S&A CW-5300 Installation instructions

TY-JS-20319-003
1
CW-5300/6000/6100/6200/6260
Industrial Circulating Chiller Installation &
Operation Instructions

TY-JS-20319-003
2
FOREWORD
Thanks for your purchase of our product. Please read this
manual carefully before using and keep it properly so that you can
refer to it whenever you need information.
This manual is not a quality guarantee. Our company reserves
the right to the interpretation of the correction of misprint and
improperly described information and product improvement. The
revised content will be edited into the reprinted user manual without
prior notice.

TY-JS-20319-003
3
CONTENTS
Notice ......................................................................................................................4
I.
Overview ......................................................................................................... 7
II.
Model Illustration ........................................................................................... 7
III. Product Outlines & Parts
.................................................................................7
IV.
Installation ...................................................................................................... 9
V.
Operating States & Parameter Adjustment ................................................11
VI.
Alarm & Output Terminal ............................................................................. 13
VII.
Maintenance ................................................................................................. 14

TY-JS-20319-003
4
Notice
Please strictly adhere to the usage guidelines and requirements provided, as accidents
caused by improper operation (or use not in accordance with instructions) will be the
responsibility of the user, and our company will not be held liable.
Notice
Operation Guideline
The operation should be
carried out by professional
technicians
Handling, piping installation, electrical, operation,
maintenance, overhaul and other operations must be
completed by personnel with professional skills.
It is forbidden to be used
beyond the range of
specification
It is forbidden to use the equipment beyond the range of
manual specifications.
It is forbidden to be used in
the explosive environment
It is not permitted to install the chiller in dangerous
places with inflammable gas.
Electrical connection
a)
The power supply must conform to the standard
indicated in the nameplate or the manual;
b)
Use the standard cable, and select the standard wire
diameter;
c)
The grounding wire must be installed and the
connection must be reliable.
It is forbidden to operate the
equipment without a cover
There are live parts in the machine, it is not permitted
to run machine without outer cover.
Water-proof
Do not allow the equipment to encounter water.
Maintenance and repair
The operation must be carried out after 3 minutes of
cutting off the power supply, because the high-voltage
charging part in the equipment is not discharged within 3
minutes. Prohibit touch the live parts.
Danger
High Voltage
Contact with live parts can cause serious personal injury
or death.
Scald
Burn Risk
Stay away from high-temperature areas.

TY-JS-20319-003
5
Notice
Operation Guideline
Transport and
installation
The equipment must be firmly fixed during transport and
installation. Otherwise, there will be a danger of tipping or
falling.
Electrical protection
The power cable terminal must be equipped with the electric
leakage and overload protection device according to the rated
current indicated on the equipment nameplate.
Stop running in
abnormal state
When the equipment is abnormal, do not start the machine
at this time, until the reason for the abnormal is known and
there is no risk when starting the machine.
Do not put fingers or
other things into the gap
of the equipment
There are rotating parts inside the device. Do not put fingers
or other things into the gap of the equipment.
Refrigerant leakage
a)
When the refrigerant leaks, please make sure that the
ventilation is available.
b)
Avoid contacting with skin.
Notice
Operation Guideline
Transportation with
liquid is prohibited
The equipment is not allowed to be transported with liquid to
prevent internal pipeline leakage.
Transport
a)
The equipment should be fixed firmly before transportation
to prevent the equipment from moving due to vibration and
external forces. If there is excessive vibration and external
force, the internal equipment may be damaged.
b)
Tilt angle should be ≤45°.Otherwise, the refrigeration
system will fail.
Operating environment
a)
It is forbidden to use in special environments such as high
temperature, humidity, strong electromagnetic interference,
etc.
b)
The equipment must be installed in a place where there is
no direct sunlight and away from the fire sources.
Installation
a)
The equipment must be installed on a horizontal surface.
Otherwise, the refrigeration system will fail;
b)
It is forbidden to place objects within 1 meter around the
air inlet and 1.5 meters around the air outlet. If the air inlet
and the air outlet are blocked, the cooling ability that the
equipment should have cannot be realized.

