3
Component Recommended Model or Specifications Component
Source Quantity
SmartLogger SmartLogger2000 Can be
purchased
from Huawei 1
Fitting
bag for
fiber ring
switching
Low-speed
optical
module FTLF1323P1BTR-HW Can be
purchased
from Huawei
2
Optical
jumper PLCLC5S-ST3P302-HW, LC-LC-S2-L2,
3ECA1031LCLC002-01-F, or LP-LP-2S-P-SM-002 8
ATB CT-GZF2PJ-8, CT-GPH-A-8, or an ATB of a local
model Prepared by
the customer 1
Socket Connects to the power adapter. Prepared by
the customer 1
Smart Array Controller Scenario
2.2
This document describes the application scenario where the SmartLogger is inside the smart
array controller SmartACU2000B-D-2PID/2PLC.
The tables under figures list only the components to be configured by the customer in the
corresponding scenario.
1. Prepare the single-phase AC power cable for the smart array controller by yourself. Recommended:
a two-core outdoor armor copper cable with an operating voltage to the ground greater than or equal
to 300 V and a cross-sectional area of 5.5 mm2for each core wire
2. The cable from the molded case circuit breaker (MCCB) to the station-service power source is
prepared by the customer. Recommended: a two-core outdoor armor copper cable with an operating
voltage to the ground greater than or equal to 300 V and a cross-sectional area of 5.5 mm2for each
core wire
3. Prepare the three-phase AC power cable for the smart array controller by yourself. Recommended: a
four-core (U, V, W, and functional earthing) outdoor armor copper cable with a cross-sectional area
of 8 mm2for each core wire. When the rated AC voltage on the low-voltage side of the cubicle is less
than or equal to 500 V, the operating voltage between the three-phase AC power cable and the
ground should be greater than or equal to 600 V.
4. The cable from the busbar to the 3P3E switch is prepared by the customer. Recommended: a four-
core (U, V, W, and functional earthing) outdoor armor copper cable with a cross-sectional area of 8
mm2for each core wire. When the rated AC voltage on the low-voltage side of the cubicle is less
than or equal to 500 V, the operating voltage to the ground should be greater than or equal to 600 V.