manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. MG
  6. •
  7. Control Unit
  8. •
  9. MG 18KYC User manual

MG 18KYC User manual

Other MG Control Unit manuals

MG R7F4HC-DAC32C-K User manual

MG

MG R7F4HC-DAC32C-K User manual

MG R3-YS4 User manual

MG

MG R3-YS4 User manual

MG R6S-SS2 User manual

MG

MG R6S-SS2 User manual

MG JFK User manual

MG

MG JFK User manual

MG R3-DC32C User manual

MG

MG R3-DC32C User manual

MG R7LWTU User manual

MG

MG R7LWTU User manual

MG R5-RS1A User manual

MG

MG R5-RS1A User manual

MG R3-CT4B User manual

MG

MG R3-CT4B User manual

MG R7L-EC16A User manual

MG

MG R7L-EC16A User manual

MG R7K4FML-6-DC32B User manual

MG

MG R7K4FML-6-DC32B User manual

MG R6D-SS2 User manual

MG

MG R6D-SS2 User manual

MG R6S-SV2 User manual

MG

MG R6S-SV2 User manual

MG R7L-EC16B User manual

MG

MG R7L-EC16B User manual

MG R8-SV4N User manual

MG

MG R8-SV4N User manual

MG R3-DC64C User manual

MG

MG R3-DC64C User manual

MG R7L-YV2 User manual

MG

MG R7L-YV2 User manual

MG R80YVT4N User manual

MG

MG R80YVT4N User manual

MG R5-TS1A User manual

MG

MG R5-TS1A User manual

MG R7ML-EA8 User manual

MG

MG R7ML-EA8 User manual

MG R8-SST8 User manual

MG

MG R8-SST8 User manual

MG R3Y-YS4 User manual

MG

MG R3Y-YS4 User manual

MG R7E-EA16 User manual

MG

MG R7E-EA16 User manual

MG M8YCH User manual

MG

MG M8YCH User manual

MG R5-SS1A User manual

MG

MG R5-SS1A User manual

Popular Control Unit manuals by other brands

Seitz 14A80 user manual

Seitz

Seitz 14A80 user manual

Wilo RS485 Installation and operating instructions

Wilo

Wilo RS485 Installation and operating instructions

Becker CentralControl CC41 Commissioning Instruction

Becker

Becker CentralControl CC41 Commissioning Instruction

SICK CDB650 operating instructions

SICK

SICK CDB650 operating instructions

Panduit NetKey NKP5E88M Series installation instructions

Panduit

Panduit NetKey NKP5E88M Series installation instructions

MX Options Concentric Petite Fitting instructions

MX

MX Options Concentric Petite Fitting instructions

Clean Water Systems Fleck 2510 Installation & start?up guide

Clean Water Systems

Clean Water Systems Fleck 2510 Installation & start?up guide

Fairchild FSB44104A user guide

Fairchild

Fairchild FSB44104A user guide

LEGRAND Wattstopper LMIN-104 installation instructions

LEGRAND

LEGRAND Wattstopper LMIN-104 installation instructions

PMK ATT10BNCS instruction manual

PMK

PMK ATT10BNCS instruction manual

Tektronix TDS3FFT user manual

Tektronix

Tektronix TDS3FFT user manual

Woodward easYgen Technical manual

Woodward

Woodward easYgen Technical manual

Balluff BNI EIP-502-105-R015 user guide

Balluff

Balluff BNI EIP-502-105-R015 user guide

NXP Semiconductors TWR-LS1021A Getting started

NXP Semiconductors

NXP Semiconductors TWR-LS1021A Getting started

Advantech PCM-3117 Startup manual

Advantech

Advantech PCM-3117 Startup manual

Danfoss MCO 101 manual

Danfoss

Danfoss MCO 101 manual

Moons' Lin Engineering R701P user manual

Moons'