TY-JS-20319-003
6
Before commissioning
a)
Make sure that the water supply pipe of equipment is not
blocked;
b)
It is necessary to check the water pipe and the water pump
to confirm that there is a proper amount of water entering the
water pump and exhaust it through the water pump exhaust
valve, otherwise it will cause damage to the water pump;
c)
Confirm that the state of the equipment is normal and safe.
Otherwise, there may be injury and damage.
Gently move the
motor impeller if the
equipment isn’t used
for a long time
For equipment that has not been used for a long time, it may
be difficult to start the pump at the first start. Please gently
move the motor impeller before the equipment is powered on.
The equipment is
forbidden to be
trampled on
Please do not step on or sit on the equipment. Otherwise, it
may cause injury accidents such as falling or overturning.
Clean the air filter
regularly
Clean the air filter at least once a week. If it is blocked, the
cooling ability will decrease and the power consumption will
increase, and the alarm will not work properly.
Equipment surface
cleaning
a)
Please use cleaning agents that are non-corrosive to metals
and plastics;
b)
Please keep the cleaning agent properly after cleaning to
prevent liquid leakage;
c)
The container for storing the cleaning agent must be sealed
completely.
No air blowing at the
water outlet
A temperature probe is installed inside the water outlet, and it
is forbidden to blow air inside the device with an air gun.
Wear protective gloves
during maintenance,
inspection and cleaning
a)
The sharp edges of the condenser fins may cut the skin;
b)
The temperature of the internal compressor and refrigerant
piping is very high, and direct skin contact may cause burns.
Anti-freezing
a)
When the ambient temperature is lower than 2℃and the
machine is shut down for a long time, it is necessary to drain
the liquid and blow the water away in the system with
compressed air, otherwise there is a danger of freezing and
cracking the components and pipelines.
b)
When room temperature is lower than 2℃, it is
recommended to use antifreeze with a concentration of not
more than 30% containing ethylene glycol or propylene glycol.

TY-JS-20319-003
7
I.
Overview
This product is an industrial cooling device designed and manufactured for laser cutting,
laser welding, laser marking, laser engraving and other equipment that uses laser
processing. It can provide a temperature-stable cooling medium for the above application
scenarios.
The chiller is composed of a compressor, a condenser, a throttling device (expansion valve
or capillary), an evaporator, and a water pump. Its working principle is that the chiller’s
refrigeration system cools the water, and the water pump delivers the low-temperature
cooling water to the equipment that needs to be cooled. Then the cooling water will take
away the heat, heat up and return to the chiller, and then be cooled again and transported
back to the equipment. In the refrigeration system of a chiller, the refrigerant in the
evaporator coil absorbs the heat of the return water and vaporizes into steam. The
compressor continuously extracts the generated steam from the evaporator and
compresses it. The compressed high-temperature, high-pressure steam is sent to the
condenser and later will release heat (heat extracted by the fan) and condense into a high-
pressure liquid. After being reduced by the throttling device, it enters the evaporator to be
vaporized, absorbs the heat of the water, and the whole process circulates constantly.
Users can set or observe the working status of the water temperature through the
temperature controller.
II.
Model Illustration
CW- 6000 A H
④Water pump
③Electric source type
②Chiller model series
①Chiller application
Note: This model description only contains the description of the company's main product codes,
not all of them are listed. Please confirm with our company before ordering the specific model,
our company has the final interpretation right about it.
III.
Product Outlines & Parts

TY-JS-20319-003
8
Note: The above-mentioned product outlines and part names are only for one of the models. The
outlines and parts installation may be slightly different in different models.

TY-JS-20319-003
9
IV.
Installation
1. Open the package and check whether the machine is in good condition
and whether the accessories are complete.
2. Please ensure that the working voltage of the chiller is stable and
normal.
Because the refrigeration compressor is sensitive to the power supply voltage, the normal
working voltage of our company's standard products is 210~240V (110V model is
100~120V). If wider operating voltage range is necessary, customization is available.
3. Equipment installation conditions and requirements
(1) It must be installed on a horizontal surface and not tilted.
(2)The air outlet of the chiller should be at least 1.5m away from the obstacle, and the air
inlet must be at least 1m away from the obstacle (See below diagram).
(3) Do not install in harsh environments such as corrosive, flammable gas, dust, oil mist,
conductive dust, high temperature and humidity, strong magnetic field, direct sunlight, etc.
(4) Operating Environment
Ambient Temperature
Ambient Humidity
Altitude
0~40℃
≤90%RH
≤3,000m
(5) Medium Requirements
Cooling medium allowed by the chiller includes purified water, distilled water, high-purity
water and other softened water. It is forbidden to use oily liquids, liquids containing solid
particles, corrosive liquids, etc. Clean the filter element and replace the cooling water
regularly (about three months is recommended) to ensure the normal operation of the
chiller.
When the chiller is stored with water at room temperature lower than 2℃, it is necessary
to add anti-freezer in the chiller water tank. It is recommended to use antifreeze with a
concentration of not more than 30% containing ethylene glycol or propylene glycol. After
the temperature warms up, change to purified water, distilled water or other suggested
cooling media, let the chiller run for 30 minutes to remove the residual anti-freezer and
drain it, and then refill with unused circulating water.
4. Determine the direction of the pipeline layout according to the water
inlet and outlet of the chiller, and ensure that the waterway is clean and

