
1
X3-Matebox advanced
Quick Installation Guide
1. Introduction
2. Overview
B
A
Load
Object Name
D
C
Grid(INV)
Grid
F
E BAT
EPS(INV)/(Off-grid)
G
BAT(INV)
Description
Load connection port
Grid output portof the inverter
Battery connection port(tobatterypack)
Battery connection port of the inverter
Gridconnection port (to local grid)
EPS output portof the inverter
Meter Meter
2) Electrical schematic diagram
1) Dimension and terminals of X3-Matebox advanced.
- Packing Lists
3. Preparation
4. Mounting
Step 1: Bracket installation
Fasten the brackets to the wall, according to the following steps.
d)
Step 2: Screw the brackets on the wall
Step 3. Match the X3-Matebox advanced with the brackets
b)
Expansion
bolts
Rubber hammer
Torque :2.5±0.2N·m
a)
Φ10 drill
80.00 mm
Screw
Inner
hexagonal
wrench
c)
Inverter bracket
Monkey Wrench
Torque: 1.5±0.2N·mMonkey Wrench
Torque: 1.5±0.2 N·m
>300mm
- Tools
Screwdriver
torque:1.5±0.2Nm·
Bracket A *1
Bracket B *1
6 mm² terminals *2
Flange nuts *3
(Expansion bolt ,
Gasket ,Self-tapping
bolt) *2
2
Matebox
Load
Grid N-wire connector*1,
N-terminal adjacent
bridge *1
(for AU market) Documents
X3-Matebox
N
BAT
Battery
N-BAR for loads
N-BAR for EPS(Off-grid) loads
EPS(Off-grid) loads Loads
Inverter
PV 1
PV 2
E-BAR
Grid
Grid EPS(Off-grid)
Main Breaker/RCD
Breaker
Breaker
CT
CT-R
CT-S
CT-T
Distribution Box
N
BAT
Battery
N-BAR for loads
N-BAR for EPS(Off-grid) loads
EPS(Off-grid) loads Loads
Inverter
PV 1
PV 2
E-BAR
Grid
Grid EPS(Off-grid)
Main Breaker
Breaker
Breaker
CT
CT-R
X3-Matebox
E-BAR
N
CT-S
CT-T
RCD
551 mm
512 mm
204.5 mm ABC D E
FG
meter
Off-grid Loads
Grid
Grid
Inverter Battery Inverter
BAT
L3
R
L1
A 1
A 2
N
C
S
T
N
L2
N
R
L1
N
C
A1
A 2
ST
N
L2L3
N
N-BAR
E-BAR
Inverter
RS485
METER
M5 inner hexagon
bolts *1 Wi Dongle * 1
6 mm² European
terminals *2
Keys* 4
16 mm² Ground
terminal *1
Earth connectors (450
mm *1, 250 mm*1)
(1) Fix the inverter bracket
on the bracket B;
Use a level rstly to ensure that the brackets in the system are rmly installed and level. Then follow the
steps below to hang X3-Matebox advanced.
Mount X3-Matebox advanced on brackets and tighten the screws.
d) The Matebox should be prioritized over the
installation of the inverter. Before installing the
inverter, you need connect the ground wire and
the Dongle communication accessories)
c ) The bracket is aligned with the screw uses
the inner hexagonal wrench to screw the
tapping screw until the expansion bolt
"bang" is heard.
b) Insert expansion bolt into the hole, use rubber
hammer to knock the expansion screw bolt into
the wall.
a) Use the bracket as a template to mark the
two holes on the wall with a marker pen. Drill
holes at marked spots with depth of 80 mm.
Note :When installing the bracket, be sure to use a spirit level to test and keep the bracket parallel to
the horizontal plane.
Bracket A should be installed at a distance of 300mm (at least) from the ground.
(2)Then set the bracket B on
the bracket A and x it with
screws;
Diagram B: N line and PE line together, D series
inverters; (Applicable to Australia)
Diagram A: N line and PE line separate wiring, D
series inverters; (For most countries)
There are 2 wiring diagrams for your system connection reference,
please follow your local policy to chose which one is suitable for
your side.
X3-Matebox advanced is a critical part for energy storage system,
which integrates the DC breaker/AC breaker/switch unit/Meter
and so on, it can easily be installed compare to the traditional
separate system, this unit can be used with Hybrid and Fit series
inverters.
Open the upper cover and the isolation plate of X3-Matebox
advanced before wiring.
X3-Matebox
advanced *1
16 mm² terminals
*10
16 mm² OT terminal
*1