
quickstart guide
CE-600
www.crestron.com
888.273.7876 201.767.3400
Specifications subject to
change without notice.
CE-600
QUICKSTART DOC. 8312A (2051278) 04.18
Workplace Technology Solution – Open Presentation Space
Connect the CBL-USB-A-BMICRO-6 cable to the COMPUTER port and to the USB port on the AM-200.
ZUMMESH-AVBRIDGE
3Apply Power
When all connections are made, apply power to all of the devices in the system.
The product warranty can be found at www.crestron.com/legal/sales-terms-conditions-warranties.
The specific patents that cover Crestron products are listed at www.crestron.com/legal/patents.
Certain Crestron products contain open source software. For specific information, please visit www.crestron.com/legal/open-source-software.
Crestron, the Crestron logo, AirMedia, and Zūm are either trademarks or registered trademarks of Crestron Electronics, Inc. in the United States and/or other countries.
HDMI is either a trademark or registered trademark of HDMI Licensing LLC in the United States and/or other countries. Other trademarks, registered trademarks, and
trade names may be used in this document to refer to either the entities claiming the marks and names or their products. Crestron disclaims any proprietary interest in the
marks and names of others. Crestron is not responsible for errors in typography or photography.
This document was written by the Technical Publications department at Crestron.
©2018 Crestron Electronics, Inc.
1
4Add the Occupancy Sensor to the System
Perform the following procedure to join the ZUMMESH-PIR-OCCUPANCY-BATT to the ZUMMESH-AVBRIDGE.
NOTE: The following procedure assumes the ZUMMESH-PIR-OCCUPANCY-BATT has already been installed
as described in the ZUMMESH-PIR-OCCUPANCY-BATT Installation Guide (Doc. 7867).
1. On the ZUMMESH-AVBRIDGE, press the SETUP button 5 times, then press and hold the SETUP button
until the LED on the device lights (about 10 seconds). After approximately 3 seconds, the device LED
begins slowly flashing, indicating that is in Joining mode.
NOTE: Only one ZUMMESH-AVBRIDGE should be in Joining mode at a time.
NOTE: Joining mode ends automatically after 4 minutes.
2. Remove the cover from the ZUMMESH-PIR-OCCUPANCY-BATT.
3. On the ZUMMESH-PIR-OCCUPANCY-BATT, press the TEST button 3 times, then press and hold the TEST
button until the LED on the device lights (up to 10 seconds). The device is joined to the
ZUMMESH-AVBRIDGE.
4. On the ZUMMESH-AVBRIDGE, press the SETUP button to exit Joining mode.
5More Information
For more information, refer to the documents below. All documents can be found at www.crestron.com/manuals.
• AM-200 DO Guide (Doc. 8260)
• AM-200/AM-300 Product Manual (Doc. 8254)
• IRP2 Installation Guide (Doc. 8186)
• ZUMMESH-AVBRIDGE Installation Guide: (Doc. 7916)
• ZUMMESH-PIR-OCCUPANCY-BATT Installation Guide (Doc. 7867)
2