TY-JS-20319-003
10
free of impurities, so as to prevent impurities from entering the waterway
and causing blockage or pump failure.
5. Plug in the power cord and turn on the power switch (it is forbidden to
start without water).
(1) After turning on the power switch, the circulating pump of the chiller starts to work.
When the new machine is turned on for the first time, there will be more air bubbles in the
pipeline, which will cause the machine to alarm occasionally, and it will return to normal
after a few minutes of operation.
(2) After starting the machine for the first time, check if the water pipes leak immediately.
(3) After turning on the power, if the water temperature is lower than the set temperature, it
is normal that the cooling fan and other devices of the machine do not work. The
temperature controller will automatically control the working status of compressors,
solenoid valves, cooling fans and other components according to the set parameters.
6.Electrical connection
(1) Please select the cable based on the max. rated current indicated on the label of the
chiller.
(2) Recommended reference standard for power cord diameter selection.
Rated current/ A
≤5
≤10
≤15
≤25
≤35
≤50
Wire diameter (copper wire)/ mm²
1.0
1.5
2.5
4.0
6.0
10.0
Note: This data is provided according to IEC 60204-1 standard and only forreference.
Standard cables must be used in the power cord.
(3) The main circuit of the power supply must be equipped with appropriate electric leakage
and overload protection devices, and the chiller must be well grounded.
(4) Less than ±10% of power supply voltage fluctuation and less than ±1Hz of frequency
fluctuation are allowed, and keep away from electromagnetic interference sources.
7. Fill Water & Exhaust Air
(1) Fill Water
After the new machine is turned on, the air in the water pipe is emptied, and the water level
of the water tank will drop slightly. In order to keep the water level in the green area, you
can add water again. Observe and write down the current water level. After the chiller has
been running for a period of time, observe the water level gauge again. If the water level
drops significantly, check again if there is leakage in the water pipes.

TY-JS-20319-003
11
(2) Exhaust Air
After adding water for the first time or replacing water, exhaust the air in the water pump to
start use, otherwise the equipment will be damaged. The exhaust method is as follows:
Method 1: Under the state of shutting down, after adding water, remove the water outlet
and connect the water pipe, drain for 2 minutes, and then install it firmly.
Method 2:Open the water supply inlet, after starting the machine (water flows), repeatedly
press and fold the water pipe several times to drain the air from the pipe.
8.Test-run Check
(1) Check whether the pipeline connection is correct, and there must be no bubbling or
water leakage;
(2) Check whether the inlet and outlet water ball valves are open and the drain valve is
closed;
(3) Check the liquid level of the water tank;
(4) Confirm that the electrical wiring of the equipment is connected correctly;
(5) Confirm whether the equipment is grounded.
V.
Operating States & Parameter Adjustment
The new T-506D intelligent temperature controller is designed with intelligent control mode.
It will self-adjust controlling parameters according to room temperature for meeting
equipment cooling requirements.
The new T-506E intelligent temperature controller is designed with constant temperature
control mode with water temperature maintained at 25℃.Users can adjust it as needed.
T-506D and T-506E controllers are of same functions and structure except factory setting.
1.Temperature control panel introduction
2.Indicators of temperature controller working status
Refrigeration indicator - During refrigeration process, this indicator is on. In constant
temperature control mode, this indicator is off. During the delay process, this indicator
flashes.
Refrigerant solenoid valve indicator - When connected, this indicator is on. When
disconnected, this indicator is off.
Heating indicator - When connected, this indicator is on. When disconnected, this
indicator is off.
Alarm indicator - When connected, this indicator is on. When disconnected, this
indicator is off.
3.Quick setting
Press “SET” key to set the temperature. The upper window indicates F0 (F1 is indicated in
intelligent control mode) while the lower window flashes with current value. Then press “↑”
or “↓” key to change the value which will be memorized by the temperature controller.
Press “RST” key to save the data and exit.

