Kevlar and a longer section of
nylon cording. The two sections should be tied together using a single overhand, ring
bendordoublesherman’sknot.TheKevlarsectionwillbeattachedtothemotormount
and the nylon section will be attached to the nose cone.
Wrap the end of the Kevlar shock
cord around the forward end of the
motor tube and tie a square knot or
bowline knot near the notch in the
forward centering ring. Apply some
epoxy to the knot to make sure it
doesn’t come loose later. Make
sure the Kevlar loop is seated against the
forward centering ring so that it will not
interferewiththentangslater.YoucantackwithepoxyorCAtoholdinplace.
1/8” Exposed 2” Exposed
Forward Ring Notch
Fin Fin Tang
Apply CA or
Epoxy to knot
Push cord in corner and
tack with epoxy
Step 3 – Insert Motor Tube Assembly into Body Tube
Wrap the shock chord into a small bundle and stuff it inside the motor tube for this next
step.Makesurethecordpassesoverthenotchintheforwardcenteringring.Testtthe
motortubeassemblyintothebodytubetoensureasnugt.Sandthecenteringringsif
necessary.
Whenyouaresatisedwiththet,spreadsomeepoxyontheinsideofthebodytube
and slide the forward centering ring of the motor assembly into the body tube. Make
Ensureringsareclearofthenslots
Step 4 – Fin Assembly
Testteachofthensintotheprecutnslots.Thenshouldseatrmlyagainstthe
motortube-sandeachnifnecessary.Whenyouaresatisedwiththet,applysome
epoxytotheendofthentangthatwillcontactthemotortubeaswellasthenroot
that will contact the body tube. Also, spread a thin layer of epoxy on each side of the
ntang.Slidethenintoplaceandcheckthealignment.Continuerecheckingthen
alignment until you are sure the epoxy has set. Clean any excess epoxy from around the
njoint.Repeatfortheremainingns.Next,applyepoxylletstobothsidesofeachn.
Carefullysmooththeepoxylletswithyourngerbeforetheepoxysets.Alloweachllet
tosetbeforerotatingtheairframeforthenextllet.
Step 5 – Launch Lug Attachment
Mark the CG point along the launch lug line you made in the previous step. Make sure
you measure the CG point from the tip of the nose cone and NOT the end of the body
tube. Apply a small amount of epoxy on the launch lug line about ¾” long on the CG
mark. Press one of the launch lugs into the epoxy and ensure that it is aligned with the
launchluglinepreviouslydrawnonthebodytube.Youcansitedownthetubeandlook
through the launch lug to make sure it is straight. Similarly epoxy the second launch lug
about 1/2” from the aft end of the body tube. Site down both launch lugs and make sure
they are both aligned. If you have a ¼” launch rod, you can use this to ensure that both
lugs are aligned properly.
sure you have the motor assembly facing the right way! (The shock cord goes
over the forward centering ring) Spread some more epoxy on the inside edge of the
body tube before sliding the rear centering ring into the body tube. Continue sliding the
assembly inside the body tube until the aft end of the motor tube is even with the aft end
of the body tube. It’s a good idea to
testtanineachslotherebeforethe
epoxy sets. Hold the body tube with
the motor tube assembly down until the
epoxy sets. Make sure the weight of
the motor assembly doesn’t cause it to
slide out of alignment.
Usingadoorjamorsmallsectionofanglestock,pencilalinehalfwaybetweentwoof
thensthatextendsfromthefronttothebackofthebodytube.Thislinewillbeused
later to align the launch lugs.
Step 6 – Nose Cone Assembly
At this point, pack the chute and assemble the rocket. Insert the largest motor that you
intendtoy(orsimulatetheweightwithanappropriatesubstitute)andensuretheCGis
forwardofthepointdenedinthespecicationsontherstpage.TheCGismeasured
fromthetipofthenosecone.IftheCGisbehindthespeciedpoint,addweightinside
noseconeuntiltheCGisforwardofthespeciedpoint.Youcanalsochoosetoya
lighter motor.
Whenyouaresatisedwiththebalanceofyourmodel,tiesomeknotsintheendofthe
nylon section of the shock cord and stuff the shock cord into the hole in the base of the
nose cone. Fill the hole with some epoxy to secure the shock cord.
Yourmodelisnowreadytopaint.