Band-it UL4000-D User manual

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 1
Operating Instructions
Cordless Ultra-Lok®Tool

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 2
Contents
Warranty and Safety Guidelines....................................................................................................3
Setup Instructions..........................................................................................................................4
Tool Settings..................................................................................................................................6
Parts List........................................................................................................................................7
Exploded View...............................................................................................................................8
Clamp Application: Free-End Clamps..........................................................................................10
Clamp Inspection.........................................................................................................................11
Clamp Application: Preformed Clamps........................................................................................12
Maintenance................................................................................................................................13
Blade Change: Optional ½” Tool..................................................................................................15

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 3
Warranty and Safety Guidelines
WARRANTY
Refer to website for warranty information: http://www.band-it-idex.com/warranty.html
NOTE: Any performance data published herein is based on laboratory tests, which cannot duplicate conditions that
may be encountered in field installations. Such conditions may vary results substantially from those shown (such as
abuse in handling and installation, failure to follow recommended handling and installation practices, abnormal
environmental conditions, disregard of operating instructions for BAND-IT tools or non-recommended combinations of
BAND-IT products). BAND-IT cannot be responsible for performance characteristics from such variables.
Safety Guidelines
WARNING:
Always wear safety glasses when operating this tool and keep both hands and clothing away from clamp
being tensioned. Squeezing force can reach as high as 2 tons. Never attempt to clamp objects which can
shatter or otherwise cause bodily harm. Tensioning the clamp can be stopped immediately by releasing the
trigger. Detailed instructions are in this manual and the operator is advised to read it and become familiar with
operating the tool.
IMPORTANT FOR HOSE APPLICATIONS:
When clamping a hose end, remember that a tighter clamp keeps the fitting more secure, but excess
tension can damage the hose. Fitting stem must have prominent barbs for proper retention inside the
hose, but must not be sharp to prevent cutting into the hose. Hose, fitting, and clamp must be
compatible with each other and the environment used in. If in doubt, consult the hose or fitting
manufacturer or call BAND-IT.
Improperly tightened clamps may result in dangerous hose assemblies, which could cause injuries or property
damage.
Abuse or use of a hose outside the manufacturers recommended conditions may cause it to quickly deteriorate
and become a safety hazard. This could result in serious injury or property damage. Inspect and test hose
assemblies frequently.
Clamping objects other than hose requires similar precautions.
Use only with BAND-IT 3/4" and 1/2" Ultra-Lok Free-End and Preformed Clamps
Use of Alternate Drills
CAUTION!
This tool is designed to work solely mounted to the Metabo BS 18 LTX series cordless drill. Use of any other drills in
place of these Metabo BS 18 LTX drills may result in unsatisfactory performance, hazards to the operator and/or the
tool, or unsafe clamps. Disregard of this caution voids the warranty of the tool and releases BAND-IT of any and all
liabilities arising from such misuses.

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 4
Setup Instructions
1. Read safety instructions and operator’s manual for the Metabo BS 18 LTX cordless Drill. Check to make sure
drill is properly set up for use with Band-It Ultra-Loktool as follows:
a. Drill spindle has a Clutch Assembly (Band-It # UL4001)
b. See page 6 for recommended Drill speed and torque settings.
2. Charge Drill Battery according to the operator’s manual.
3. To mount the Drill onto the Band-It Ultra-LokTool:
a. First, using the two #10-32 x 3/8" screws (M06187), tighten the Tool Body Adapter (M07697) on the
Tension Tool (UL0001) with 20–30 in-lbs.
b. Place the Adapter Collar (M08288) over the Tool Body Adapter.
c. Orient the Drill Clutch Pin (M07187) horizontally (see page, 5 Figure 2).
d. Carefully place the Tool Body Adapter over the Drill’s collar. If there is any additional resistance, gently
rotate the Tension Tool until the Tension Screw engages with the Drill Clutch (M04298) (see page 5,
Figure 3), and rotate Tension Tool to the desired orientation.
e. Position Tool Body Adapter to butt-up against the shoulder of the drill.
f. Slide the Adapter Collar against this shoulder and fasten to 40–60 in-lbs.
4. This tool was designed for, and can only be used with BAND-IT 1/2" and 3/4" wide Ultra-Lokclamps. Do not
attempt to use on any other type of clamp style. Only use 1/2" wide clamps when the optional 1/2" Shear Plate
(BAND-IT # M09387) has been installed in the head in place of the 3/4" Shear Plate. See page 15 for ½” blade
change procedure.
Figure 1

