UfiSpace S9510-30XC Manual

Hardware Installation Guide
S9510-30XC
Disaggregated Cell Site
Gateway
R1.0

S9510-30XC Hardware Installation Guide | 1
Table of Contents
1Overview.............................................................................................................................2
2Preparation.........................................................................................................................3
Installation Tools......................................................................................................................3
Installation Environment Requirements..................................................................................4
Preparation Check List.............................................................................................................6
3Package Contents................................................................................................................7
Accessory List...........................................................................................................................7
Component Physical Information............................................................................................8
4Identifying Your System.......................................................................................................9
S9510-30XC DC Version Overview...........................................................................................9
S9510-30XC AC Version Overview.........................................................................................10
DC Version PSU Overview......................................................................................................11
AC Version PSU Overview......................................................................................................11
Fan Overview .........................................................................................................................12
Port Overview ........................................................................................................................12
5Rack Mounting..................................................................................................................14
6Installing Fan Modules.......................................................................................................15
7Installing Power Supply Units ............................................................................................16
8Grounding the Router........................................................................................................18
9Connecting Power .............................................................................................................20
DC Version..............................................................................................................................20
AC Version..............................................................................................................................21
10 Verifying System Operation...............................................................................................22
Front Panel LED....................................................................................................................22
PSU FRU LED ........................................................................................................................23
Fan FRU LED.........................................................................................................................23
Management port LED.........................................................................................................23
11 Initial System Setup...........................................................................................................24
12 Cable Connections.............................................................................................................25
Connecting the USB Extender Cable....................................................................................25
Connecting a Cable to the ToD Interface.............................................................................25
Connecting a cable to the BITS Interface ............................................................................26
Connecting the GNSS Interface ...........................................................................................26
Connecting the 1PPS Interface ............................................................................................27
Connecting the 10MHz Interface.........................................................................................27
Connecting the Transceiver.................................................................................................28
13 Cautions............................................................................................................................29

S9510-30XC Hardware Installation Guide | 2
1Overview
The UfiSpace S9510-30XC is a high-performance, versatile open networking white box
router that is designed to address the changing needs of backhaul transport requirements
as Telecoms make the transition from legacy technologies towards 5G.
It enables telecoms and service providers to deploy disaggregated open network
infrastructure to lower costs and rapidly scale existing services for edge computing, mobile
backhaul, and broadband access applications.
The S9510-30XC is future-proofed with a powerful 4-core processor, 10GE/ 25G/ 40GE/
100GE high-speed interfaces, and full timing features supporting IEEE 1588v2 and SyncE,
which enables service providers to easily migrate from 2G, 3G, 4G BBUs to 5G RAN. It is
suitable for both indoor and outdoor deployments with redundant, hot swappable
components for convenience, increased availability, reliabilityand lower costs of
maintenance
This document describes the hardware installation process for S9510-30XC.

S9510-30XC Hardware Installation Guide | 3
2Preparation
Installation Tools
Screw Driver
Crimping tool
14 AWG wire with ring terminal for
DC power supply
6-AWG green-and-yellowwire
for grounding
Wire-stripping tools for
stripping 6-AWG copper wire
Console cable
•PC with terminal emulation software. Refer to the "Initial System Setup" section for
details.
•Baud rate: 115200 bps
•Data bits: 8
•Parity: None
•Stop bits: 1
•Flow control: None

S9510-30XC Hardware Installation Guide | 4
Installation Environment Requirements
•Power Reserve: The S9510-30XC power supply is available with:
1. DC Version: 1+1 active-active DC power supply field replaceable unit or;
2. AC Version: 1+1 active-active universal AC power supply field replaceable unit.
For power voltage range requirements, please see section 2.3.
To ensure the active-active feed power design functions properly, a field with dual power
circuit is recommend with a reserve of at least 400 watts on each power circuit.
•Space Clearance: The S9510-30XC width is 17.32 inches (44cm) and shipped with a rack
mount brackets suitable for 19 inch (48.3cm) wide racks. The depth of the S9510-30XC chassis
is 11.89 inches (30.2cm) without the field replaceable units (FRUs) and comes with adjustable
mounting rails suitable for rack depths of 22 inches (55.9cm) to 33 inches (83.8cm). The
handle for the fan units will extend outwards by 1 inch (2.5cm) and the handle for the power
supplies will extend outwards by 1.06 inches (2.7cm). Therefore, to accommodate the fan
handles, a minimum space clearance of 1 inches (2.5cm) is needed at the back of the S9510-
30XC. To accommodate the power supply handles, cabling and airflow, a minimum space
clearance of 6 inches (15.2cm) is needed at the front of the S9510-30XC. A total minimum
reserve depth of 18.89 inches (47.9cm) is required.
Figure 1.

S9510-30XC Hardware Installation Guide | 5
Figure 2.
•
Cooling: The S9510-30XC airflow direction is front-to-back. Make sure the equipmenton
the same rack have the same airflow direction.
Figure 3.
Figure 4.

