
Limited 5 Year Warranty and Exclusions
OSRAM warrants each (when installed in a compatible and suitable LED system) (the “Product”) to be free from defects in materials and workmanship, and to
operate from the date of installation (or date of manufacture if installation date is not known or available or verifiable) for the time periods and subject to the Terms
and Conditions specified in the warranty document. If Tunable White DALI power pack fails to operate for the specified warranty period, OSRAM will provide a free
same or similar replacement component in accordance with the Terms and Conditions. Labor not included.
Installation
1. Warning: To Avoid fire, shock or death, turn off power at circuit breaker or fuse and test that power is off before wiring!
2. Remove junction box cover plate and save screws. The power pack will take the place of the junction box cover (refer to Figure 1).
3. Prepare high and low-voltage wires by stripping 3/4" (1.9 cm) of insulation to expose bare copper at the end of each wire.
4. Line Voltage Connections: Identify the voltage of your lighting circuit before attempting to install the power pack, either 120 or 277Vac.Inaccordance with local
wiring codes, connect lead wires of power pack per appropriate Wiring Diagram as follows: Line (Black) lead to the Hot (Black) circuit conductor. Connect the
power pack Neutral (White) lead to the Neutral (White) circuit conductor. Twist strands of each lead tightly and, with circuit conductors, push firmly into
appropriate wire connector. Screw connectors on clockwise making sure that no bare conductor shows below the wire connectors. Secure each connector with
electrical tape.
The power pack Line voltage wires exit through the back of the device and are designated as follows:
Black – 120Vac Line Orange – 277Vac Line White – 120 or 277Vac Neutral
Caution: DO NOT connect both 120 and 277Vac wiring to the power pack at the same time, and DO NOT connect both the Black and Orange high voltage wires
to the same circuit.
5. Ensure that TW-DL-12V/110mA-Power Pack is wired properly before mounting it back to the junction box. Carefully position all high-voltage wires in the junction
box and assure that all low-voltage wires are on the Class 2 side of the isolation barrier. Mount the power pack to the junction box using the cover plate screws.
6. Low-Voltage Connections:Remove the cover plate for the low-voltage compartment. Connect the low-voltage leads of power pack per WIRING DIAGRAM as follows:
Red (DALI) and Black (DALI) leads to the PURPLE (DALI) wires on the DALI loop. Twist strands of each lead tightly and push firmly into appropriate wire con-nector. Screw
connectors on clockwise making sure that no bare conductor shows below the wire connectors. Secure each connector with electrical tape.
The power pack Low-voltage leads exit through the side of the device, inside the isolation barrier and have polarity designations as follows:
Red – DALI wire (Positive) Black – DALI wire (Negative)
7. Carefully position the low-voltage wires in the low-voltage compartment and replace the cover.
8. Restore power at the fuse or circuit breaker. Installation is complete.
OSRAM SYLVANIA Inc.
200 Ballardvale Street
Wilmington, MA 01887 USA
877-636-5267
www.osram.us/ds
OSRAM is a registered trademarks.
All other trademarks are those of their respective owners.
Specifications subject tochange without notice.
© 2018 OSRAM SYLVANIA Inc.
LMS165 10-18
NOTES:
1. DALI loop wires are not polarity sensitive