Flint Layout Duck Blind Instructions
1. Parts List
1 –Layout Blind
2 –Door Panels
2 –Deck Rings
2 –Self Tapping Screws
2 –Washers
2. Install Layout Blind
a. Install provided deck rings using self-tapping screws and washers as is shown in
the picture below.
b. Install blind over bow and stern of the Flint.
c. Connect hooks at the ends of the battens to the Deck Rings on the Flint inside
gunwale. There are a total of 4 hooks.