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 5
Drill Clutch M04298
Note: Tool Body Adapter and Adapter Collar are hidden for clarity
Tension Screw M00987
UL Tool Body
NOTE: Alignment is critical for proper tool function.
Orient Drill Clutch
Pin M07187
horizontally
Figure 2: Align the pin within the drill clutch
Figure 3: Align the end of the Tension Screw with the slot in
the end of the Drill Clutch during assembly, as shown above.

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 6
Tool Settings
Recommended Drill Torque Dial Settings:
Drill Model
Metabo BS 18 LTX
Clamp Size
½"
¾"
Speed
Clutch
Speed
Clutch
Single Wrap
1
5
1
6
Double Wrap
1
6
1
7
*Preformed
1
6
1
7
Band-It recommends hearing protection if this setting is used for an extended time.
NOTE: These torque settings are suggested settings only; individual tools should be adjusted for the
clamping application. Inspect lock per instructions on page 9-11.
Battery Recommendation: In order to maintain consistent tension when installing clamps, Band-It recommends
that the drill be recharged once the indicator on the battery drops to 1 out of 4.
Important: Changing speed and clutch settings will alter tension output. Drill Trigger should be depressed fully
by the operator to attain correct, and consistent, tension when installing clamps. Tension output may vary from
tool to tool, at the same setting, depending on condition and wear of internal components.
Caution: Improperly tightened clamps may result in dangerous assemblies, which could cause injuries or
property damage.
Using correctly sized clamps (diameter) will, in most cases, eliminate the need to pull on clamp tail more than
once. Tension Block moves approximately 5". On occasion, if needed, large size clamps can be installed by
taking several bites (clamp tail feeds out through back of tool). Position of Tension Block, containing gripper,
can be monitored through viewing slot just under cut-off handle. The tool features a built-in disengaging
mechanism to prevent tension screw from jamming up. At the end of the Tension Block travel the safety clutch
will engage and the user will hear a ratcheting sound. Excessive use of this feature will wear the Drill Clutch
mechanism and/or Tension Screw out prematurely.

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 7
Parts List
Item
Part Number
Qty
Description
1
M00587
1
Tool Head, Fin. UL
2
M09787
1
Cutter Blade, UL
3
M08687
1
Cutter Knife, UL
4
M08987
1
Cam, Cut-off, UL
5
M09087
1
Tension Block, Mach., UL
6
UL1219
1
Handle Assembly:
Includes Handle, Handle Grip, and Pins
7
M00987
1
Tension Screw, Fin.
8
M08887
1
Gripper, UL
9
M01787
1
Plate, Back, Cast/Fin.
10
M09187
1
Gripper Guide, UL
11
M02387
1
Plate, Release, cast/fin.
12
M00287
1
Roller, Cut-off, Fin.
13
M01388
2
Pin, .187 Dia X 1.50 Long, Fin.
14
M05387
1
Bearing Tip, Fin.
15
M06587
1
Ball, ¼” Diameter
16
M02287
1
Tip, Load Bearing, Fin.
17
M04387
1
Tripper Bracket, Cast/Fin.
18
M07387
1
Body, Left, Finished, UL
19
M07487
1
Body, Right, Finished, UL
20
M07587
2
Wear Plate, Fin.
21
M05787
2
Screw, Socket Head Cap, ¼ X 1”
22
J67287
4
Screw, Socket Head Cap, ¼ X ½”
23
M06187
6
Screw, Socket Head Cap, #10-32 X 3/8”
24
M02487
2
Screw, Spring Plunger, ¼-20
25
A33887
1
Spring, Compression, .180 X .813 Long
26
A53587
2
Spring, Compression, .300 X 1.00 Long
27
M01487
1
Pin, Dowel, ¼ Dia X 1.50 Long
28
M08187
4
Washer, .128 ID X .238 OD
29
M08087
4
Rivet, Blind, .125 X .328 Long
30
M07987
2
Threaded Insert, #10-32
31
I16387*
-
Lubricant, Super Lube w/ Teflon
32
C23199
-
Lubricant, Moly, Syringe
33
M09887
1
Shear Plate, ¾”, UL
34
M09387
1
Shear Plate, UL, ½” (Optional)
35
UL4001
1
Adapter and Clutch Assembly
Notes:
Apply Item 31 (Super Lube) to:
Item 4 (Cut-off Cam)
Item 3 (Cutter Knife) at contact
point with item 1 (Tool Head)
Item 26 (Spring) before installation
Apply Item 32 (Grease) to:
Item 7 (Tension Screw) threads
and grooved end
Item 2 (Cutter Blade) counter-bore
only, after item 14 (Bearing Tip)
has been installed.
Tighten the following:
Item 23 (#10-32 Screws)
to 60 –70 in-lbs.
Item 22 (1/4-28 Screws)
to 90 –110 in-lbs.
Adjust Item 24 (Plunger) for
positive detent action when
item 6 (Handle) is actuated.
* Permatex P/N: 82325 or Equivalent
Tool Accessories:
UL4199 –UL Safety Strap: 15 lb capacity tool lanyard with single stainless carabineer.
OSHA: 192.45 (h)(1) –Falling object protection

