
Rev 10.3/10-16 1 MTCL8FS10TDC: #35079
TABLE OF CONTENTS
SPECIFICATIONS............................................................................................................ 3
WARNINGS ..................................................................................................................... 4
OPERATING FEATURES................................................................................................... 5
ASSEMBLY....................................................................................................................... 7
TO SET UP THE LIFTER ................................................................................................................7
TO CHANGE THE PAD FRAME CONFIGURATION................................................................................8
To Install/Remove Pad Frame Extensions....................................................................................................10
To Install/Remove, Rotate and Position Pad Mounts.....................................................................................10
To Connect/Disconnect Vacuum Hoses........................................................................................................10
INTENDED USE .............................................................................................................11
LOAD CHARACTERISTICS...........................................................................................................11
OPERATING ENVIRONMENT .......................................................................................................12
DISPOSAL OF THE LIFTER ..........................................................................................................12
TYPICAL APPLICATIONS............................................................................................................13
OPERATION ..................................................................................................................11
BEFORE USING THE LIFTER........................................................................................................14
Taking Safety Precautions ..........................................................................................................................14
Performing Inspections and Tests...............................................................................................................14
Confirming the Pad Frame Configuration.....................................................................................................15
Preparing to Use the Optional Remote Control System.................................................................................15
TO APPLY THE PADS TO A LOAD..................................................................................................15
Powering up the Lifter................................................................................................................................15
Positioning the Lifter on the Load ...............................................................................................................16
Sealing the Pads against the Load...............................................................................................................17
Reading the Vacuum Gauges......................................................................................................................17
Vacuum Level on Optimal Surfaces .............................................................................................................18
Vacuum Level on Other Surfaces ................................................................................................................18
TO LIFT AND MOVE THE LOAD ....................................................................................................19
Positioning the Lift Bar...............................................................................................................................19
Interpreting the Warning Buzzer and Lift Light ............................................................................................19
Monitoring Vacuum Indicators ....................................................................................................................19
Controlling the Lifter and Load....................................................................................................................20
In Case of Power Failure ............................................................................................................................20
TO TILT THE LOAD ...................................................................................................................20
Tilting Loads When Lifter is Positioned
Above Center
...................................................................................21
Tilting Loads When Lifter is Positioned
On Center
........................................................................................21
Operating the Tilt Latches ..........................................................................................................................21
TO RELEASE THE PADS FROM THE LOAD .......................................................................................22
AFTER USING THE LIFTER..........................................................................................................23
Storing the Lifter........................................................................................................................................23