GMC-I Messtechnik GmbH 5
Table of Contents Page Page
1 Applications ...................................................................... 6
1.1 Optional Z550A Remote Control .................................................. 6
1.2 Overview of Measuring Instrument Performance
Features ...................................................................................... 6
2 Safety Features and Precautions .....................................7
3 Initial Start-Up .................................................................. 7
3.1 Battery test ................................................................................. 7
3.2 Installing or Replacing Batteries ................................................. 7
3.3 Charging the Batteries in the Tester ........................................... 7
3.4 Device Settings – SETUP ........................................................... 8
4 General Operation ...........................................................11
4.1 Connecting the Instrument ....................................................... 11
4.2 Switching On, Monitoring and Switching Off ............................ 11
4.3 Optical Indicators ..................................................................... 11
4.4 Measurement Value Display and Memory ................................ 12
4.5 Help Function ............................................................................ 12
4.6 Setting Measuring Parameters
using Insulation Resistance Measurement as an Example ....... 12
4.7 Specifying Nominal Voltage for Uvar and Uramp ...................... 13
5 Measuring Direct Alternating Voltage .............................14
6 Measuring Insulation Resistance ...................................15
6.1 Measuring with Constant Test Voltage
and Nominal Value Selection via Rotary Switch Position ......... 16
6.2 Measurement with Constant Test Voltage
and Variably Adjustable Nominal Value .................................... 16
6.3 Measurement with Rising Test Voltage (ramp function)
and Variably Adjustable Final Value .......................................... 17
6.4 Insulation Resistance Measurement – Special Conditions ....... 17
6.4.1 Measurements with the Guard Cable ............................................ 17
6.5 Discharging the Device Under Test ........................................... 18
6.6 Evaluation of Measured Values ................................................. 18
6.7 Polarization Index Measurement .............................................. 18
6.7.1 Absorption Index (DAR) – DC Charging Test .................................. 19
7 Test Resistor for Insulation Measurement for Checking the
Insulation Measuring Instrument .................................... 19
8 Measuring Resistance – kOhm Function ........................20
9 Measuring Low-Value Resistance of up to 10 Ohm
(protective conductor and equipotential bonding conductor) ... 21
10 Database ........................................................................ 24
10.1 Creating Distributor Structures, General ................................... 24
10.2 Transferring Distributor Structures ........................................... 24
10.3 Creating a Distributor Structure in the Test Instrument ........... 24
10.3.1 Creating Structures (example for electrical circuit) ......................... 25
10.3.2 Searching for Structural Elements ................................................ 26
10.4 Saving Data and Generating Reports ........................................ 27
10.4.1 Use of Barcode Scanners and RFID Readers ................................. 28
11 Characteristic Values ......................................................29
12 Maintenance ...................................................................31
12.1 Firmware Revision and Calibration Information ....................... 31
12.2 Rechargeable Battery Operation and Charging ........................ 31
12.2.1 Charging Procedure with the Z502R Charger (accessory) .............. 31
12.3 Fuses ........................................................................................ 31
12.3.1 Melting Fuse ............................................................................... 31
12.3.2 Electronic Fuse ........................................................................... 31
12.4 Housing ..................................................................................... 32
12.5 Return and Environmentally Sound Disposal ............................ 32
13 Appendix .........................................................................32
13.1 Sample Connection Layouts for Insulation Resistance Measure-
ment ......................................................................................... 32
13.2 Error Messages ........................................................................ 34
13.3 Attaching the Test Probe Holder to the Carrying Strap ............. 36
13.4 Technical Data for Measurement Cables
(scope of delivery: KS17-4 safety cable set) ............................ 36
13.5 Optional Accessories (not included) ......................................... 37
14 Repair and Replacement Parts Service
Calibration Center and Rental Instrument
Service ............................................................................38
15 Recalibration ..................................................................38
16 Product Support ..............................................................38