TY-JS-20319-003
12
4.Press “→” key once to enter status display menu and it indicates t1
which suggests temperature of room temperature sensor.
Press “→” key twice to indicate t2 which suggests flow rate. (L/min, with
0.1 resolution)
Press “→” key three times to return to normal operation.
5.When first powered on, press “↓” key to cancel delay time and connect
the compressor.
6.User parameter setting (F0~F11 is available)
“↑” and “↓” keys are for changing and saving data. “←” and “→” keys are for switching
items. Press and hold “SET” key, “↑” key and “↓” key for 6 seconds to enter parameter
setting until the lower window indicates PAS and the upper window indicates 00. Press “↑”
or “↓” key to revise password (F7 is for revising password) and then press “SET” key. If
the password is correct, the lower window indicates F0 and the parameter is available for
revision. If the password is wrong, it will return to temperature display. If there is no action
within 20 seconds, the temperature controller will also automatically exit parameter setting
status. Press “RST” key to save the data and exit.
7.Restore to factory settings
After the power is on for 30 seconds, press and hold “↑” and “↓” keys for 3 seconds until
it displays “rE”. The supplier parameter and user parameter will restore to factory value. 3
seconds later, it will return to temperature display.
8.Alarm codes description
E1
E2
E3
E4
E5
E6
E7
Ultra-high
room
temperature
Ultra-high
water
temperature
Ultra-low
water
temperature
Room
temperature
sensor
failure
Water
temperature
sensor
failure
External
input alarm
Flow
alarm
9.Advanced parameters adjustment examples
Order
Code
Items
Value in
Case 1
Value in
Case 2
1
F0
Temperature setting
25
2
F1
Temperature Difference Values
-3
3
F2
Refrigeration return difference
0.5
2.0
4
F3
Way of control
1
0
5
F4
Alarm for ultra-high water temperature
15
5
6
F5
Alarm for ultra-low water temperature
15
10
7
F6
Alarm for ultra-high room temperature
45
45
8
F7
Password
8
8
9
F8
The allowed highest water temperature
31
30
10
F9
The allowed lowest water temperature
25
5
11
F10
Flow alarm
0.5
0.5
12
F11
Communication address
1
1

TY-JS-20319-003
13
Case 1: Cooling water temperature is controlled by the intelligent control mode. The
required water temperature is from 25℃to 31℃and the set water temperature
is 3℃lower than the air temperature. Under the condition of constant air
temperature, the fluctuation should not exceed ±0.5℃. The alarm will be
triggered when the water temperature is 15℃lower or higher than the target
temperature (e.g., if the air temperature is 30.0℃, cooling water temperature is
between 27.5 ℃to 26.5 ℃, if the air temperature is up to 30.5 ℃, water
temperature will be between 28.0℃to 27.0℃).
Case 2: The cooling water temperature is controlled by the constant mode. It is required
that the water temperature is kept constant at 25℃, and the fluctuation should not
exceed ±2℃. The ultra-high temperature alarm will be triggered when the water
temperature is 5 ℃higher than the target temperature; and the ultra-low
temperature alarm will be triggered when the water temperature is 10 ℃lower
than the target temperature. The water temperature setting can be easily
adjusted from 5℃to 30 ℃by user setting.
VI.
Alarm & Output Terminal
In order to guarantee the equipment will not be affected while abnormal situationhappens
to the chillers, the chillers has been designed with an alarm protection function.
1. Alarm output terminals and wiring diagram.

TY-JS-20319-003
14
2. Alarm causes and working status table.
Display
Condition
Alarm
code
Buzzer
H1 and H2
H1 and H3
Circulating pump works
properly
open circuit
connected
Ultra-high room temp
E1
Sounds
connected
open circuit
Ultra-high water temp
E2
Sounds
connected
open circuit
Ultra-low water temp
E3
Sounds
connected
open circuit
Room temp sensor failure
(constant temp invalid)
E4
Sounds
connected
open circuit
Water temp sensor failure
E5
Sounds
connected
open circuit
Alarm of water shortage
E6
Sounds
connected
open circuit
Low flow rate /
water flow alarm
E6/E7
Sounds
connected
open circuit
Circulating pump failure
E7
Sounds
connected
open circuit
Chiller power failure
connected
open circuit
Note: The alarm output port is connected with a set of normally open and normally closed contacts
of the relay inside the machine. The working current should be smaller than 3A while the working
voltage should be smaller than 300V.
VII.
Maintenance
For equipment maintenance, firstly the machine must be stopped and the power must be
cut off. Wait 3 minutes before starting the maintenance process, otherwise there will be a
risk of electric shock. When the ambient temperature is lower than 2°C, the internal water
must be drained when the machine is shut down for a long time.
Disassemble the dust filter regularly for cleaning and use a compressed air gun to blow off
the dust accumulated in the condenser. (It is recommended to clean it once a week, and
the chiller should not without the dust filter, except for a quick cleaning process.)

