
I
Contents
Consultation with Megger ............................................................. 3
Terms of Warranty ......................................................................... 4
1Description .......................................................................... 4
1.1 General...................................................................................................4
1.2 Lifting and carrying .................................................................................4
1.3 Design ....................................................................................................4
1.4 Operation as a complete test- and fault location system Surgeflex........5
1.5 Function..................................................................................................6
1.5.1 Shock discharge generator.....................................................................6
1.5.2 Arc reflection method (ARM) ..................................................................8
1.5.3Sheath fault location...............................................................................8
1.5.4 High voltage testing up to 17 kV (SPG 12) or 24 kV (SPG 16)...............9
1.6 Power Supply .........................................................................................9
1.7 Technical characteristics SPG 12.........................................................10
1.7.1 Shock discharge operation "SWG".......................................................10
1.7.2 Arc Reflection Method "ARM"...............................................................10
1.7.3 Sheath fault location "MFO" .................................................................10
1.7.4 High voltage testing "HPG"...................................................................10
1.7.5 General data:........................................................................................10
1.8 Technical characteristics SPG 16.........................................................11
1.8.1 Shock discharge operation "SWG".......................................................11
1.8.2 Arc Reflection Method "ARM"...............................................................11
1.8.3 Sheath fault location "MFO" .................................................................11
1.8.4 High voltage testing "HPG"...................................................................11
1.8.5 General data:........................................................................................11
1.9 Scope of supply....................................................................................12
1.9.1 Standard accessories:..........................................................................12
1.9.2 Special accessories:.............................................................................12
1.9.3 Racks and cable drums........................................................................12
2Operation and indication panel of the SPG 12/16........... 13
2.1 Connection panel .................................................................................15
3Safety ................................................................................. 16
3.1 Detachable-key switch..........................................................................16
3.2 Safety terms as per VDE 0104 (EN 50191)..........................................16
3.2.1 Mains connection .................................................................................16
3.2.2 Ready for operation..............................................................................16
3.2.3 Ready for switching on .........................................................................17
3.3 VDE regulations 0104 (EN 50191) .......................................................17
3.3.1 Non-steady test equipment ..................................................................17
3.3.2 Danger zone.........................................................................................17
3.3.3 Emergency-Off switch ..........................................................................17
4Putting into operation....................................................... 18