Peak MC-600H Manual

Motorcycle lift
MC-600H

CONTENTS
I. Product Features and Specifications…………………..................…….2
II. Installation requirement...…………………………..................……..…3
III. Steps of Installation...………………………….................…………..…4
IV. Exploded View………………………………………….....................….…..9
V. Test Run…….……………………………………..…….…..........................12
VI. Operation Instruction.…………………………................…..…….…...13
VII. Maintenance……………………………………..................….……….....14
VIII. Trouble shooting.……………………………….…................……….…15
IX. MC-600H parts list……..…………….………...................................….16

1
I .PRODUCT FEATURES AND SPECIFICATIONS
Motorcycle lift MC-600H:
● Hydraulic direct-drive cylinders, designed and made on ANSI standard,
utilizing oil seal in cylinder
●Self-lubricating UHMW Polyethylene sliders and bronze bush
●Non-skid diamond platforms
●Automatic safety release system
●Optional: Width extension kit and platform extension kit
MODEL MC-600H SPECIFICATION
Model
Capacity
Lifting
Height
Lifting
Time
Overall
Length
Overall
Width
Minimum
Height
Gross
weight
Motor
MC-600H
600KG
1090mm
23s
2745mm
750mm
155mm
290kg
1.5HP
Fig.1

2
II . INSTALLATION REQUIREMENT
A. TOOLS REQUIRED
Rotary Hammer Drill (Φ19) Ratchet Spanner with Socket:(28#)
Screw
English Spanner (12")
Wrench Set:(13#、15#、17#、19#)
Fig.2
F
Pliers
Grease gun
Hook Spanner(40~42mm)

3
B. SPECIFICATIONS OF CONCRETE
Specifications of concrete must be adhere to the specifications as
following. Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 100mm minimum and without reinforcing steel bars,
and must be dried completely before lift installation.
2. Concrete must be of test strength 210kg/cm2minimum.
C. POWER SUPPLY
The power capacity must be more than 2.2kw, The source cable size must be
2.5mm² and in good condition of contacting with floor.
III.STEPS OF INSTALLATION
A. Check the parts before assembly to make sure all the parts are completed.
1. Packaged cargo( lift, drive-in ramp, Parts box, control cabinet). Move the parts
aside, open the outer packing and check the parts according to the shipment parts
list. see Fig.3
Fig.3
57

4
2. Open the parts box, check the parts according to the parts list (See Fig. 4).
3. Open the parts bag, check the parts according to the parts list (See Fig. 5).
B. Put the lift and control cabinet in good order and connect the oil hose, see
Fig.6
Fig.4
Fig.5
Fig.6
53
53-12
51
51-1
51-2
53-12

5
C. Install Electrical System
1. Connect the wire according to below diagram. ( Fig.7 )
2.2 Schematic circuit diagram(Fig.8)
D. Fastening all the oil hose fittings, fill the power unit with right amount
hydraulic oil ( in order to ensure the working life of hydraulic system and the
machine reach the best performance, please fill in the no.46 high quality
anti-wear hydraulic oil. )
E. Install adjustable fixing device. See Fig 9
Power
wire
Motor wire
Fig.7
Ground
wire
Fig.8
3PH
Switch button
SB(UP)

6
1 After connecting the wire, lift the motorcycle lift to a suitable height, install the
adjustable fixing device according to below photo;
2 The adjustable fixing device can be chosen to install in different installed position
of the platform.
F. Install width extension kit(optional).See Fig 10
Fig.9
52
55

7
G. Install platform extension kit(optional).See Fig 11
Note: Connect the holes on platform extension kit and the platform. Install the
adjustable fixing device on the platform extension kit.
IV. EXPLODED VIEW
58
59
60
61
62
Fig.10
Fig.11
67
63
64
65
66

8
MODEL:MC-600H
Fig.12

9
Control Cabinet
Cylinder
Fig.14
油
Fig.13

10
Power unit
Illustration of hydraulic valve for PEAK electric power unit(220V/60Hz/1 phase)
Handle of
Release valve
Release valve
Throttle
valve
Oil Outlet
Oil return port
Protective ring
Fig.17
PEAK ELECTRIC POWER UNIT
220V/60Hz/1 phase
Fig.15
PEAK ELECTRIC POWER UNIT
110V/60Hz/1 phase
Fig.16
Check valve
Release
valve

