manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Forest garden
  6. •
  7. Garden House
  8. •
  9. Forest garden OPA68DD User manual

Forest garden OPA68DD User manual

Fixing Pack (OPA68DDFP)
This fixing pack is used for several products.
There may be additional fixings.
Not to Scale
Important :
Assembly of this
shed requires a
minimum of two
adults. MUST PRE DRILL-
Issue 0118
FELT
B
OPA6PE
PLAIN END
OPA8WS
WINDOW PANEL
OPA8PS
PLAIN PANEL
236510708
ROOF BOARD
QTY 2 FELT78BL QTY 1
C D E G I
F
37282275PT
2275mm BATTEN QTY 4
FIN20010512PT
FINIAL
QTY 1
A
OPA68DD PARTS LIST
13
BRDFL46
FLOOR QTY 2
DDRPT
DOOR QTY 2
OPA6DDE
DOOR END
37282365PT
2365mm BATTEN QTY 2
44161570PT
1570mm CORNER STRIP QTY 4
HKL
N
H
J
Top View
2
D
C
Z’ bracket Qty 8
30mm Screw Qty 24
50mm Screw Qty 26
25mm Screw Qty 39
10mm Felt tacks Qty 100
Ridge Plate
30mm Nail Qty 86
45120675PPT
675mm STRIP QTY 1
M
RPET700
WINDOW QTY 2
The windows are packed
together tightly, separate
before assembly.
59121110PAII62PT
1110mm ANGLED BARGE BOARD QTY 4
84996
675mm PLASTIC STRIP QTY 4
P
Fix both of the floors together using 2x50mm
screws screwing through the floor bearers as
shown.
Place the panels on top of the completed floor. Make sure that all the panels are
tight and flush before fixing them to each other using 3x50mm screws.
When the panels are secured to each other, make sure they are square and fix
them to the floor using 3x50mm screws for each panel. Make sure the screws are
positioned so that they locate into the bearers underneath.
Flush Hinge
Qty 4
Hasp &
Staple
C
B
A
E
D
4
40mm Screw Qty 12
Place the hinge against the inside of the door frame and position
the large section of the hinge so that it is flush with the inside of
the framing as shown and fix with 25mm screws.
Open the hinge and fix the smaller section to the door framing.
Again make sure that the hinge is flush and that the holes are
positioned so that the 25mm screws locate correctly into the
batten.
F
IMPORTANT, RETAIN FOR FUTURE REFERENCE;
READ CAREFULLY
This is pressure to ensure longevity of allbuildings treated
timber components and to protect against rot. This may leave
a colour difference on some parts that will even out as the
moisture content stabilises This will not need additional.
treatment.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
- Please keep all plastic bags and small parts away from
children
- The roof of this building is not a load bearing structure.
- This product must be built on a solid level base.
Technical Helpline: 0333 7777 089 8.30 am and 5.00
pm Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
25mm Security Screws
Screws Qty 10
O
45281630PT
45 x 1630mm BATTEN QTY 1
A
8’ x 6’ Overlap Apex Shed
Turn Button
Qty 3
REQUIRED TOOLS :
(NOT SUPPLIED)
POZI DRIVE
SCREWDRIVER TAPE MEASURE HAMMER
SHARP KNIFE
FLAT HEAD
SCREWDRIVER
SCISSORS
Place the corner strips so that they cover
the joins between the panels. Fix each in
place using 4x30mm screws.
O
Place the 1630mm batten against the inside of the door so that it is tight against
the battens on the reverse and leaves a small gap at the top and bottom. Fix the
batten in place with 4 x 30mm Nails hammering through the door into the batten.
(make sure the batten is supported from the other side when fixing)
Fix a turn button to the top and bottom of the batten so that the door will be held
closed when fixed. Use a 30mm screw for each turn button.
5
MN
