
7418 East Helm Drive • Scosdale, Arizona 85260 • 480.948.5555 • www.interfaceforce.com
Operator Instrucons ISTL Tension Link v1.2 12-01-2017
Page 1 of 5
1.1 Introducon
ThisinstruconmanualreferstotheInterfacemodelITLtensionlinktelemetryopons.Beforeinstallingor
operanganyInterfacetensionlink,thisandanyreferencedocumentsshouldbereadandunderstood.
IncompliancewiththeMachineryDirecve,Interfacetensionlinkloadcellswillbesuppliedwiththefollowing
documents:InstruconManualandCalibraonCercate.
1.2 Markings CE
Eachtensionlinkwillbemarkedwithanindividualserialnumber,CElabelandtheSWL(safeworkingload)of
the tension link.
1.3 ElectromagnecCompability(EMC)
The electromagnec compability of the load cell device can only be assessed in conjuncon with the enre
installaon, including its control systems. The machine builder who installs this partly completed machinery
into a machine is responsible for compliance with the EMC direcve.
1.4 InstallaonandOperaon
Toensuresafeandtrouble-freeinstallaonofthetensionlinkmeasuringdevice,thetensionlinkmustbe
properlytransportedandstored,professionallyinstalledandplacedinoperaon.
Unpacking
Beforeremovingthetensionlink,inspectthepackagingforsignsofdamageandimmediatelyinformthe
supplierifanydamageisfound.Unpackthetensionlinkcarefully,takingspecialcarewithcablesandbe
awaretothepossibilityofdamaginglow-rangedevicesbymishandling.Ensurethatcalibraonandinstrucon
informaonisnotinadvertentlydiscarded.
ChecksPriortoInstallaon
• Checkthatthetensionlinkhasbeensuitablyselectedfortheenvironmentitisbeingplacedinto.Any
adversetemperature,corrosiveorpotenallyexplosiveenvironmentsmayaecttheoperaonallifeand
thesafetyoftheproduct.
OPERATING INSTRUCTIONS
Installaon
Tensionlinkloadcellsarenormallyclassiedasportabledevices,andsothecorrectinstallaoniscricalto
ensuringproductlifecycle.Toavoiddamageorlossofaccuracyduringinstallaon,thefollowingpointsshould
befollowed.
• ThedireconoftheloadappliedtoalinkshouldbelinearasshowninFigure1.