
xi
TABLE OF CONTENTS
1OVERVIEW...................................................................................................................................................13
1.1 INNOVA 4430, FRONT VIEW.................................................................................................................14
1.2 SPECIFICATIONS ......................................................................................................................................15
2INSPECTION, VERIFICATION & UNPACKING OF EQUIPMENT...................................................17
2.1 INSPECTION OF BOXES.............................................................................................................................17
2.2 PACKING LIST VERIFICATION..................................................................................................................17
2.3 UNPACKING OF EQUIPMENT ....................................................................................................................17
3PREPARING THE LOCATION..................................................................................................................19
3.1 PHYSICAL LOCATION...............................................................................................................................19
3.2 ENVIRONMENT ........................................................................................................................................19
3.3 ELECTRICAL REQUIREMENTS ..................................................................................................................19
3.4 SPACE REQUIREMENTS............................................................................................................................19
4INSTALLING THE INNOVA 4430.............................................................................................................21
4.1 TOOLS REQUIRED FOR INSTALLATION.....................................................................................................21
4.2 LEVELING A SINGLE SHAKER ..................................................................................................................21
4.3 LEVELING THE OPTIONAL BASE ..............................................................................................................22
4.4 MOUNTING THE INNOVA 4430 ON THE OPTIONAL BASE..........................................................................22
4.5 INSTALLING THE INNOVA 4430 STACKING KIT .......................................................................................24
4.6 STACKING A SECOND INNOVA 4430 SHAKER..........................................................................................25
4.7 STACKING A THIRD INNOVA 4430...........................................................................................................26
5FEATURES....................................................................................................................................................27
5.1 KEYPAD ..................................................................................................................................................27
5.2 LED DISPLAY .........................................................................................................................................27
5.3 USER INTERFACE KEYS...........................................................................................................................28
5.4 STATUS INDICATORS ...............................................................................................................................28
5.5 FUNCTION INDICATORS ...........................................................................................................................29
6GETTING STARTED...................................................................................................................................31
6.1 PLATFORM ASSEMBLIES..........................................................................................................................31
6.2 INSTALLATION OF PLATFORM..................................................................................................................31
6.3 INSTALLATION OF CLAMPS......................................................................................................................32
6.4 ELECTRICAL CONNECTIONS ....................................................................................................................33
6.5 OPTIONAL GASSING PORT KIT ................................................................................................................35
7OPERATION .................................................................................................................................................37
7.1 STARTING THE SHAKER...........................................................................................................................37
7.2 CONTINUOUS (UNLIMITED) RUN.............................................................................................................38
7.3 CHECKING ANY SETPOINT.......................................................................................................................38
7.4 TIMED FUNCTIONS ..................................................................................................................................38
7.5 ALARM FUNCTIONS.................................................................................................................................39
7.6 TEMPERATURE SETPOINT ........................................................................................................................39
7.7 TEMPERATURE OFFSET CALIBRATION.....................................................................................................40
7.8 TOTAL RUNNING TIME ............................................................................................................................41
7.9 MAINT [MAINTENANCE] INDICATOR.......................................................................................................41
7.10 POWER FAILURE......................................................................................................................................41
8PREVENTIVE MAINTENANCE................................................................................................................43
New Brunswick Scientific Co., Inc. User’s Guide