1.
Once attached to all line posts, pull the Flex
Rail taut, removing as much slack as you
can. Mark where the rail lines up against
the pre-drilled pilot hole on the strainer post.
2.
Leave an additional 10cm after the marked
point, then cut the ex rail and fold over.
Prepare the rail for straining, using the same
steps shown on page 4 Attaching Flex
Rail to strainer posts.
3.
Using M12 coach bolts and washers, attach
to the strainer post using a ratchet spanner.
Repeat steps above until all end brackets
and Flex Rail are joined and attached to the
strainer post.
NOTE: For steel strainer posts, we
recommend using M12 Rivnuts + M12 bolts.
4.
Install the Flex Rail tension spool by placing
the spool on the fence line by sliding the
removable hub piece into place.
Once tensioned using 2 ratchets place
locking pins into pre-drilled holes, opposite
each other, to stop the tension spool from
unwinding.
Note: pins are the same colour as your
tension spool (black or white). The diagram
had been highlighted to show where the
pins are installed.
Marking pen Tape measure
1/2 inch
square drive
ratchet x 2
Cutters
TOOLS REQUIRED:
FINISHING AND STRAINING THE FLEX RAILTM
M12 coach Bolts
100mm long
M12 washers to
suit coach bolts
M12 rivnuts M12 bolt &
washer
Timber posts:
Steel posts: