
4
INSTALLER:
• Blocking is required. The ceiling or wall used for
xture installation must be able to support 300 lbs
or more. Failure to properly secure the screen may
result in injury and/or damage.
• Electrical work should be performed using
appropriate electrical codes and regulation, by a
licensed electrical professional.
• Before running cables in walls or ceilings see
controls section on pages 19 - 21 for control cable
requirements.
• Before removing the screen from the box, check for
damage and to make sure all parts are included.
• Do not use any sharp blades when opening the
screen packaging. Open by hand.
• Do not pull on the sides, crease, or fold the screen.
The screen material is very delicate.
• Care in mounting and correct operation will result
in long and satisfactory service from the SI screen.
• The screen should be level when installed. Always
use a carpenter’s level.
• Nothing should be fastened to any part of the
screen assembly.
NOTE: The screen has been thoroughly inspected and
tested at factory and found to be operating properly prior
to shipment.
END USER:
• To prevent damage, the operating and maintenance
of the screen should be performed by experienced
professionals.
• This is a nished product. Do not write or draw on
the surface.
• Do not put anything near or under the screen that
would come in contact or impede the normal
operation of the screen when deployed.
• Damage to the screen can result if an object
prevents the screen from fully deploying.
BEFORE PROCEEDING
Read the instructions in their entirety before proceeding. Actions contrary to the
instructions invalidate the warranty and may result in serious damage and/or injury.
The placement from bottom to the screen should be between 36” (91cm) - 42” (106cm).
Check the projector manual for Projector placement.