Place and fix a turn button above the
opening door. Make sure that the button is
fixed to the door end and will hold the top of
the door shut.
8
911
7
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Fix the ridge plate from inside the shed so that it bridges the two battens at the
apex together. Fix using 2 x 25mm screws
10
Biocidal Product Regulation (EU 528/2012) Article 58 Information
This article contains timber treated with Celcure AC-500, incorporating biocidal products to give protection against wood destroying insects & wood rotting fungi.
Contains: Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.
Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.
Nailing through the roof sheet (G) in to the battens. Position the battens as shown.
1.The 2365mm batten (J) should be flush on all sides.
2.Place a 2275mm batten (K) so that it is offset 45mm on either side and has a 15mm offset on
the long side.
3.Place another 2275mm batten (K) in between, again with a 45mm offset on both sides.
Fix each batten in place using 30mm nails spaced in 300mm intervals.
Lift the roof sections into place making sure that they are in line with the apex and
the front and back panels of the shed.
Fix the roof in place using 30mm nails spaced in approximately 300mm intervals
(Make sure the nails locate into the framework of the side and end panels)
Unroll the felt and cut it into three equal lengths. Place a section on each eaves so that
there is a 50mm overhang on each edge as shown. Fix this to the roof using felt nails
spaced in 150mm intervals. Cut and fold the corners securing with a single felt nail for
each.
Place the remaining section as shown making sure that the it overlaps the others. Again
secure each sheet in place using felt nails spaced in 150mm intervals.
Place the barge boards against the ends of the building so that they are flush with
the overhang of the roof and in line with the top. Fix each in place using 3x40mm
screws.
Place the finial where the barge boards join at the front of the shed. Secure in
place using 2x30mm screws.
Fix a Z’ bracket to
each end of the
2275mm battens
using a 25mm
screw for each.
B
K15mm Offset
J
G
K
45mm Offset
Maintenance.
Regularly check all fixings are secure and the roofing felt has no holes or tears.
Sand off any rough/sharp edges.
G
pencil line
I
L
Attention
Take care when
cutting and
trimming the roof
felt.
Hasp
Staple
Position the Staple on one of the doors, making sure that it is in line with the framing
behind and fix it in place using 2 x 25mm screws.
Before fixing the Hasp to the door make sure that it is in line with the framing on the
reverse of the door and closes over the Staple. Fix this in place using 3 x 25mm screws.
6
1. (s) of shed, into window opening(s),Place the window from the outside so that the
bubble faces inside the shed. Lip at bottom of window must overlap board at bottom
of window opening.
2. bottomPlace the plastic strips on the outer side and of each window so that one
side butts up against the cladding.
3. Fix the plastic strips using 2 x security screws for each strip.
4. Place the 675mm timber strip vertically between the two window sheets so that it
overlaps both sides. Fix to the framework using 2 x security screws.
Attention:
Take care when placing
the screws. These can
not be backed out.
You may need to
cut the plastic
strips to size using
a pair of scissors
H
Inside
of Shed
Outside
of Shed
Window
Lip
Cill
Board H
H
PM