TY-JS-20319-003
15
VIII.
Simple Troubleshooting
Failure
Failure Cause
Approach
Machine turned on but
unelectrified
Power cord is not plugged
in place
Check and ensure the power interface
and the power plug is plugged in place
and in good contact.
Fuse burnt-out
Pull out the fuse box from the power
supply interface of the chiller, check the
fuse, replace with spare fuse if
necessary, and check whether the
power supply voltage is stable. Check
and ensure the power interface and the
power plug is plugged in place and in
good contact.
Flow Alarm, connecting the
water outlet and inlet with a
water pipe directly, but still
no water flow
Water level in the water tank
is too low
Check the water level gauge display,
add water until the level shown in the
green area; And check whether the
water circulation pipe leaks.
Flow alarm occurs while
chiller is working. However,
when the water outlet and
inlet of the chiller are
connected directly with a
water pipe, water flows and
no alarm occur.
Water circulation pipes are
blocked or a pipe is bent or
deformed
Check the water circulation pipe.
Ultra-high water
temperatureal alarm
Blocked dust gauze, bad
thermolysis
Disassemble and clean the dust gauze
regularly.
Poor ventilation for air outlet
and inlet
Ensure a smooth ventilation for air outlet
and inlet.
Voltage is extremely low or
unstable
Improve the power supply circuit or use a
voltage regulator.
Improper parameter settings
on thermostat
Reset the controlling parameters or
restore the factory setting.
Switch the power on and off
frequently
Ensure sufficient time for refrigeration
after starting the chiller (at least 5
minutes).
Excessive heat load
Reduce the heat load or use other model
with larger cooling capacity.
Ultra-high room
temperaturealarm
The working ambient
temperature is too high for
the chiller
Improve ventilation and ensure that the
machine is operated below 40°C.
Serious problem of
condensate water
Water temperature is much
lower than ambient
temperature and the
ambient humidity is high
Increase water temperature or insulate
pipes.
Water drains slowly from
drain port during water
changing
Water supply inlet is not
open
Open the water supply inlet
Startup flow alarm
Bubble in the water pipe
Exhaust the air

TY-JS-20319-003
16
Attachment –
Schematic CW-5300
(flow sensor)
CW-5300(flow switch)

TY-JS-20319-003
17
CW-6000(flow sensor)
CW-6000(flow switch)

TY-JS-20319-003
18
CW-6100/6200/6260(flow sensor)
CW-6100/6200/6260(flow switch)

TY-JS-20319-003
19
Brand: 特域机电 S&A
Product Name: Water Chiller
Manufacturer's Company Name: Guangzhou TEYU Electromechanical Co., Ltd
Manufacturer's Address: No. 50, Zhongchuang Road, Shengshi Industrial Zone, Zhongcun Town,
Panyu District, Guangzhou
Sales Company: Shanghai Top Nine Industrial Co., Ltd.
Seller's Company Address: No.208 Wulian Road, Room164, Shanghai Pudong New District, China,
200129, CN
E-mail: colet[email protected]om
TEL: +86 18017012480
EC
REP
EU contact address:
Apex CE Specialists GmbH
Habichtweg 1 41468 Neuss Germany
E-mail: [email protected]

TY-JS-20319-003
20
Other manuals for CW-5300
3
This manual suits for next models
4
Table of contents
Other S&A Chiller manuals
Popular Chiller manuals by other brands

AIREDALE
AIREDALE SmartCool D Technical, Installation, Maintenance and Commissioning Manual

CLIVET
CLIVET WSAT-XSC3 FC 90.4 Installation and operating manual

Laird
Laird OW 4002 manual

Carrier
Carrier Pro-Dialog Plus 30SZ Installation, operation and maintenance instructions

Midea
Midea Aqua Tempo Super II Series Technical & service manual

York
York YCAL0080SC Installation operation & maintenance