Moons' Lin Engineering R701P user manual

Aventics RV1 operating instructions

Aventics

Aventics RV1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

EM-0489 Rev.2 P. 1 / 3
MG CO., LTD. www.mgco.jp
5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
INSTRUCTION MANUAL
CONTROL OUTPUT ISOLATOR MODEL 18KYC
BEFORE USE ....
Thank you for choosing us. Before use, please check con-
tents of the package you received as outlined below.
If you have any problems or questions with the product,
please contact our sales office or representatives.
■PACKAGE INCLUDES:
Signal conditioner ...............................................................(1)
■MODEL NO.
Confirm Model No. marking on the product to be exactly
what you ordered.
■INSTRUCTION MANUAL
This manual describes necessary points of caution when
you use this product, including installation, connection and
basic maintenance procedures.
POINTS OF CAUTION
■POWER INPUT RATING & OPERATIONAL RANGE
• Locate the power input rating marked on the product and
confirm its operational range as indicated below:
24V DC rating: 24V ±10%, approx. 50mA
■GENERAL PRECAUTIONS
• Before you remove the unit or mount it, turn off the power
supply and input signal for safety.
■ENVIRONMENT
• Indoor use.
• When heavy dust or metal particles are present in the
air, install the unit inside proper housing with sufficient
ventilation.
• Do not install the unit where it is subjected to continuous
vibration. Do not subject the unit to physical impact.
• Environmental temperature must be within -5 to +55°C
(23 to 131°F) with relative humidity within 30 to 90% RH
in order to ensure adequate life span and operation.
■WIRING
• Do not install cables close to noise sources (relay drive
cable, high frequency line, etc.).
• Do not bind these cables together with those in which
noises are present. Do not install them in the same duct.
■AND ....
• The unit is designed to function as soon as power is sup-
plied, however, a warm up for 10 minutes is required for
satisfying complete performance described in the data
sheet.
COMPONENT IDENTIFICATION
Body
Specifications
Front Cover
(Connection diagram
behind)
■FRONT VIEW (with cover open)
• Without Power Switch
Span Adj.
Zero Adj.
1
78
56
2
34
• With Power Switch
Power Switch
Span Adj.
Zero Adj.
1
78
56
2
34
ON
OFF
INSTALLATION
Use Standard Rack (model: 18KBXx).
18KYC
EM-0489 Rev.2 P. 2 / 3
MG CO., LTD. www.mgco.jp
5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
TERMINAL CONNECTIONS
Connect the unit as in the diagram below or refer to the connection diagram behind the front cover.
■EXTERNAL DIMENSIONS unit: mm (inch)
110 (4.33 )
93 (3.66)
24 (.94)
7 (.28)
78 (3.07)32 (1.26)
8–M3.5
SCREW
7 (.28)
2–M3
SCREW
■CONNECTION DIAGRAM
5
6
1
2
DCS OUTPUT
+
−
INPUT MONITOR
1
2
OUTPUT
+
−
Use either of module or external field terminals.
To External
Field Terminals
(Section A)
Module
Field Terminals
(Section A)
CONNECTOR
Section A. Field Terminals
POWER
■TERMINAL ASSIGNMENTS
12
34
78
56
18KYC
EM-0489 Rev.2 P. 3 / 3
MG CO., LTD. www.mgco.jp
5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
WIRING INSTRUCTIONS
■SCREW TERMINAL
Torque: 0.8 N·m
CHECKING
1) Terminal wiring: Check that all cables are correctly con-
nected according to the connection diagram.
2) Power input voltage: Check voltage supplied to the rack
(model: 18KBXx). For the DC power source, be sure that
the ripple level is within 10% p-p.
3) Input: Check that the input signal is within 0 – 100% of
the full-scale.
4) Output: Check that the load resistance meets the de-
scribed specifications.
ADJUSTMENT PROCEDURE
This unit is calibrated at the factory to meet the ordered
specifications, therefore you usually do not need any cali-
bration.
For matching the signal to a receiving instrument or in case
of regular calibration, adjust the output as explained in the
following.
■HOW TO CALIBRATE THE OUTPUT SIGNAL
Use a signal source and measuring instruments of sufficient
accuracy level. Turn the power supply on and warm up for
more than 10 minutes.
1) ZERO: Apply 0% input and adjust output to 0%.
2) SPAN: Apply 100% input and adjust output to 100%.
3) Check ZERO adjustment again with 0% input.
4) When ZERO value is changed, repeat the above proce-
dure 1) – 3).
MAINTENANCE
Regular calibration procedure is explained below:
■CALIBRATION
Warm up the unit for at least 10 minutes. Apply 0%, 25%,
50%, 75% and 100% input signal. Check that the output
signal for the respective input signal remains within accu-
racy described in the data sheet. When the output is out of
tolerance, recalibrate the unit according to the “ADJUST-
MENT PROCEDURE” explained earlier.
LIGHTNING SURGE PROTECTION
We offer a series of lightning surge protector for protec-
tion against induced lightning surges. Please contact us to
choose appropriate models.