11
V. TEST RUN
1. Install anchor bolts. see Fig.18
Install the anchor bolts to fix the machine after installing.
2. Adjust safety cable
Raise the lift to the highest position(See Fig.19), rotating the safety lock handle as
the direction of arrow. Loosen the screw of the safety cable by spanner, lift up the
safety lock plate from the rack about 15-20mm (See Fig.20), then tighten the
safety cable by spanner
`
Steps:
Note: Twisting force is 150N.m for fixing the anchor screw , knock the
anchor bolt into the ground at least 90mm.
Fig.19
Fig.20
Safety
handle
15~20mm
90mm
Drilling
Bolting
Tighten
Tighten screw
54
Fig.18

12
VI. OPERATION INSTRUCTIONS
1. Install well the oil hose between cylinder and power unit, connect well the
wire, the motorcycle lift can be used.
2. Raise up the lift without vehicle for testing.
3. To lift vehicle
Lower the lift to the lowest position, loosen the adjustable fixing device. Move the
motorcycle to the platform, put the wheel in the adjustable fixing device, set well the
motorcycle. Put up the foot stool of vehicle. Clamp the tire by the rotated handle.
Tighten the Tension bandage. Make sure the wheel is tightened and the Tension
bandage is fixed before using. See Fig.21.
4. To lower the lift: Raise the lift for several seconds. Rotate the safety lock handle
downward (see Fig.19) to release the safety device.. After the safety device is
released(see Fig.23), press the release handle in the power unit, the lift would be
lowered.
Safety device is released
Fig.23
Safety device is locked
Fig.22
56
Fig.21
(Put up the foot stool
Of vehicle

13
VII. MAINTENANCE SCHEDULE
Monthly maintenance:
1. Lubricate all moving parts with lubricant. Fig.24
2. Check all connectors, bolts and pins to insure proper mounting.
3. Make a visual inspection of all hydraulic hoses/lines for possible wear or leakage
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check all fasteners and re-torque
Fig.24

14
VIII.TROUBLE SHOOTING
NO
TROUBLE
CAUSE
REMEDY
1
Motor does not run
1. Button does not work
1. Replace button
2. Wiring connections are not
in good condition
2. Repair all wiring connections
3. Motor burned out
3. Repair or replace motor
4. AC contactor burned out
4. Replace AC Contactor
2
Motor runs but the lift
is not raised
1. Motor runs in reverse
rotation
1.Reverse two power wire
2. Release Valve in damage
2. Repair or replace
3. Gear Pump out of operation
3. Repair or replace
4. Relief Valve or Check Valve
in damage
4. Repair or replace
5. Low oil level
5. Fill tank
6. Overload lifting or low
pressure
6.Check load or adjust the pressure
3
Lift does not stay
up
1. Release Valve out of work
Repair or replace
2. Relief Valve or Check Valve
leakage
Repair or replace
3. Cylinder or Fittings leaks
Replace fitting and oil seal
4
Lift rises slowly
1. Oil line is jammed
1. Clean the oil line
2.Motor running on low
voltage
2. Check Electrical System
3. Oil mixed with air
3. Fill tank
4. Gear Pump leaks
4. Repair or replace
5. Overload lifting
5. Check load
5
Lift cannot lower
1. Safety device are not in
activated
1. Release the safety device
2. Release Valve in damage
2. Repair or replace
3. Oil system is jammed
3. Clean the oil system

15
IX. PARTS LIST
Item
Part#
Description
QTY.
Note
1
720020
Platform
1
2
720021
Cover plate of Platform
1
3
217069
Hex bolt
2
4
720022
Drive-in ramp
1
5
720023
Outer scissor assy.
1
6
720024
Inner scissor assy.
1
7
610023
Sliding block
4
8
720109
Pin for safety device
1
9
206019
Snap ring
1
10
720061
Socket bolts
1
11
720026
Safety device assy.
1
12
720027
Base assy.
1
13
620022
Self locking nut
2
14
203004A
Bronze bush
8
15
720007
Pin for Scissor
2
16
720003
Spring
4
17
720012
Pin for Spring
4
18
209025
Pin
6
19
640006A
Cylinder Base Pinφ25
1
20
640007
Cylinder
1
21
640057
Pin For Cylinder Connecting
1
22
206032
Snap ring
12
23
720009
Connecting pin
4
24
620136
Pin roll
1
25
720111
Connecting pin for safety lock
1
26
720110
Connector bush
1
27
420018
Self locking nut
1
28
720102
Socket bolt
1
29
209021
Hex nut
6
30
720043
Rubber pad
2
31
209022
Washer
6
32
209039
Washer
6
33
720002
Socket bolt
6
34
720028
Fixed frame
1
35
720044
Rubber pad
2

