10 EB 2512 EN
Installation
The mounting position of the compensation
chamber is indicated by an adhesive label
on the chamber itself as well as by an arrow
and the word "top" stamped on the top of
the chamber.
Thismountingpositionmustbeadheredto;
otherwise the safe functioning of the pressure
reducing valve cannot be guaranteed.
Weld the line coming from the pressure tap-
ping point to the
3
/
8
“ pipe socket on the
chamber. Install the compensation chamber
at the highest point of the pipeline. Conse-
quently, the control line between compensa-
tion chamber and actuator must also be in-
stalled with a downward slope. In this case,
use a
3
/
8
“pipewithscrewttings.
If the control line connection is located below
themiddleofthevalveoutletange,arrange
the compensation chamber at the same level
astheoutletange(Fig.3.3).Inthiscase,
use a pipe which is at least ½“ in size for the
control line from the tapping point to the
compensation chamber.
If the control line is connected above the
middleofthevalveoutletange,installthe
compensation chamber at the same level as
the downstream pressure tapping point
(Fig.3.4).Theadditionalpressureofthe
condensate head must be compensated for
by adjusting the set point to a higher value.
Needle valve · If the regulator tends to hunt,
we recommend installing a needle valve at
thecontrollineconnection(16)inadditionto
the standard SAMSON screw joint with re-
striction.
4.4 Strainer (lter)
Install the strainer (e.g. SAMSON
Type2N/2NI)upstreamofthepressurere-
ducingvalve(seeFig.3).
−Selectastrainer(meshsize)suitablefor
the process medium.
−Thedirectionofowmustcorrespondto
the arrow on the body.
−Thelterelementmustbeinstalledto
hang downwards or sideways for appli-
cations with steam.
−Remember to leave enough space to re-
movethelterelement.
4.5 Shut-off valve
Install a hand-operated shut-off valve both
upstream of the strainer and downstream of
the regulator. This allows the plant to be shut
down for cleaning and maintenance, and
when the plant is not used for longer periods
of time.
4.6 Pressure gauges
Install a pressure gauge both upstream and
downstream of the regulator to monitor the
pressures prevailing in the plant. Install the
pressure gauge on the downstream side be-
hind the downstream pressure tapping point
(not between the tapping point and the
valve).