harvst Sprout S10 Mini User manual

Setup guide
Model S10
Greenhouse only, Solar, 3-season and 4-season versions
4-season shown above

Thank you for buying a Harvst greenhouse.
If you have any questions while setting up, send us an email
(help@harvst.co.uk) or have a look at our forums at
https://grow.harvst.co.uk
There are also videos at https://www.harvst.co.uk/setup
Important information
Sprout mini greenhouses are intended for outdoor garden use, fixed securely to a fence, wall or
the ground. Use outdoors unsecured, or indoors, is at your own risk.
Mains powered greenhouses are provided with a waterproof power supply and 5m of mains
cable. They should be plugged into a waterproof outdoor socket, or an indoor socket in a shed,
garage or other safe place. Non waterproof extension leads should never be used.

Exploded diagram
Visit www.harvst.co.uk/setup for more information, videos and photos

Parts list (aluminium pieces)
440mm x2
Lid sides with plastic corners
580mm x2
Rear top upright
450mm Side panel crossbar
x8
1308mm x2
Front upright
910mm x2
Rear lower upright
600mm x2
Lid front & rear crossbar
600mm x1
Front upper crossbar
(box profile as alternative)
610mm Shelf support
x4 GH / 3-season / Solar
x8 4-season model
600mm x1
Front centre crossbar
405mm x1
With one hole
Lid prop
450mm x2
Side base parts
600mm x2
Front and rear base parts
Made up as an assembly with
uprights.
Side panel top assembly x2
One le and one right
Two-part ridge x1

Parts - clear panels

Parts - rear panels
Showing position of control unit and power supply (if provided, with the smart greenhouse).
Control unit and power supply are fitted aer the greenhouse is built.
Parts - other
Tools provided
3mm allen key
8mm spanner
Pozidrive screwdriver
Tools required
Tape measure
Secateurs for cutting pipe
Mesh shelves
You will also have mesh shelves and shelf supports;
2 shelves for greenhouse-only, solar & 3-season models.
4 shelves for 4-season models.

Fixings and small parts
M5 x 8mm x20
M5 x 10mm x3
M5 x 16mm x2
M5 x 30mm x4
M5 Nyloc x1
M5 nut x8
M5 square nut x22
4.5 x 30 screw x4
10cm cable ties
M5 washer x2
Blanking plug x14
Joining strap x2
Lid top plate x1
Mounting plate x1
May be slot head
M4 x 12mm x2
M4 nut x2
3mm allen key
Screwdriver
8mm spanner
O-ring x1
Fixing bracket x2
Roll of foil tape

Introduction - Slotting parts together
The greenhouse is based on parts that slot together using stainless steel screws, as shown in the
diagram below.
Ensure that your screwdriver is
fully engaged with the screw
head when you tighten, so that
you donʼt round off the head of
the screw.
Note the orientation of each
piece in the description;
specifically the closed face.
WARNING Every care has been taken during manufacture to avoid sharp edges or burrs,
however you should still take care when handling metal parts.
WARNING DO NOT USE POWER TOOLS TO SCREW IN THE SCREWS. YOU MIGHT SNAP OFF
THE HEAD, WHICH IS NOT COVERED BY WARRANTY.
Step 1 - Seal the polycarbonate panels (optional)
Twin wall polycarbonate panels act like double glazing for your mini greenhouse, and to improve
the insulation characteristics, it is good to seal the ends of the channels using the provided foil
tape. It also helps prevent bugs from crawling into the plastic.
This step is optional - it can take some time but is recommended.
1. Peel back a couple of inches of the protective foil which covers both sides of the panels,
but donʼt take it all the way off yet.
2. Apply the tape to the end of the panel, covering the flutes.
3. Fold down the sides to seal the tape to the panels.
The white film is on the UV protected side which should face out when you place the panels into
the greenhouse.

Step 2 - Attach the door handles
Do this step first to allow the adhesive tape to cure while you assemble the rest of the
greenhouse. Youʼll fit the doors at the end.
Parts
4 x door handle
4 x polycarbonate door
Fix the door handles to the doors as shown in the drawing
above, using the tape fixed to the handles.
Make sure you have peeled the protective film off the doors
first, the surfaces are clean, dry and free from grease, and that
the UV treated side of the door panels (white film) faces out.
There is a sticker on the upper pair of doors.
The longer (taller) doors are the lower pair.

