
7
New Brunswick Scientific Co., Inc. User’s Guide
TABLE OF CONTENTS
1OVERVIEW.........................................................................................................................9
1.1 SPECIFICATIONS............................................................................................................10
1.2 CE DECLARATION OF CONFORMITY .............................................................................10
2INSPECTION & VERIFICATION .................................................................................12
2.1 INSPECTION OF BOXES ..................................................................................................12
2.2 PACKING LIST VERIFICATION .......................................................................................12
3PREPARING THE LOCATION......................................................................................13
3.1 PHYSICAL LOCATION ....................................................................................................13
3.2 ENVIRONMENT..............................................................................................................13
4UNPACKING & INSPECTION.......................................................................................14
4.1 UNPACKING OF EQUIPMENT..........................................................................................14
4.2 INSPECTION OF EQUIPMENT ..........................................................................................15
5FEATURES........................................................................................................................17
6SETTING UP .....................................................................................................................22
6.1 LEVELING .....................................................................................................................22
6.2 INSTALL SPILL TUBE.....................................................................................................23
6.3 CAROUSEL ATTACHMENT .............................................................................................23
6.4 INSERTING THE CATCH TRAY........................................................................................24
7GETTING STARTED.......................................................................................................25
7.1 VOLTAGE CONFIGURATION...........................................................................................25
7.2 MAKING ELECTRICAL CONNECTION .............................................................................25
7.3 INDEXING......................................................................................................................25
7.4 CAROUSEL LOADING FOR CONTINUOUS AND BATCH MODES .......................................26
7.5 CONTINUOUS MODE......................................................................................................26
7.6 BATCH MODE ...............................................................................................................27
7.7 AUTO / MANUAL KEY...................................................................................................29
7.8 NOZZLE ASSEMBLY & STERILIZATION .........................................................................29
7.9 LOADING TUBING INTO PUMP HEAD.............................................................................30
7.10 INSTALLING THE DUST COVER......................................................................................31
8OPERATION .....................................................................................................................33
8.1 SPEED ...........................................................................................................................33
8.2 COOL TIME ...................................................................................................................33
8.3 PRIMING THE PUMP.......................................................................................................34
8.4 CALIBRATION................................................................................................................35
8.5 ENTERING A DISPENSING VOLUME ...............................................................................36