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 8
Exploded View
18
28
6
19
23
22
6
29
30
2 Places
4
20
Tension Block
Assembly
Head Unit
Figure 4

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 9
17
9
5
Component
under spring
load when
assembled
10
7
32
Brush lubricant evenly
on threads
2 Places
26
31
8
16
32
31
All around inside
profile both sides
Tension Gripper Assembly
Tool Head Assembly
See page 6 for parts list
* M09387 (Optional)
½” Shear Plate Insert
can be substituted for
M09887
13
31
2 Places
2 Places
24
4
Lubricate
both sides
31
2 Places
21
32
15
14
2
33
*
3
12
31
1
25
31
Component
under spring
load when
assembled
11
27
31
31
Inside knife cavity
Figure 6

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 10
Clamp Application: Free-End Clamps
1. Break off an Ultra-LokFree-End
tie from the roll. Slide the buckle
onto band with indented arrows
pointing in same direction and
same side up. Slide buckle all
the way onto band until it comes
to a stop between the two buckle
dimples at opposite end of tie.
2. Wrap tie around object to be clamped.
Insert the tie through buckle once for
single-wrap or twice for double-wrap.
Double-wrapped clamps have more
than 3 times the loop-tensile strength.
3. If desired, you may pre-
form a clamp in the same
fashion as step 2, or use a
preformed clamp in place
of a Free-End
4. Position the tie on the
object you are clamping.
Pull the wrapped tie
hand-tight. Slightly bend
the tail up to keep the
clamp in place
5. Actuate Drill until Tension Block is all the
way forward against the tool body. Set Drill
to clock-wise rotation. With cut-off handle
down as shown, insert clamp tail into tool
head slot. Actuate Drill until Drill’s built-in
clutch disengages. If Tension Block comes
near its end of travel, release actuator switch
and reverse Drill to pull more on clamp tail.
Excessive use of disengaging Drill Clutch
indicated by a loud ratcheting sound leads to
premature wear of tension screw.
6. Do not force the tool against the
clamp; it may result in a folded clamp
tail.
7. Pull the cut-off handle forward to cut
tail off and form a lock, then return
handle to the down position. Reverse
drill and feed clamp tail out of tool.
8. Tap down buckle shroud to complete
clamp. Tool is ready for next clamp.
Incorrect position of tool
while tensioning
Correct position of tool
while tensioning

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 11
Clamp Inspection
Lock sheared in center
and formed inside
shroud
Section View
Good Clamp
Inspect buckle on the completed clamp and tap down the buckle shroud
FRONT VIEW
Completed Free-End Clamp
(Visually inspect lock)
Buckle Shroud
Shear Surface
Bad Clamp
Lock has slipped back
under sheared buckle
surface
Figure 7
Important: Visually inspect lock formed in band as shown. If lock has slipped under the sheared surface of the
buckle, remove clamp and install a new one at reduced tension by lowering the Drill Clutch torque setting.
SIDE VIEW
Completed Free-End
Clamp
Tap down buckle shroud to
complete clamp
Figure 8