Step 3 - Assemble the base
Parts:
1 x front assembly
1 x rear assembly
2 x side base 45cm
This step is best done on a flat surface where you can
easily access the screws at the bottom, such as a table or
workbench.
Link the front and rear
assemblies using the 45 cm
side base parts.
The closed faces on the
assembly uprights face
outside the greenhouse.
The side base parts have
the single channel facing
up, and the double channel
facing down.
Slot the assemblies over the
screws on the side base parts
and tighten.

Step 4 - extend the rear uprights
Move the frame down onto the floor at this point.
Parts
2 x joining strap
8 x M5 x 8 button head
8 x M5 square nut
2 x top rear upright 58cm
Insert the bolts into the joining straps, and
put a square nut on the back of each, loosely.
Slide the square nuts into the outside
channel of the rear uprights, and tighten the
lower pair of bolts.
It can be a little fiddly to get the square nuts
to slide into the channels. A small pair of
pliers can help keep them aligned.
Slide the top rear uprights down over the square nuts, and tighten the bolts.
The closed face of the bars faces the rear (outside) of the greenhouse.

Step 5 - Insert square nuts into cross bars
These are for you to attach pipe clips for irrigation (which you may add in the future even if you
donʼt have them now).
Parts
4 x side cross bar 45cm
4 x square nut
Insert a square nut into the inside channel of each
crossbar that will go on the le side of the
greenhouse. The inside channel is the one opposite
the closed face.
Step 6 - Side panels and side crossbars
The top side panel on the le has a hole with grommets in it for an external hose or tank
connection, if you have a solar, 3 season or 4-season model.
Parts:
8 x clear side panel
2 x clear top side panel
4 x side cross bar 45cm
4 x side cross bar with nuts 45cm
Peel the protective plastic off the side
panels. Slot the panels into the frame, one
on each side.
The side with the white film should face
outside; it is the UV treated side.
Slide the crossbars, closed face
outwards, down over the clear side
panels.
The bars with the nuts go on the le side.
Tighten the screws.
Finish inserting all the side panels and
cross bars in the same way.

Step 7 - Front crossbar
Parts:
1 x Front cross bar
(60cm with a black channel top and bottom)
Slide the crossbar into the front of the
greenhouse and tighten when the screws line
up with the holes in the uprights.
Closed face forwards.
Step 8 - Lower rear panel and rear crossbar
Parts:
1 x Lower rear panel (the smaller one)
1 x Rear cross bar (60cm with screws in)
Slide the rear panel into the slots on the rear of
the greenhouse, all the way into the channel in
the bottom base part.
Itʼs a snug fit into the base (anti-slug!); knock it
down gently with a so hammer or block of
wood.
Slide the bar into the rear of the greenhouse.
Closed face backwards.
Tighten the screws from the sides.

Step 9 - Fit the right side panel top assembly
Parts:
1 x Right side panel top assembly
3 x M5 * 8mm button head bolt
3 x M5 square nut
1 x M5 * 10mm button head bolt
Insert the 8mm bolts into the
assembly in positions marked 1,2,3,
and add the square nuts on the
inside, loosely.
Slide the assembly down over the
side panel, inserting the square
nuts into the outer channels on the
uprights.
Screw the 10mm bolt into the square nut which is already in the outside channel of the assembly
and tighten by hand. This will form part of the storm lock (see end of guide)
The front end goes down as far as it will go, and the rear end is flush with the top of the rear
upright (see drawing below). Tighten the bolts.
Step 10 - Fit the le side panel top assembly
Parts:
1 x Right side panel top assembly
3 x M5 * 8mm button head bolt
3 x M5 square nut
Repeat for the le hand side
(apart from the storm lock bolt which is only on the right
side)

Step 11 - Fix lid lier bracket to adapter plate
OPTIONAL - if you have an automatic lid opener
The lid lier bracket is in the lid opener box. (see drawing below for named parts)
Parts:
1 x lid lier bracket
1 x adapter plate
2 x M5 x 8mm button head
2 x M5 nut
Bolt the lier bracket to the adapter plate as
shown, with the nuts on the inside of the
bracket.
Step 12a - Fix bracket to front bar : slot method
Parts:
1 x front upper cross bar 60cm
1 x bracket assembly from above
2 x M5 x 8mm button head
2 x M5 square nut
Slide two square nuts into the
rear channel of the bar (the side
opposite the closed face). Bolt
the bracket assembly to the front
bar, in the exact centre of the bar.
Step 12b - Through-hole method
If your greenhouse has a front crossbar with no slot, it will have holes drilled in the relevant
place.
Parts:
1 x front upper cross bar 60cm
1 x bracket assembly from step 9
2 x M5 x 30mm button head
2 x M5 nut
Bolt the bracket to the front bar, through the
two holes.

