Introduction 1
Important recommendations 2
1. Characteristics of STM MR-MRE monoblocks
1.1. General description 3
1.1.1. Operation principle of vented Ni-Cd cells 3
1.1.2. Description of STM MR-MRE Ni-Cd monoblocks 4
1.2. Mechanical characteristics 5
1.3. Electrical characteristics 5
1.4. Description of the centralized filling system 6
1.4.1. General description 6
1.4.2. Working principle of a centralized filling ramp 7
2. Precautions and practices
2.1. Transport, storage 8
2.2. Water and electrolyte 8
2.2.1. Water quality 8
2.2.2. Harm caused in using sulfuric acid or
acidic water 8
2.3. Electrical shocks and burns 9
2.4. Possible dangers of hydrogen 9
3. Installation
3.1. Assembly into batteries 10
3.2. Ventilation and cooling 11
3.3. Assembly of centralized water filling system 11
3.3.1. Precautions and recommendations 11
3.3.2. General instructions for assembly 12
Contents