manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Dover
  6. •
  7. Industrial Equipment
  8. •
  9. Dover OPW CIVACON T196SV-CV Instructions for use

Dover OPW CIVACON T196SV-CV Instructions for use

T196SV-CV Crude Vapor Recovery Vent
Instruction & Maintenance Manual
Product Description
Civacon’s T196SV-CV Crude Oil Vent is manufactured to withstand high pressure
crude applications. It will open against 35 psi tank pressure. The unique
patent pending dual stage poppet will relieve tank pressure during the 1st stage,
allowing for optimal venting during the 2nd stage action. It is designed and
tested to take the punishment of crude oil transportation at temperatures from
-40oF to 220oF (-40oC to 104oC). A new cap design threads into the top of the
vent which allows for a better seal and eliminates the snap ring on top.
WARRANTY
All parts and products are thoroughly inspected and tested from the time raw
material is received at our plant, until the product is completed. We guarantee
that all products are free from defects in materials and workmanship for a
period of one year from the date of shipment. Any product that may prove
defective within said one year period will, at our discretion, be promptly
repaired, replaced or credit given for future orders. This warranty shall not apply
to any products which has been altered in any way, which has been repaired by
any party other than an authorized service representative, or when such a failure
is due to misuse or condition of use. We shall have no liability for labor costs,
freight costs or any other costs or charges in excess of the amount of invoice
for the products.
THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR
IMPLIED AND SPECIFICALLY THE WARRANTIES OF MERCHANTABILITY
AND FITNESS FOR A PARTICULAR PURPOSE.
WARNING!!
CIVACON products should be used in compliance with the applicable federal,
state and local laws and regulations. Product selection should be based on
physical specifications and limitations, compatibility with the environment,
and the material being handled.
CIVACON MAKES NO WARRANTIES OF
FITNESS FOR A PARTICULAR PURPOSE.
TECHNICAL ASSISTANCE
If at any time during the installation a question arises that is not covered in this
manual or with any other applicable documents feel free to call the Customer
Service Department or visit our website at www.civacon.com.
In the U.S., call 1-888-526-5657
In all other countries, call your local agent.
Manual
This manual contains the inspection, maintenance schedule and instructions
for repairing and replacing parts for the T196SV-CV crude vapor recovery vent.
The following schedule, based on the environmental conditions in the northern
United States, is only a recommendation: Inspection and maintenance intervals
must be adjusted according to use and operating conditions. Compatible with
diesel, bio-diesel, gasoline, ethanol and methanol
NOTE: All information subject to engineering and/or other changes. All trade names are copyrighted. Patents Pending. ©2018 Civacon. ©2018 Delaware Capital Formation, Inc.
All Rights Reserved. DOVER and the DOVER logo are registered trademarks of Delaware Capital Formation, Inc., a wholly-owned subsidiary of Dover Corporation.
www.civacon.com 9393 Princeton-Glendale Road Hamilton, Ohio, USA 45011
Phone: (800) 560-6601
12831PA
RevA Apr2021
Semi-Annual Inspection
Visually inspect and test the vent for proper operation. This inspection can
be done without removing the vent from the trailer. Follow all safety
procedures.
Visual Inspection
1. Poppet gasket surface and poppet gasket condition to be visually inspected
with poppet in extended position. See Figure 1
2. If gasket shows sign of damage, gasket should be replaced and vent rebuilt.
See Rebuild Procedures
3.
Contact Civacon at (888) 526-5657 for seal replacement kit (PN: T196SV-CVRK)
Non-sequential applications:
Install the provided 1/8 NPT plug in the sequential port.
1. Review Figure 1 before starting rebuild
2. Remove cap 11672 (1) and O-ring 11692 (2)
3. Remove piston 11772 (3) and O-ring 11776 (4)
4. Using 9/16” socket remove bolt 12532 (5). Be careful upon removal, spring is
under pressure from bolt
5. Remove spring 11694 (8)
6. Remove poppet (13) from housing and replace gasket 12007 (9) and o-ring
12503 (14)
7. Remove o-ring 10681M (10) and, clean out bore and o-ring grooves if needed
8. Install new o-ring 10681M (10) and apply lubricant throughout bore and
o-rings
9. Insert spring 11694 (8)
10. Fasten bolt 12532 (5) to poppet shaft. Using a 9/16 socket on the bolt side
and wrench holding the flats on the bottom side of the poppet. Tighten bolt
to 22 ft-lb
11. Insert new piston 11772 (3) with Lubricated O-rings 11776 (4)
12. Install O-ring 11692 (2) and cap 11672 (1)
13. Replace o-ring H20124M (11)
14. Replace exhaust port air tube with new tubing approx. 5” long
15. Test vent operation by cycling the vent open and closed by applying air to
inlet port
Exhaust Port Caution: Exhaust port must not be allowed to be sub-merged in
water and port must remain free of obstructions. The fitting shall be installed in a
horizontal or a decreasing angle as provide from the Civacon factory. The exhaust
tube opening should not be allowed to rest on the manhole cover. The tube should
be overhanging the man-hole assembly.
Alternate exhaust configurations: If you believe that the exhaust tube may be
submerged in water at times due to inadequate drainage we recommend daisy
chaining all exhaust ports together and locate the exiting tube where it will not
be restricted (i.e. midway down the back of the tank).
Lubricant to be applied to these areas of
the valve: Note: All O-rings to also be
lubricated. (recommended lubricant,
Dow Corning111, Molykote 33)
Use Anti-Seize on nut
before installing
Figure 1
124
3
5
8
13
9
14
10
11
T196SV-CV Crude Vapor Vent Rebuild Procedure

