
LTP-16N(T). Quick Configuration Manual
1.
2.
3.
•
•
•
4.
5.
1.
2.
3.
4.
5.
6.
•
•
•
2 Safety rules and Installation procedure
2.1 Safety requirements
General requirements
Any operation with the equipment should comply with the Rules for the technical operation of consumer
electrical installations.
Before operating the device, all engineers should undergo special training.
The terminal should be connected only to properly functioning supplementary equipment.
The device could be permanently used provided the following requirements are met:
ambient temperature from -5 to +40 °C;
relative humidity up to 80% at +25°C;
atmosphere pressure from 6.0×10*4 to 10.7×10*4 Pa (from 450 to 800 mmHg).
The terminal should be not be exposed to mechanical shock, vibration, smoke, dust, water, and
chemicals.
To avoid components overheating which may result in device malfunction, do not block air vents or
place objects on the equipment.
Electrical safety requirements
Prior to connecting the device to a power source, ensure that the equipment case is grounded with an
earth bonding point. The earthing wire should be securely connected to the earth bonding point. The
resistance between the earth bonding point and earthing busbar should be less than 0.1 Ω.
PC and measurement instruments should be grounded prior to connection to the terminal. The potential
difference between the equipment case and the cases of the instruments should be less than 1V.
Prior to turning the device on, ensure that all cables are undamaged and securely connected.
Make sure the device is off, when installing or removing the case.
Replacement of power modules is carried outwithout turning off the power.
SFP transceivers installation and removalcan be performed both with the power off and with the power
on.
2.2 Terminal installation
Check the device for visible mechanical damage before installing and turning it on. In case of any damage,
stop the installation, fill in a corresponding document and contact your supplier. If the terminal was exposed to
low temperatures for a long time before installation, leave it for 2 hours at ambient temperature prior to
operation. If the device was exposed to high humidity for a long time, leave it for at least 12 hours in normal
conditions prior to turning it on.
Support brackets mounting
The delivery package includes support brackets for rack installation and mounting screws to fix the terminal
case on the brackets. To install the support brackets:
Step 1.Align six mounting holes in the support bracket with the corresponding holes in the side panel of
the device.
Step 2.Use a screwdriver to screw the support bracket to the case.
Step 3.Repeat steps 1 and 2 for the second support bracket.
Operations with the terminal should be carried out only by personnel authorized in accordance with the
safety requirements.