Other Forest garden Garden House manuals

Forest garden TPC77 User manual

Forest garden

Forest garden TPC77 User manual

Forest garden OPASUM75M User manual

Forest garden

Forest garden OPASUM75M User manual

Forest garden Overlap Apex Shed Operator's manual

Forest garden

Forest garden Overlap Apex Shed Operator's manual

Forest garden Bloxham 7' x 5’ Summer User manual

Forest garden

Forest garden Bloxham 7' x 5’ Summer User manual

Forest garden 3' x 5' Value Shed User manual

Forest garden

Forest garden 3' x 5' Value Shed User manual

Forest garden OPA77DD User manual

Forest garden

Forest garden OPA77DD User manual

Forest garden BASEMSFP User manual

Forest garden

Forest garden BASEMSFP User manual

Forest garden OPA68ON User manual

Forest garden

Forest garden OPA68ON User manual

Forest garden OPA810DD User manual

Forest garden

Forest garden OPA810DD User manual

Forest garden Overlap Apex Shed ODA68NW User manual

Forest garden

Forest garden Overlap Apex Shed ODA68NW User manual

Forest garden WRGH User manual

Forest garden

Forest garden WRGH User manual

Forest garden OPA68 User manual

Forest garden

Forest garden OPA68 User manual

Forest garden OPP64NWM User manual

Forest garden

Forest garden OPP64NWM User manual

Forest garden Overlap Apex Shed 6 x 4 User manual

Forest garden

Forest garden Overlap Apex Shed 6 x 4 User manual

Forest garden FGHFV2FP User manual

Forest garden

Forest garden FGHFV2FP User manual

Forest garden Overlap Apex Shed 7' x 5' User manual

Forest garden

Forest garden Overlap Apex Shed 7' x 5' User manual

Forest garden TPCS88 User manual

Forest garden

Forest garden TPCS88 User manual

Forest garden ODA68 User manual

Forest garden

Forest garden ODA68 User manual

Forest garden ODPLOSFP User manual

Forest garden

Forest garden ODPLOSFP User manual

Forest garden Overlap Apex Shed 6 X 4 User manual

Forest garden

Forest garden Overlap Apex Shed 6 X 4 User manual

Forest garden 8' x 6' Overlap Apex Shed User manual

Forest garden

Forest garden 8' x 6' Overlap Apex Shed User manual

Forest garden TPC88 User manual

Forest garden

Forest garden TPC88 User manual

Forest garden Kempsford 8 x 6 Summer User manual

Forest garden

Forest garden Kempsford 8 x 6 Summer User manual

Forest garden Overlap Pent Wall Shed 6' x 3'' User manual

Forest garden

Forest garden Overlap Pent Wall Shed 6' x 3'' User manual

Popular Garden House manuals by other brands

Sojag 550-4157048 Assembly manual

Sojag

Sojag 550-4157048 Assembly manual

Luoman Lillevilla 427 Assembly and Maintenance

Luoman

Luoman Lillevilla 427 Assembly and Maintenance

OLT SunShed SSGS1216-FJ-Cedar Assembly manual

OLT

OLT SunShed SSGS1216-FJ-Cedar Assembly manual

Solid Build BRIGHTON Assembly instructions

Solid Build

Solid Build BRIGHTON Assembly instructions

Palmako LILLY 2 FRF19-3220-1FSC installation manual

Palmako

Palmako LILLY 2 FRF19-3220-1FSC installation manual

Mercia Garden Products 010VLPA0305SDNW-V1 quick start guide

Mercia Garden Products

Mercia Garden Products 010VLPA0305SDNW-V1 quick start guide

Keter Manor Pent 6x4 user manual

Keter

Keter Manor Pent 6x4 user manual

Palmako FRF34-3535 installation manual

Palmako

Palmako FRF34-3535 installation manual

Mercia Garden Products 01RAW2010DDOW-V2 General instructions

Mercia Garden Products

Mercia Garden Products 01RAW2010DDOW-V2 General instructions

OLT Muskoka Cabin 9x9 Assembly manual

OLT

OLT Muskoka Cabin 9x9 Assembly manual

Best Barns Cypress Assembly Book

Best Barns

Best Barns Cypress Assembly Book

Luoman LILLEVILLA Playhouse 51 Kuukkeli Assembly and Maintenance

Luoman

Luoman LILLEVILLA Playhouse 51 Kuukkeli Assembly and Maintenance

Lifetime 60190 Assembly instructions

Lifetime

Lifetime 60190 Assembly instructions

Luoman Lillevilla 428 Assembly and Maintenance

Luoman

Luoman Lillevilla 428 Assembly and Maintenance

Lemeks Palmako FRF28-3829 installation manual

Lemeks

Lemeks Palmako FRF28-3829 installation manual

OLT CB128-AK-METAL Assembly manual

OLT

OLT CB128-AK-METAL Assembly manual

Rowlinson Garden Products Hideaway Assembly instructions

Rowlinson Garden Products

Rowlinson Garden Products Hideaway Assembly instructions

Naterial 80132362 Assembly instructions

Naterial

Naterial 80132362 Assembly instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.