Installation Instructions
P 212 Pump
810-53492-1 Page 11 of 40
Rev.: 007
2021/04/13
Residual risk Remedy
Installation life cycle
People falling due to contamination of floors
with spilled lubricant.
Take care when filling. Bind / remove spilled
lubricant immediately with a suitable agent.
Observe the legal / company regulations on
dealing with oils / greases and contaminated
parts.
Ripping out / damage to lines when
assembling movable machine parts (e.g.
pivot arm
.
If possible, do not mount onto movable parts.
Should this not be possible, use flexible hose
lines of sufficient len
th.
Deviating installation position:
- Foreign objects falling into the motor
air intake.
- Borehole for drainage of
condensation water is no longer at
the lowest point of the motor.
Installation of a suitable protective roof over the
air intake.
Deviating installation position only if the formation
of condensation water has been completed.
Commissioning / operation / maintenance life cycle
Lubricant spraying out due to incorrect screw
connection of components / connection of
lines.
Tighten all parts with appropriate tightening
torques. Use suitable hydraulic screw
connections and lines for the stated pressures.
Check these prior to commissioning for correct
connection and dama
e.
Contact with the stirring paddles when filling
from the top during operation of the pump.
Fill preferably via the filling connection. Fill only
from the top when the pump is not moving. When
fillin
, do not reach into the reservoir.
Residual risk Remedy
Commissioning / operation / maintenance life cycle
Electric shock through reduced insulation
resistance.
Check the formation of condensation water in the
motor regularly. If applicable, drain off
condensation water at the drain plug. Check the
insulation resistance re
ularl
.
Electric shock when connecting the pump. Prior to connection of the pump, de-energize all
affected electrical components. If necessary,
please observe discharge times. The electrical
connection may only be carried out by
commissioned and qualified electricians in
accordance with the connection diagram.
Fault life cycle
Severe heat-up / defect on motor through
blocka
e.
Switch off the pump. Allow the parts to cool down
and remove the cause of the fault.
Disposal life cycle
Environmental contamination with lubricants
and moistened parts.
Dispose of the parts in accordance with the valid
le
al / compan
re
ulations.