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 12
Clamp Application: Preformed Clamps
1. Place clamp in desired position on object to be clamped.
2. Start at Step 4 on Page 10 and complete the same installation process
3. Inspect buckle on completed clamp and tap down buckle shroud as shown on Page 11 Figures
7 and 8.
NOTE FOR HOSE APPLICATIONS:
When applying clamps on soft, thick-walled hose, tension clamp then wait a full 30 seconds.
Clamps may be re-tensioned by squeezing the Drill Trigger on the power unit a second time prior to
forming the lock and cutting the excess clamp tail. This allows hose to “settle” under the band of
the clamp. This hose material attribute is called Cold Flow. Finally, complete clamp by tapping
down the buckle shroud as described above.
Trouble-Shooting
1. Lock slips down in buckle: Tighten blade mounting screws. If lock on clamp is still not
adequate, reduce tension on tool by setting torque setting on the Drill Dial to a lower number.
2. Drill clutch releases prematurely: Make sure Tool is fully seated on Drill (per page 4). If
problem persists, contact BAND-IT technical support.
3. If tool does not cut off on initial setting:
a. Step 1: Pull trigger of tool after engaging cutter blade.
b. Step 2: Increase torque setting slightly, and repeat tensioning band and engaging of
cutter blade.
c. Step 3: Repeat steps 1 and 2 until band cuts.
4. Tool does not fully tension clamp: Check battery charge level, replace if low. If problem
persists, check gripper assembly and tension screw for excessive dirt/grime build up.
Note: To mitigate Drill Clutch wear, do not over-use the Drill Clutch. When tensioning a clamp,
let the Drill Switch go as Tension Block nears its end of travel. Reverse drill and send Tension
Block all the way forward for a second pull on the band.

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 13
Maintenance
1. Approximately every 500 clamps lubricate Tension Screw
with molybdenum disulfide lubricant, or equivalent. Make
sure Tension Block is all the way forward against the Tool
Head. Remove cap from syringe and insert tip of syringe
into slot on top of tool body. Press the tip against the
Tension Screw just behind the Tension Block and
squeeze out approximately 1/2" long bead of lubricant.
Remove Syringe, and actuate tool without a clamp a
couple of times to spread lubricant evenly on tension
screw. To order more lubricant, specify BAND-IT
#C23199
2. Every 500-1000 clamps, depending on torque setting,
inspect and repack front bearing with same lubricant.
Turn load bearing tip and small bearing tip over for a new
bearing surface.
Tool
Body
Tool Head Item 1
Lubricating Syringe
Reorder #C23199
Bearing Detail
Figures 9 and 10
3. To gain access to bearing components: remove blade Mounting Screws (2
places) and slide Blade free. Paper clip may be used to push bearing
components out of Blade. Wipe lubricant from components. If ball or
bearing tips appears heavily worn, replace with new one. Note: 1/4" ball is
made from hard tungsten carbide material, do not replace with regular ball
bearing. (Smooth indention from ball in the bearing tips is normal).
4. To re-assemble bearing components: wipe blade cavity clean. Push small
bearing tip into blade cavity. Apply lubricant to ball and push into Blade
cavity and fill remaining space with lubricant. Push load bearing tip firmly
into blade cavity, some lubricant will be squeezed out. Re-attach blade to
Tool Head, making sure that load bearing tip extends into Tension Screw.
While turning Blade Mounting Screws into Blade, push on Blade rear-
wards. Tighten screws to approximately 120 in-lbs.
Small Bearing Tip
M05387
1/4" Ball
M06587
Load Bearing Tip
M02287
Access Hole to push
out components (use
paper clip)
Blade
M09787
Blade Cavity,
must be packed
with lubricant
Tension
Screw
M00987
Blade Mounting
Screws
M05787
Figure 11

