manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Paramount Fitness
  6. •
  7. Lighting Equipment
  8. •
  9. Paramount Fitness ECO POOL 006-527-6316 Series User manual

Paramount Fitness ECO POOL 006-527-6316 Series User manual

AUTOMATIC IN-FLOOR CIRCULATION SYSTEM
INSTALLATION
8175 W. Buckeye Rd., Phoenix, AZ 85043
Toll Free: 1.800.621.5886 • Phone: 480.893.7607 • Fax: 480.753.3397
[email protected] • www.1Paramount.com
US and Foreign patents and patents pending
see www.1paramount.com/support/patent-numbers/
Paramount products are designed by Paramount in Phoenix, Arizona, United States of America
004-027-8788-00 R00 ECN_2155 PUB081521 ©2021 Hayward Industries, Inc.
2
ECOPOOL RIBBED BODY SYSTEM
Item Number: 006-527-6315-XX
Includes:
(1) Two-Port Four-Gear Valve
(3) Ribbed Bodies with Cap
(3) Nozzles
(3) Riser Pipes
(1) Nozzle Tool
ECOPOOL SMOOTH BODY SYSTEM
Item Number: 006-527-6316-XX
Includes:
(1) Two-Port Four-Gear Valve
(3) Smooth Bodies with Cap
(3) Nozzles
(3) Riser Pipes
(1) Nozzle Tool
Please indicate your color choice by placing the appropriate color code in place of the “XX"
at the end of the part number.
White-01 Gray-02 Black-03 Light Blue-06 Beige-07 Light Gray-08
3
ECOPOOL EQUIPMENT AND PLUMBING SCHEMATIC
1 2
PUMP
48D.E.
SAND 4.9
MIN.FILTER
CART. 150
HEATER
optional
RETURNS NOZZLES
CANISTER
MAIN DRAIN
SKIMMER
1 2
MIN.3'
1
1
1
2
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
1
1 1
2 2 2
2
2
R
R
R
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
MIN.3'
111
2
2
2
111
2 2 2
R
R
R
1 2
PUMP
48D.E.
SAND 4.9
MIN.FILTER
CART. 150
HEATER
optional
RETURNS NOZZLES
CANISTER
MAIN DRAIN
SKIMMER
1 2
MIN.3'
1
1
1
2
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
1
1 1
2 2 2
2
2
R
R
R
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
MIN.3'
111
2
2
2
111
2 2 2
R
R
R
1 2
PUMP
48D.E.
SAND 4.9
MIN.FILTER
CART. 150
HEATER
optional
RETURNS
NOZZLES
CANISTER
MAIN DRAIN
SKIMMER
1 2
MIN.3'
1
1
1
2
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
1
1 1
2 2 2
2
2
R
R
R
2" COMES IN
FROM FILTER
3' MINIMUM
R RR
MIN.3'
111
2
2
2
111
2 2 2
R
R
R
VALVE PLUMBING SCHEMATIC
2 PORT WATER VALVE
1. Floor #1
2. Wall #2
Note: If EcoPool includes SwingJets #2 wall
fittings must be 1½" female threaded fittings with
no inside restrictions.
VALVE PLUMBING SCHEMATIC
2 PORT WATER VALVE
Min. Pump Curve
50 GPM @ 60 TDH
Min. Filter Size
36 SQ. FT. DE = 72 GPM
3.1 SQ. FT SAND = 60 GPM
100 SQ. FT. CARTRIDGE = 75 GPM
Additional features added to pool equipment
such as in-line feeders, water falls, etc., may
change the flow requirements. Changes in flow
requirements may require a higher GPM pump
and larger filtration
CENTER DEEP END DEEP
4
WATER VALVE INSTALLATION
ST
AGGER 3" MINIMUM
12
IN
NOTICE: All pipe fittings MUST be staggered.
PARTS NEEDED FOR ASSEMBLY
OPTION ONE
• (2) 2”X15” PVC PIPE (port 1,2)
• (1) 2”X18” PVC PIPE (port inlet)
• (3) 2” SLIP 90° ELBOWS
• Set in trench 15 “ deep X 12” wide
1. Remove clamp
2. Lift off dome (save O-ring)
3. Remove pressure gauge and knob from
inside valve housing assembly
4. Pipes and valve base should be treated with
primer
5. Make sure pipes are glued all the way into
the stop. Be careful not to allow glue to run
into module area.*
6. The center port is the inlet to the valve and
should be approximately 3” longer than the
perimeter pipes.
7. Allow 24 hour before pressure testing
8. Reposition o-ring in groove in the valve base.
9. Replace dome and V-Clamp and tighten until
snug
10. Thread the pressure gauge to the top of the
dome. Do Not Use Teflon Tape.
11. Pressurize with pool plumbing (do not
exceed 35 psi)
12. Store the module assembly in a safe place
and install after the pool has been started
up.
* Pipes should be a minimum of 12” in length
and should insure that valve be at least 6”
above water level.
Gluing instructions
PLUMBING & CONCRETE DETAIL
Gunite or Shotcrete Process
CONCRETE:
1. Make a cutout or opening approximately 1"
deep and 1" bigger than the pipe.
