
QUICK START GUIDE
Page 2
© 2021 ABB. All rights reserved.
Step 3 - Connect Chassis and DC Reference (CO) Grounds
Connections are on the rear.
• Lug Landing: #10 on 5/8-inch center (lugs not provided)
• 10 AWG recommended
1. Connect Chassis Ground - Torque to 30 in-lb (4 Nm)
2. Connect DC Reference Ground - Torque to 30 in-lb (4 Nm)
Step 4 - Connect DC Output
Connections are on the rear. The shelf provides unprotected bulk output to an external distribution panel.
1. Lug Landing: #10 on 5/8-inch center (lugs not provided)
2. Connect +Bulk and -Bulk cables - Torque to 30 in-lb (4 Nm)
Step 5 - Set Jumpers - LAN Port and Relay per Galaxy Pulsar Edge Controller Quick
Start Guide Relay Jumpers
1. Set Jumpers - LAN Port and Relay
Step 6 - Install Controller per Galaxy Pulsar Edge Controller Quick Start Guide
Step 7 - Install Signal and Communications Cables
Connectors are on front
See Information: Alarm Connections … for Details
1. J1 Alarms and Inputs - Connect to office alarms and signals.
2. J5 LAN - Connect to Ethernet network.
Step 8 - Install 1-Wire Battery Temp and Voltage Monitor per Galaxy Pulsar Edge
Controller Quick Start Guide - Optional
1. Connect 1– Wire Battery Temp and Voltage Monitor to J2
Note: Some applications may rely on frame
mounting screws for chassis ground omitting the
shelf ground cable
- Bulk load output
(unprotected)
Chassis Ground.
+ Bulk load output
(unprotected)
DC Reference
ground. If required.
Step 2 - Connect AC Inputs (Continued)
R4
R2
RS
R3
Rl
L2/N
1 F
EED
P
ER
RECTIFIER
ll
4 3 2 1
PMN
P
MJ
OR
L
2/
N
Jl
1111
11111,1,
Ll
1
FEED
PER
3
OR
2 RECTIFIERS
£££.&..&..&.
Cl
<>se
<>
nAl~•m
Ii.I
Iii
IiiIiiIiiIii
O
p(il
n Q n
Al41Tm
(not
available
in
two
shelfsystems)