VOCP1,init parameter in Figure 8 denotes the initial CS pin voltage level 1 for MOSFET current limit on the input
voltage measurement pulse, during pre-start-up check. It can be defined and calculated as:
(19)
Where ton,min,V,in,start,sense is the minimum on-time for the pre-start-up input voltage measurement pulse and d is
the ratio recommended to be between 1.2 and 1.3.
Take ton,min,V,in,start,sense = 1.38 µs, and d = 1.29,
Note: A typical leading-edge blanking time tCS,LEB of 480 ns applies on VOCP1(Vin), VOCP1,init and Vstart,OCP1.
The start-up phase consists of the soft-start phase and output charging phase. The soft-start phase is to
minimize the component stress during start-up, while the output charging phase is to fast-charge the output
voltage for fast VCC self-supply takeover from the primary auxiliary winding.
During the soft-start phase, the switching frequency is fixed as 20 kHz. The MOSFET current is limited in the first
soft-start step based on the CS pin maximum voltage limit of Vstart,OCP1/(nss + 1), where Vstart,OCP1 is the parameter
for the output charging phase CS pin maximum voltage limit, and nss is the parameter for the number of soft-
start steps. The soft-start phase CS pin maximum voltage limit is increased by Vstart,OCP1/(nss + 1) after each soft-
start step, and the typical duration of each soft-start step is 0.5 ms.
During the output charging phase, the output voltage is fast-charged with MOSFET switching pulses based on
either the output charging phase CS pin maximum voltage limit of Vstart,OCP1 or the maximum on-time in QRM. To
exit the start-up phase and enter the regulated mode without triggering the start-up output UVP, the ZCD pin
estimated output voltage Vout has to either reach the output charging voltage set-point of Vout,start before the
maximum allowable start-up phase duration of tstart,max is reached, or reach at least the start-up output UVP
level of VoutUV,start at the timing of tstart,max.
It is generally recommended to set the nss parameter value between 2 and 4. In this design example, nSS = 3
parameter setting is selected, as shown in Figure 8.
To ensure fast VCC self-supply takeover from the primary auxiliary winding, the Vstart,OCP1 parameter is
recommended to be configured as per VOCP1,at,V,in,low. Hence, Vstart,OCP1 = 0.52 V parameter setting is selected in this
design example.
Vout,start parameter can be defined and calculated as:
(20)
Where Va,start is the desired primary auxiliary winding demagnetization voltage when output voltage is Vout,start.
Va,start is recommended to be between 8 V and 9 V. So, taking Va,start = 8.3 V,