2. This cutout will be filled with plaster and create
a water stop.
Verify the angle of the risers as it is
imperative that the riser angle be 90 degrees
from the finished floor angle. Check that
the system did not lose pressure prior to
shooting the pool and upon completion.
PLUMBING FOR FLOOR NOZZLES
NOTE: All risers must be 90 degrees
(perpendicular) to the finished floor
2"SCH. 40 PIPE,
15"LONG
2"ELBOW 2"PIPE
1"X 1"CUTOUT
AROUND THE
PIPE FOR WATER
CUT PIPE HERE
SOIL
CONCRETE
5
PRE-PLASTER DETAIL | SMOOTH BODY INSTALLATION
1. Make a cutout or opening approximately 1"
deep and 1" bigger than the pipe. This cutout
will be filled with plaster or other finish coat to
create a water stop.
2. Cut off riser pipes flush with concrete
surface.
3. Remove cap. Prime the inside of the pipe.
DO NOT PRIME THE BODY.
4. Glue the body into the pipe with a regular
PVC glue.
The glue must cover the full length of the body
barrel and 3” deep inside the riser pipe. Push
the body into the pipe until the shoulder hits the
top edge of the pipe.
Let fumes vent for 30 minutes then replace all
body caps.
5. PLASTERING THE POOL
Leave all plaster caps in place for removal at
start up.
NOTE: Optional, the plaster crew may remove
the plaster caps as they finish.
NOTE: The body does not come with the
nozzle installed.
NOTICE: You can use regular PVC glue on smooth body
SOIL
CONCRETE
6
PRE-PLASTER DETAIL | RIBBED BODY INSTALLATION
1. Make a cutout or opening approximately 1”
deep and 1” bigger than the pipe.
This cutout will be filled with plaster or other
finish coat to create a water stop.
2. Cut off riser pipes flush with concrete surface.
3. Remove cap. Prime the inside of the pipe.
DO NOT PRIME THE BODY.
DO NOT ROTATE THE BODY IN THE
PIPE.
4. Glue the body into the pipe with a HEAVY
BODY PVC SOLVENT CEMENT.
The glue must cover the full length of the body
barrel and 3” deep inside the riser pipe. Push
the body into the pipe until the shoulder hits
the top edge of the pipe.
Let fumes vent for 30 minutes then replace all
body caps.
5. PLASTERING THE POOL
Leave all plaster caps in place for removal at
start up.
NOTE: Optional, the plaster crew may remove
the plaster caps as they finish.
NOTE: The body does not come with the nozzle
installed.
NOTICE: HEAVY BODY GLUE IS REQUIRED
7
PARAMOUNT MODULE ALIGNMENT GUIDE
INSTALLING NOZZLE CAPS
TO FUNCTION PROPERLY IT IS IMPERATIVE THAT THE MODULE BE PLACED IN
CORRECT ORIENTATION TO THE BASE. TO ENSURE THIS IS DONE,
PLEASE FOLLOW THESE INSTRUCTIONS.
1. Look at the top of the Module - Figure 1
2. Locate the Multi port Tube Assembly - Figure
1A
3. Look at the Base - Figure 2
4. One open port is centered between two
plugged ports - Figure 2
5. When installed, the ports centered under the
Multi port Tube Assembly (Figure 1A) on the
Module must be centered over the open ports
in the Base - Figure 2A
Figure 1
2-Port Module
Figure 2
Base
Figure 2A
Ports
Figure 1A
Multi port Tube Assembly
If the Module is placed incorrectly, the returns and nozzles in the pool will fire at the
same time.
Small Nozzle Tool Part #004-552-5452-00
4. Turn cap clockwise until
it snaps into place.
1. Select nozzle size from pool
plan and using the nozzle
tool to twist on caps.
2. Place the nozzle inside
the nozzle tool to hold
it from spinning as you
twist on the cap.
3. Place the cap on the
nozzle. It will go on and
twist one way.
8
START-UP CLEANING NOZZLE
System Start Up
1. Before installing nozzles flush all lines by:
a. Start pump, run for 10 minutes before
installing the water valve module.
b. Install the water valve module and
let valve cycle to flush out any debris
remaining in each line.
2. Be sure o-ring is pushed all the way up to
top flange.
3. Start with nozzle closest to the valve,
make sure the red plaster caps have been
blown out before installing the nozzles.
4. Snap the nozzle onto the nozzle tool by
twisting. Figure 3
5. Install nozzle in body by turning clockwise
one-quarter turn. Figure 4
Fig. 3
Fig. 4

