
Vitocom 100, LAN 1 Installation and Service
5774 551 - 04
4
Preparing for Installation
Safety and Liability
Liability
Viessmann accepts no liability for loss of profit,
unattained savings, or other direct or indirect
consequential losses resulting from the use of the
Vitocom or the software, nor for losses resulting from
inappropriate use.
The Viessmann General Terms and Conditions apply;
these are listed in the relevant current Viessmann price
list.
Viessmann accepts no liability for SMS and e-mail
services provided by network operators.
The terms and conditions of the relevant network
operators therefore apply.
Heating system
HThe Vitocom 100, type LAN1 can be used with
Vitotronic control unit, with or without heating circuits
downstream.
HThe max. number of devices (LON subscribers)
comprising of cascade control boiler(s) and heating
circuit control units is 30.
Supported heat sources
For an up to date list of supported heat sources, see
Online help Vitodata 100 (www.vitodata100.viessmann.
com).
Operational reliability
Note: The Vitocom 100 establishes communication via
the internet between the connected Vitotronic
control unit and the user interfaces, e.g. Vitodata
100 or Vitotrol app.
Technical details on the control functions and the
messages transferred should be taken from the
installation and service instructions for the
Vitotronic control unit or the heat source.
The respective range of functions will
only be available if the following conditions
are met:
HThe Vitotronic control units and the Vitocom 100 must
be connected and configured correctly.
HThe Vitocom 100 is connected to the internet via
a DSL router.
HInternet access must be available at all times.
HUser registration has been carried out (see page 16).
HIn order to send messages via the Vitodata 100, the
recipients must be set up correctly on the Vitodata
server.
HTo ensure that messages can still be transferred during
mains failure, we recommend connecting the Vitocom
100 and DSL router to the power supply via a UPS.
Note: - The heating system and the functionality of the
message paths must be checked at regular
intervals.
- For further improvement of the operational
reliability of the heating system, we recommend
implementing supplementary measures,
e.g. frost protection or monitoring for water damage.