Step 13 - Front upper cross bar
Parts
2 x M5 x 30 bolt
2 x M5 nut
2 x M5 washer
1 x front bar you have assembled
Bolt the front upper bar to the rear
of the brackets on the front of the
greenhouse.
Tighten securely.
Optional step - fit pipe clips
If you have a greenhouse with self watering, it will be easiest to fit the pipe clips before adding
the mesh shelves.
Parts (from control
system parts):
4 x pipe clip
4 x M5 x 16mm bolt
Fit the pipe clips to the crossbars as shown in the drawing above. The irrigation down-pipe will
clip into these.

Step 14 - Fit the shelves
Parts:
Mesh shelves
2 x shelf support per shelf
4 x cable tie per shelf
Slide the square nuts for the 13mm water
pipe to the middle of the crossbars on the le
hand side of the frame, before you insert the
shelf supports.
Slot the shelf supports into the slots on the inside of the
side panel cross bars, inserting them at a diagonal and
then straightening up.
Place the mesh shelves onto the shelf supports and secure
with cable ties, one in each corner.
NOTE: The mesh shelf with a
slot cut out goes in the top
level to allow the lid lier
piston to swing clearly. The
front shelf support goes in
upside down.

Step 15 - Add the lid prop bolts
Parts
2 x M5 x 16mm bolt
2 x M5 nut
Screw the two standard nuts onto the bolts until they are 2mm
away from being fully tightened.
Slide the heads of the bolts down the inner slot on the top right
end panel bar, as shown in the drawing below..
Slide one all the way to 40mm off the bottom and leave the other
one near the top.
Holding the bolt thread, tighten the nut to create a stud. The lower
/ front stud goes through the lid prop with a nyloc nut on it.
The top / rear stud is used to rest the lid prop when not in use.
Step 16 - Fit the lid prop
Parts
1 x lid prop, 405 mm
1 x M5 nyloc nut
Note: The nyloc nut has a little plastic ring
inside to prevent it loosening over time.
Put the hole in the lid prop over the lower
stud that you inserted above.
Put on the nyloc nut, tightening it just so that
the plastic “bites” the thread. The prop
should be loose enough to move around.

Step 17 - Fit storm lock bolts to right lid side
Position the lid le and right sides on the table. L and R will be marked with the corner cubes
facing towards you. The closed face is upwards.
Parts
1 x right lid sidebar
(45cm with corner cubes)
2 x square nut
2 x M5 x 10mm
1 x o-ring
Slide two square nuts into the
outside channel of the right lid
sidebar. These will form the top
bolts for the storm lock as per
drawing on the right.
Screw the 10mm bolts into the nuts
and tighten them by hand to lock
them in place.
Fit the o-ring over the two bolts on the side of the lid.
The drawing above shows what the lock will look like
when in operation, holding the lid down.
Step 18 -Fit lid side bars to lid rear
This is easiest done on a flat table or worktop.
Parts
1 x lid rear
2 x lid side bars
1. Slide the lid sides into the ends of the ridge assembly, with the closed side upwards.
2. Tighten the screws.
Step 19 - Insert the lid polycarbonate
Parts
1 x clear lid panel
Slot in the lid polycarbonate sheet, with the holes at the front.
Make sure the white UV protected side is upwards.
Youʼll need to flex the lid side bars apart slightly.

Step 20 - Complete the lid
Parts
1 x lid front bar
2 x 30mm screw
Screw the front of the lid
onto the rest of the lid
assembly, with the closed
face up.
Step 21 - Fit the lid lier to the lid
Place the lid upside down on a table (with the black channel facing up), with the holes over
the edge.
Parts:
2 x M4 x 16mm bolt
2 x M4 nut
1 x lid top plate
1 x lid lier
Place the lid lier so that the bracket with slots in is above the
two holes in the front of the lid. The slotted bracket is shown in
the diagram above without the lid lier, for clarity.
Bolt the lid lier to the bottom of the lid, using the top plate on
the other side (underneath the upturned lid).
Other manuals for Sprout S10 Mini
2
Table of contents
Other harvst Greenhouse Kit manuals

harvst
harvst WaterMate User manual

harvst
harvst S24 User manual

harvst
harvst Harvster User manual

harvst
harvst S14 User manual

harvst
harvst Sprout S6 Mini User manual

harvst
harvst Sprout S10 Mini User manual

harvst
harvst Sprout S6 Mini User manual

harvst
harvst S14 User manual

harvst
harvst Sprout S6 Mini User manual

harvst
harvst Terrace User manual