This manual suits for next models

1

Other Paramount Fitness Lighting Equipment manuals

Paramount Fitness MDX DEBRIS REMOVAL SYSTEM User manual

Paramount Fitness

Paramount Fitness MDX DEBRIS REMOVAL SYSTEM User manual

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness ECOSYSTEM User manual

Paramount Fitness

Paramount Fitness ECOSYSTEM User manual

Paramount Fitness MDX2 retro User manual

Paramount Fitness

Paramount Fitness MDX2 retro User manual

Paramount Fitness MDX-R3 User manual

Paramount Fitness

Paramount Fitness MDX-R3 User manual

Paramount Fitness PARASCOPE User manual

Paramount Fitness

Paramount Fitness PARASCOPE User manual

Paramount Fitness SDX 2 User manual

Paramount Fitness

Paramount Fitness SDX 2 User manual

Paramount Fitness MDX2 retro User manual

Paramount Fitness

Paramount Fitness MDX2 retro User manual

Paramount Fitness Paraskim V Programming manual

Paramount Fitness

Paramount Fitness Paraskim V Programming manual

Paramount Fitness Paraskim V Programming manual

Paramount Fitness

Paramount Fitness Paraskim V Programming manual

Paramount Fitness MDX-R3 Programming manual

Paramount Fitness

Paramount Fitness MDX-R3 Programming manual

Popular Lighting Equipment manuals by other brands

OttLite L13516 quick start guide

OttLite

OttLite L13516 quick start guide

ReneSola RTL009CB0101 instruction manual

ReneSola

ReneSola RTL009CB0101 instruction manual

Raytec SPARTAN Series installation guide

Raytec

Raytec SPARTAN Series installation guide

olympia electronics PLD-25/NiMH quick start guide

olympia electronics

olympia electronics PLD-25/NiMH quick start guide

LITESHEET BriteCor AC Direct BBS installation manual

LITESHEET

LITESHEET BriteCor AC Direct BBS installation manual

Augenti LIGHTING MERIDIAN 2 installation instructions

Augenti LIGHTING

Augenti LIGHTING MERIDIAN 2 installation instructions

Glamox C12 -P quick guide

Glamox

Glamox C12 -P quick guide

OWIM Powerfix Profi HG04368 Operation and safety notes

OWIM

OWIM Powerfix Profi HG04368 Operation and safety notes

GTD GTD-1400 II PROFILE user manual

GTD

GTD GTD-1400 II PROFILE user manual

Front Runner RRAC099 installation instructions

Front Runner

Front Runner RRAC099 installation instructions

Koncept Z-BAR AR3000-CD Assembly instructions

Koncept

Koncept Z-BAR AR3000-CD Assembly instructions

Fun & Function SK7393 installation manual

Fun & Function

Fun & Function SK7393 installation manual

Storch LED Tower 36 W Akku Translation of the original instruction

Storch

Storch LED Tower 36 W Akku Translation of the original instruction

Violet Defense Vantage I User manual & warranty

Violet Defense

Violet Defense Vantage I User manual & warranty

High End Systems DL.3 user manual

High End Systems

High End Systems DL.3 user manual

Ikan LSP-004 quick start guide

Ikan

Ikan LSP-004 quick start guide

TEi Lighting WALLWASHER1 (RGB) 85-05481 user manual

TEi Lighting

TEi Lighting WALLWASHER1 (RGB) 85-05481 user manual

Federal Signal Corporation Global Series Installation and maintenance instructions

Federal Signal Corporation

Federal Signal Corporation Global Series Installation and maintenance instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.