S9510-30XC Hardware Installation Guide | 6
Preparation Check List
Task
Check
Date
Power voltage and electric current requirement
DC version: -36 to -75VDC, 16-8A maximum x 2 or;
AC version: 100 to 240VAC, 6-3A maximum x 2
Installation spacing and weight load requirement:
S9510-30XC chassis spacing requires a height of 1RU (1.75”/4.5cm),
a width of 19” (48.3cm), and a depth of 18.89 inches (47.9cm)
Thermal requirement
S9510-30XC working temperature is -40 to 65°C (-40°F to 140°F),
airflow direction is front-to-back
Installation tools required
#2 Philips Screwdriver, 6-AWG wire stripper, and crimping tool
Accessories required
PC with terminal emulation software, console cable, 14-AWGwire
with ring terminal for power, 6-AWG green-and-yellow wire for
grounding

S9510-30XC Hardware Installation Guide | 7
3Package Contents
Accessory List
Item
Description
Spec. & Dimensions
Qty.
Weight
1
Grounding Lug
1.97” x 0.49” x 0.3”
(#6 AWG)
(50 x 12.6 x 7.5mm)
1 pcs
0.22lbs (10.0g)/pcs
2
Screw Kit
(for Grounding Lug)
2 x Screws M4*L8.0mm
4 x M4 Lock Washers
1 set
0.008lbs (3.8g)/set
3
Rack Mount Bracket
1.98” x 1.69” x 0.79”
(19” width rack)
(50.4 x 43 x 20mm)
2 pcs
0.15lbs (67.2g)/2 pcs
(0.07lbs (33.6g)/pcs)
4
Screw Kit (for Rack
Mount Bracket)
8 x Screws M4.0*L6.5mm
1 set
0.01lbs (6.5g)/set
5
Adjustable Mounting
Rail (for 4 posts)
16.02” x 1.69” x 0.83”
(22” to 33” rack depth)
(406.8 x 43 x 21mm)
2 pcs
1.79lbs (810g)/2 pcs
(0.89lbs (405g)/pcs)
6
Screw Kit
(for Adjustable
Mounting Rail)
8 x Screws M4.0*L6.5mm
1 set
0.01lbs (6.5g)/set
7
USB 3.0A Cable
Type Male to Female
7.87” (200mm)
1 pcs
0.021lbs (9.7g)/pcs
8
AC power cord
(AC version only)
72.05” (1830mm)
2 pcs
1.04lbs (470g)/2 pcs
(0.52lbs (235g)/pcs)
9
RJ45 to DB9 Female
Cable
94.49”(2438mm)
1 pcs
0.23lbs (105g)/pcs

S9510-30XC Hardware Installation Guide | 8
Component Physical Information
Specification
Item
Description
Weight
Total package contents
23.08lbs (10.47kg)
Chassis without FRU
9.92lbs (4.5kg)
Power Supply Unit(PSU)
DC PSU: 1.48lbs (672.2g)
AC PSU: 1.58lbs (716g)
Fan
0.2lbs (90g)
Ground lug
0.022lbs (10g)
Rack mount bracket
0.07lbs (33.6g)
Adjustable mounting rail
0.89lbs (405g)
USB extension cord
0.021lbs (9.7g)
Screw kit for ground lug
0.008lbs (3.8g) per set
Screw kit for rack mount
bracket and adjustable
mounting rail
0.1lbs (6.5g) per set
Dimension
S9510-30XC (W x D x H)
17.32” x 11.89” x 1.713” (440 x 302 x 43.5mm)
PSU (W x D x H)
1.99” x 8.31” x 1.58” (50.5 x 211 x 40.2mm)
Fan (W x D x H)
1.57” x 1.1” x 1.57” (40 x 28 x 40mm)

S9510-30XC Hardware Installation Guide | 9
4Identifying Your System
S9510-30XC DC Version Overview
Figure 5.
Figure 6.

S9510-30XC Hardware Installation Guide | 10
S9510-30XC AC Version Overview
Figure 7.
Figure 8.

S9510-30XC Hardware Installation Guide | 11
DC Version PSU Overview
1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU).
Figure 9.
Figure 10.
AC Version PSU Overview
1+1, hot swappable power supply unit (PSU) field replaceable unit (FRU).
Figure 11.

S9510-30XC Hardware Installation Guide | 12
Figure 12.
Fan Overview
4+1, hot swappable fan field replaceable unit (FRU).
Figure 13.
Port Overview
Port ID
Form Factor
Maximum Support Distance
Support Speed
0 ~ 1
QSFP28
24.85mi (40km)
100GE
2 ~ 29
SFP28
24.85mi (40km)
25GE
DC Version:

S9510-30XC Hardware Installation Guide | 13
Figure 14.
AC Version:
Figure 15.

S9510-30XC Hardware Installation Guide | 14
5Rack Mounting
It is recommended that installation be done by two trained professionals. One
individual should hold the equipment in position on the rack while the other
secures it in place.
1. Secure the rack mount brackets onto the router.
Align the rack mount brackets with the holes provided on the both sides of the case and
secure the brackets using the 8 M4.0*L6.5mm screws provided with the package.
Figure 16.
2. Secure the router onto the rack posts.
Mark the location on both posts to ensure it is leveled before securing the router onto
the rack using the screws and cage nuts provided with the package (See Figure 17). For a
4 post rack, first secure the adjustable mounting rail to the back of the router using the
M4.0*L6.5mm screws provided in the package. Then secure the adjustable mounting rail
to the rack posts using the screws and cage nuts provided (See Figure 18).
Illustrations are for reference purposes only. Actual cabinet posts may differ.
Figure 17.
Figure 18.

