
1From a client on the same network as the newly configured node,
access the NetApp Element software UI by entering the node’s IP address.
2Enter the required information in the Create a New Cluster window.
See the NetApp Element Software Setup Guide for instructions. You can access the latest version
of the Setup Guide from the NetApp SolidFire Resources page.
Cable the node |Stage 3
Configure the node |Stage 4
Create a new cluster |Stage 5
1Install the rails.
2Install the chassis.
See Rail Kit Installation instructions.
LIFTING HAZARD
CAUTION
40.5 lb (18.4 kg)
Connect the node to a 1GbE network using two RJ45 connectors.
Connect the node to a 10/25GbE network using two SFP28 or SFP+ cables.
Connect the node to a 1GbE network using an RJ45 connector in the IPMI port.
Connect both power cables to the node.
Plug the power cables to a suitable power outlet.
Press the power button at the front of the chassis.
Note: It takes approximately five minutes and 30 seconds for the node to boot.
10/25GbE cables
1GbE cables
1GbE cable
Power cables
1Attach a keyboard and monitor to the node.
Note: Ensure that the node is powered on.
2In the terminal user interface (TUI) that is displayed,
configure the network and cluster settings
for the node by using the on-screen navigation.
Note: You must get the IP address of the node from the TUI. You need this in Stage 5.
After you save the settings, the node is in a pending state, and can be added to a cluster.
See the NetApp Element Software Setup Guide for configuration instructions. You can
access the latest version of the Setup Guide from the NetApp SolidFire Resources page.
3Configure out-of-band management using the Baseboard Management Controller (BMC).
i. Use a web browser and navigate to the following IP address: 192.168.0.120
ii Log in using the following default credentials: User name: root Password: calvin
iii From the server management screen, select BMC Network Configuration to configure the network parameters for the out-of-band management port.
See How to access BMC and change IP address on H610S.
FRONT
VIEW
REAR
VIEW
10/25GbE SFP+
or SFP28 cables
for iSCSI
1GbE RJ45 cable
for out-of-band
management
1GbE RJ45 cables
for management
Note:
• Ensure that you have installed the rack according to the safety instructions from the manufacturer.
• Ensure that the rack is stabilized. The heaviest equipment should be at the bottom of the rack.
• Follow proper grounding practices to avoid risk of electric shock.
• Follow proper airflow and cooling requirements to prevent hardware from overheating.
• A new chassis loaded with drives weighs 40.5 lb. Ensure that you have sucient manpower
to lift the chassis.
Install hardware |Stage 2