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 14
5. To replace Gripper: Make sure Tension Block is all the way forward against the tool head. Remove drill. Remove
tool adapter body. Remove one side of the tool body or the other, not both. Slide Gripper out sideways and
replace with a new one. Re-attach Tool Body side. Caution: Do not push or move Tension Block while Gripper is
out of tool.
Tension
Screw
M00987
Move tension
block all the way
forward against
the tool head
Tool Head
M00587
Gripper
M08887
Screw, #10-32
M06187
Figure 12
6. To replace Tension Screw: Move Tension Block all the way back (away from Tool Head) using drill in tensioning
mode (clock-wise). Remove Ultra-LokTool from Drill. Remove the Tool Adapter from the Ultra-LokTool.
Remove Blade and load bearing tip from Tensioning Screw (see bearing detail). Remove one side of the Tool
Body or the other, not both. Grasp the smooth barrel on Tension Screw and pull all the way forward until Tension
Block is against the Tool Head. If Tension Screw is stuck, use a punch and tap the center of the screw from the
back end of the tool. Turn Tension Screw out of Tension Block. Lubricate new Tension Screw with Molybdenum
Disulfide lubricant, or equivalent. Install new Tension Screw in reverse order; making sure that back end of
Tension Screw extends well beyond the back end of the Tension Block. Push the assembly all the way back and
extend the round portion of the Tension Screw through holes on the tripper bracket and back guide plate. Reinstall
Tool Body side. Reinstall Blade and tighten the Blade Mounting Screws approximately 120 in-lbs. Reattach Tool
Adapter to Ultra-LokTool. Reattach Tool to Drill and drive Tension Block all the way forward.
Note: Drills needing repair must be returned to Band-It.

UL4000-D
ULTRA-LOK® TOOL
BAND-IT IDEX, Inc. Document # P09986 Rev. B
A Unit of IDEX Corporation © Copyright
4799 Dahlia Street www.BAND-IT-IDEX.com BAND-IT IDEX, Inc. 2016
Denver, CO 80216-0307 USA All Rights Reserved
P: 1-800-525-0758
F: 1-800-624-3925 15
Blade Change: Optional ½” Tool
To change out the tool to the 1/2" version, the following steps should be followed.
*NOTE: Do not attempt to use 1/2" clamps with 3/4" head. (Shear Plate change-out: 3-5 minutes)
1. Prior to separation from power drill, back off Tension Block assembly 1/2" from head unit. See page 7 Figure 4.
2. Detach Tension Body from the Drill by loosening the single tensioning bolt on the aluminum collar and separating
the two sections.
3. Remove the Blade from head by removing the two Cap Screws (M05787) from the top of the Head. It is not
necessary to remove entire head from tool in order to remove blade. (Figure 13) Remove the 3/4" shear plate from
the blade.
4. Align the 1/2" Shear Plate (M09387) with the Blade (M09787) so that the guide is facing up. Incorrect placement
will not allow bands to be inserted into the Tool. (Figure 13)
Note: To convert Tool back to 3/4", replace 1/2" Shear Plate with 3/4" Shear Plate (M09887) and follow same
instructions. Be sure to retain unused Shear Plate for later use.
5. Attach the Blade and 1/2" Shear Plate onto Head using the two previously removed Cap Screws. These Cap
Screws must be tight to assure proper cut-off of clamp tails.
6. Re-attach Drill to Tension Body making sure the Drill and Tension Body are properly aligned, and tighten the single
Blade Cap Screw located on the Adapter Collar.
7. These tools are NOT designed to work with traditional band and buckle designs. BAND-IT Ultra-Lok
clamps must be used.
Optional 1/2" Shear
Plate (M09387)
Orient as shown
Blade (M09787)
Blade Cap Screw
(M05787) Qty. 2
1/4" Ball (M06587)
Bearing Tip (M05387)
Blade (M09787)
Figure 14
Figure 13
Table of contents
Other Band-it Tools manuals

Band-it
Band-it GRSM17 Manual

Band-it
Band-it GRS038 User manual

Band-it
Band-it C002 JR User manual

Band-it
Band-it GRC003 User manual

Band-it
Band-it IT8000 User manual

Band-it
Band-it A92079 User manual

Band-it
Band-it S038 User manual

Band-it
Band-it G40269 Giant II User manual

Band-it
Band-it S75099 User manual

Band-it
Band-it Ultra-Lok UL4000-BUltra-Lok UL4000-B220 User manual