S9510-30XC Hardware Installation Guide | 15
6Installing Fan Modules
The fan modules are hot swappable field replaceable units (FRUs), which can be replaced while the
router is operating as long as all the remaining modules are installed and in operation. The fans
come pre-installed and the following steps are instructions on how to install a new fan module.
1. Loosen the captive screw located on the fan module.
Figure 19.
2. Grip the fan's handle and firmly pull it out of the fan bay.
Figure 20.
3. Align the new fan module with the fan bay.
4. Carefully slide the new fan module into the fan bay and gently push until it is flush with the
case.
5. Secure the captive screw on the fan module to lock the fan in place.
Figure 21.

S9510-30XC Hardware Installation Guide | 16
7Installing Power Supply Units
The power supply unit (PSU) is a hot swappable field replaceable unit (FRU) and can be replaced
while the router is operating as long as the remaining (second) PSU is installed and in operation.
The PSUs comes pre-installed and the following are instructions on how to install a new PSU.
DC:
AC:
Figure 22.
Shock hazard!
For safety, please disconnect all power inputs from the power supply unit before
servicing the router.
1. Locate the release tab on the PSU. Then press and hold down the release tab to unlock the PSU
from the power bay.
2. While holding down the release tab, grip the PSU's handle and firmly pull it out of the power
bay.
DC Version:
AC Version:
Figure 23.

S9510-30XC Hardware Installation Guide | 17
3. Align the new PSU with the power bay, ensuring the PSU’s power connector is in the correct
position.
4. Carefully slide the new PSU into the power bay and gently push until it is flush with the case.
5. An audible click will be heard when the PSU is installed correctly. The PSU will not go in all the
way if it is in the wrong direction.
Illustrations are for reference purposes only. Actual cabinet posts may differ.
DC Version
Figure 24.
AC Version
Figure 25.

S9510-30XC Hardware Installation Guide | 18
8Grounding the Router
It is recommended that equipment changes be done on a grounded rack system. This will reduce
or prevent the risk of shock hazards, equipment damage, and potential of data corruption.
The router can be grounded from the router's case and/or the power supply units (PSUs). When
grounding the PSUs, ensure that both PSUs are grounded at the same time in case one of them is
removed. A grounding lug and M4 screws and washers are provided with the package contents,
however, the grounding wire is not included. For convenience, there are two locations on the case
in which the grounding lug may be fixed.
The following instructions are for grounding the router.
This equipment must be grounded. Do not defeat the ground conductor or
operate the equipment without correctly grounding the equipment. If there is any
uncertainty about the integrity of the equipment's grounding, please contact the
electrical inspection authority or a certified electrician.
1. Before grounding the router, ensure that the rack is properly grounded and in compliance with
local regulatory guidelines. Ensure that there is nothing that can obstruct the connection for
grounding and remove any paint or materials that may prevent good grounding contact.
2. Strip the insulation from a size #6 AWG grounding wire (not provided within the package
contents), leaving 0.5” +/-0.02” (12.7mm +/-0.5mm) of exposed grounding wire.
3. Insert the exposed grounding wire all the way into the hole of the grounding lug (provided with
package contents).
4. Using a crimping tool, firmly secure the grounding wire to the grounding lug.
Figure 26.

S9510-30XC Hardware Installation Guide | 19
5. Locate the designated location for securing the grounding lug, which is located on the side of
the router.
6. Using 2 M4 screws and 4 washers (provided with the package contents), firmly lock the
grounding lug to either of the designated grounding locations on the router.
Figure 27.
Figure 28.
Figure 29.
Table of contents
Other UfiSpace Gateway manuals

UfiSpace
UfiSpace S9502-16SMT Manual

UfiSpace
UfiSpace GEE810E-868U User manual

UfiSpace
UfiSpace S9500-30XS Manual

UfiSpace
UfiSpace S9510-28DC Manual

UfiSpace
UfiSpace S9500-22XST Manual

UfiSpace
UfiSpace S9501-28SMT Manual

UfiSpace
UfiSpace T77I868.00 User manual

UfiSpace
UfiSpace S9501-18SMT Manual

UfiSpace
UfiSpace Outdoor R1 Series User guide

UfiSpace
UfiSpace S9502-12SM Manual
Popular Gateway manuals by other brands

Commend
Commend Audiocodes MP-11 Series Setup guide

Ruckus Wireless
Ruckus Wireless Virtual SmartZone High Scale reference guide

ZyXEL Communications
ZyXEL Communications P-660HN-51 - user guide

NETGEAR
NETGEAR DVG834N datasheet

SerVision
SerVision HVG400 Configuration and management guide

AT&T
AT&T NVG599 Self-installation guide