CTech™ FlowVPE® System Maintenance Guide
Introducon
The purpose of this document is to become familiar and comfortable with handling the various components of the
GxP Flow Cell as well as correctly following the loading and unloading procedures. The following instrucon details
these procedures, as well as the setup required for the FlowVPE hardware prior to the loading procedure.
How to Load the GxP Flow Cell and Fibree
1. Click on Load Controls in the FlowVPE sidebar. The Flow Head moves to the loading posion and opens the Load
Controls window.
Figure 1. Load Controls buon.
CTech™ FlowVPE 10 mm GxP Flow Cell Loading Procedure
DOC0093 Rev. 02 11/12/2021
WARNING
! !
These instrucons must be followed very closely, as they ensure proper loading and operaon of the
FlowVPE System. Failure to do so may result in damage to the Flow hardware.
The User is the Crical Link Between the Soware and Hardware:
The user must tell the soware when the Flow Cell is mounted and demounted. The
soware is set up to prompt accordingly, but the user must be aware of the current state
of the hardware for safe and eecve use of the FlowVPE System.