
6.2
6.21
6.2.2
6.2.3
6.2.4
6.3
Machine parameters which require optimization during commissioning and
preliminary values
Common machine parameters for both ramp characteristics
Machine parameters for “square root” characteristic (machine parameter 60 = 0)
Machine parameters for the linear characteristic (machine parameter 60 = 1)
Machine Parameters which are determined after compilation of parameters for the
ramp characteristic
Machine parameters related to the PLC
42
42
43
44
45
47
7. Commissioning 48
7.1 Check list for commissioning 48
7.1.1 Checks prior to machine switch-on 48
7.1.2 Checks after switch-on of adaptor cabinet 49
8. Optimization of TNC 150-parameters 50
8.1 Adjustment check-list 50
8.1 .I Buffer battery switch-off 51
8.1.2 Axis designation for NC-machines and “right-hand-rule” 51
8.1.3 Input/Output diagram for machine parameters - 52
8.1.3.1 Input diagram for machine parameters after erasing parameter memory 52
8.1.3.2 Input/Output diagram for non-erased parameter memory 53
8.1.4 Checking and correction of axis-traversing and courting directions 55
8.1.5 Setting software limit switch ranges 56
8.1.6 Offset adjustment 57
8.1.7 Adjustment of “square root characteristic” 58
8.1.7.1 Fine adjustment of trailing error for “square root characteristic” 58
8.1.7.2 Acceleration (linear and radial) for “square root characteristic” -59
8.1.7.3 Run-in behaviour with acceleration for “square roo’t characteristic” 60
8.1.7.4 Approach speed 1 urn before nominal position for ’ square root characteristic” 61
8.1.7.5 Position supervision for “square root characteristic” 61
8.1.8 “Linear ramp characteristic” adjustment 62
8.1.8.1 Fine adjustment of trailing error for “linear ramp characteristic” 62
. 8.1.9 Integral factor X, Y, Z, IV 63
9.
10.
10.1
10.2
10.3
10.4
List of machine parameters
Dimensions
Control unit
Visual display unit
PLC-Power board
Cable adapter
64
69
69
70
72
73
11.
11.1
11 .l .l
11.1.2
11.1.3
11.2
11.2.1
11.2.2
11.2.3
11.2.4
11.2.5
11.2.6
Connections and PLC-allocation 74
TNC 150 B/TNC 150 BR Connections 74
TNC 150 B Location of connections 74
TNC 150 BR Location of connections 74
TNC 150 B/TNC 150 BR Connections and PLC-allocation 75
TNC 150 Q/TNC 150 QR Connections 76
TNC 150 Q Location of connections on control unit 76
TNC 150 OR Location of connections on control unit 76
TNC 150 Q/TNC 150 QR Connector for analogue signals 77
TNC 150 Q/TNC 150 QR Terminals and PLC-allocation of first PLC-Power board 78
TNC 150 Q/TNC 150 OR Terminals and PLC-allocation of second PLC-Power board 79
TNC 150 Q/TNC 150 QR Terminals and PLC-allocation, PLC-Power board PL 100 B/PL 110 6
for standard PLC program 80