Other Dover Industrial Equipment manuals

Dover Triton 9600 User manual

Dover

Dover Triton 9600 User manual

Dover Triton 9610 User manual

Dover

Dover Triton 9610 User manual

Dover DESTACO ROBOHAND CH Series User manual

Dover

Dover DESTACO ROBOHAND CH Series User manual

Dover Destaco Robohand RPL Series User manual

Dover

Dover Destaco Robohand RPL Series User manual

Dover HEIL LIBERTY TP1L-SM-0520 User manual

Dover

Dover HEIL LIBERTY TP1L-SM-0520 User manual

Dover DESTACO RFE Series User manual

Dover

Dover DESTACO RFE Series User manual

Dover OPW 68EZR User manual

Dover

Dover OPW 68EZR User manual

Dover OPW 788 Series User manual

Dover

Dover OPW 788 Series User manual

Dover OPW OT Series Technical specifications

Dover

Dover OPW OT Series Technical specifications

Dover WILDEN PSG Equalizer SD Series Instruction Manual

Dover

Dover WILDEN PSG Equalizer SD Series Instruction Manual

Dover DESTACO ROBOHAND RDH Series User manual

Dover

Dover DESTACO ROBOHAND RDH Series User manual

Dover Ravaglioli VSG J50HE User manual

Dover

Dover Ravaglioli VSG J50HE User manual

Dover OPW SiteSentinel Integra 100 User manual

Dover

Dover OPW SiteSentinel Integra 100 User manual

Dover Triton 96 Series User manual

Dover

Dover Triton 96 Series User manual

Dover DESTACO TC1 Series User manual

Dover

Dover DESTACO TC1 Series User manual

Dover Liquip Swift Release note

Dover

Dover Liquip Swift Release note

Dover OPW DRYLOK 5770 Series Instruction manual

Dover

Dover OPW DRYLOK 5770 Series Instruction manual

Dover Vitronics Soltec DeltaWave 6622cc User manual

Dover

Dover Vitronics Soltec DeltaWave 6622cc User manual

Dover DESTACO ROBOHAND DPP Series User manual

Dover

Dover DESTACO ROBOHAND DPP Series User manual

Dover OPW 301 Series User manual

Dover

Dover OPW 301 Series User manual

Dover Dow-Key Microwave 3205 User manual

Dover

Dover Dow-Key Microwave 3205 User manual

Dover DESTACO ROBOHAND DPL Series User manual

Dover

Dover DESTACO ROBOHAND DPL Series User manual

Dover Automating Tomorrow DESTACO RA Series User manual

Dover

Dover Automating Tomorrow DESTACO RA Series User manual

Dover TWG PullMaster PM50 User manual

Dover

Dover TWG PullMaster PM50 User manual

Popular Industrial Equipment manuals by other brands

BIG Point Master Pro PMPC Series Operation manual

BIG

BIG Point Master Pro PMPC Series Operation manual

SMC Networks EX260-MPN1 instruction manual

SMC Networks

SMC Networks EX260-MPN1 instruction manual

Siemens N148/21 Operating and mounting instructions

Siemens

Siemens N148/21 Operating and mounting instructions

GF SG 125 instruction manual

GF

GF SG 125 instruction manual

werma WERMA-StockSAVER manual

werma

werma WERMA-StockSAVER manual

Grob LinearChain operating instructions

Grob

Grob LinearChain operating instructions

Streckfuss A075/Ri operating instructions

Streckfuss

Streckfuss A075/Ri operating instructions

DERNASEER TF 220s manual

DERNASEER

DERNASEER TF 220s manual

Lindab InCapsa Mounting instruction

Lindab

Lindab InCapsa Mounting instruction

ABB HT613168 Operation manual

ABB

ABB HT613168 Operation manual

ABB HT581128 Operation manual

ABB

ABB HT581128 Operation manual

Multipick ATT instructions

Multipick

Multipick ATT instructions

Festo VABD Series Assembly instructions

Festo

Festo VABD Series Assembly instructions

ABB A135-M56 Operation manual

ABB

ABB A135-M56 Operation manual

JETStream VERSABOOM QSG-201 quick start guide

JETStream

JETStream VERSABOOM QSG-201 quick start guide

PAW K35 Installation and operation instruction

PAW

PAW K35 Installation and operation instruction

VibrAlign V180 manual

VibrAlign

VibrAlign V180 manual

SLI POLY Operation manual

SLI

SLI POLY Operation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.