16
Item
Part#
Description
QTY.
Note
36
209019
Socket bolt
24
37
720048
Tire stop tube assy.
1
38
720045
Washer
1
39
209033
Washer
6
40
209034
Lock washer
7
41
420043
Socket bolt
6
42
720017
Adjusted shaft
1
43
720016
Connecting plate for handle
1
44
206023
Self locking nut
1
45
720015
Fixed Bolt for operating handle
1
46
720018
Operating handle
1
47
206006
Washer
1
48
720032
Adjustable fixing device
1
49
720031
Active tube assy.
1
50
720030
Adjustable frame
1
51
420244
Transition Fitting
1
51-1
420245
Exchange Fitting
1
51-2
420119
Straight fitting
1
52
206156
tool tray
1
53
720079A
Control cabinet ( electric )
1
54
620071
Anchor bolt
4
55
720100
tool tray frame
1
56
720014
Tension bandage
1
57
720501
Parts box
1
58
640050
Socket bolt
2
200
720055
Manual power unit
1
Optional: Width extension kits
58
720124
Connecting pin
2
59
720035
Width extension platform
2
60
209012
Hair pin
4
61
217069
Hex bolt
4
62
720034
Width extension drive-in ramp
2
Optional: Extension kits
63
209126
Hex bolt
4
64
209039
Lock Washer
4
65
209022
Washer
4
66
209021
Hex nut
4
67
720062
Extension platform
1

17
Parts for cylinder
Item
Part#
Description
QTY.
Note
20-1
640030A
Bore Weldment
1
20-2
640031A
Piston Rod
1
20-3
201034
Bleeding Plug
1
20-4
201033
Head Cup
1
20-5
209078
Dust Ring
1
20-6
201032
0-Ring
1
20-7
201035
0-Ring
1
20-8
201028
piston
1
20-9
206069
0-Ring
1
20-10
201031
0-Ring
1
20-11
201030
Y-Ring
1
20-12
201029
Support Ring
1
20-13
206071
Nut
1
20-14
620064
Oil nozzle
2
Parts for Control cabinet
Item
Part#
Description
QTY.
Note
53-1
720052
Control panel
1
53-2
61K077
Light(white)
1
53-3
420071
Button (UP)
2
53-4
209145A
Cup head bolt
4
53-5
720053
Cabinet body
1
53-6
209005
Self locking nut
4
53-7
209004
Rubber ring
4
53-8
209003
Hex bolt
4
53-9
720054
Cabinet seal plate
1
53-10
720038
Cup head bolt
6
53-11
209060
90°Fitting For Hydraulice Power Unit
1
53-12
440042
Oil hose 1/4*2550mm
1
53-13
640023
Roller
2
53-14
61K104
Split Pin
2
53-15
420075A
Terminal
1
53-16
420074
Power switch
1

18
Parts for PEAK electric power unit, 220V/60Hz/1 phase
Item
Part#
Description
QTY.
Note
200-1
81400242
Motor
1
200-2
81400219
Protective ring
1
200-3
81400220
Run capacitor
1
200-4
81400221
Motor connecting shaft
1
200-5
81400243
Valve body
1
200-6
81400223
Relief valve
1
200-7
81400231
Tighten nut of Throttle valve
1
200-8
81400232
Throttle valve
1
200-9
209149
Washer
4
200-10
81400148
Socket bolt
4
200-11
81400224
Inlet pipe
1
200-12
81400225
O-Ring
1
200-13
81400226
Filter
1
200-14
81400145
Socket bolt
4
200-15
81400227
Reservoir
1
200-16
81400228
Motor terminal box
4
200-17
81400229
Start capacitor
1
200-18
680005
Cup head bolt
1
200-19
81400230
Cover of Motor terminal box
1
200-20
81400236
Check Valve
1
200-21
81400244
Release valve
1
200-22
720059
Handle for release valve
1
200-23
81400245
Washer
1
200-24
81400246
Tighten nut
1
200-25
81400237
Gear Pump
1
200-26
81400238
Oil Return Pipe
1
200-27
81400239
Filter cap
1
Table of contents
Other Peak Lifting System manuals
Popular Lifting System manuals by other brands

Manitou
Manitou MI-X 50L D C ST3A S2 Operator's manual

Ravaglioli
Ravaglioli KPS234HEPO manual

Nussbaum
Nussbaum 2.60 HL SST Operating Instruction and Documentation

Nostolift
Nostolift XS240 operation & maintenance

GYS
GYS Spot Lift Assembly instructions

AMGO Hydraulics
AMGO Hydraulics 407-P Installation and service manual