
4/267
Building Technologies Basic Documentation LMV37.4... CC1P7546en
17.12.201816
7.2.2Extraneous light .............................................................................................36
7.2.3No flame at the end of safety time .................................................................36
7.2.4Flame intensity...............................................................................................36
7.2.5Supervision of flame detector ........................................................................36
7.2.6Flame detection sensitivity.............................................................................37
7.3Digital inputs ..................................................................................................38
7.3.1Safety loop X3–04 pin 1 and 2.......................................................................38
7.3.2Burner flange X3–03, pin 1 and 2 ..................................................................39
7.3.3Input for external load controller (ON / OFF) X5–03, pin 1 ............................39
7.3.4Inputs X5-03 pin 2 and 3 (Open / Close or stage 2 / stage 3)........................39
7.3.5Air pressure switch X3-02 ..............................................................................40
7.3.6Gas pressure switch valve proving – or heavy oil direct start X9-04 .............41
7.3.7Gas / oil pressure switch-min, start release gas X5–01.................................43
7.3.8Setting the time for making the pressure switch test .....................................45
7.3.9Gas / oil pressure switch-max / or POC contact, start release oil / additional
speed-dependent air pressure switch X5-02 .................................................46
7.3.10Reset X8-04, pin 1 .........................................................................................49
7.4Digital outputs ................................................................................................50
7.4.1Output alarm type No-SI – X3–05, pin 2........................................................50
7.4.2Fan motor contactor type SI – X3–05, pin 1 ..................................................50
7.4.3Fan continuous purging X3–05, pin 3 ............................................................50
7.4.4Output ignition type SI (IGNITION) X4-02......................................................51
7.4.5Outputs fuel valves type SI V1 / V2 / V3 / PV) X8-02, X7-01, X7-02 .............52
7.4.6Output safety valve type SI X6–03.................................................................52
7.4.7Output for indication of operation X8-04, pin 2 ..............................................52
7.5Program sequence.........................................................................................53
7.5.1Time parameters............................................................................................53
7.5.2Valve proving .................................................................................................54
7.5.3Valve proving with separate pressure switch X9-04 ......................................55
7.5.3.1.Valve proving via gas pressure switch-min X5-01 .........................................56
7.5.3.2.Lockout phase (phase 00) .............................................................................56
7.5.3.3.Safety phase (phase 01)................................................................................57
7.5.4Special functions during the program sequence............................................58
7.5.4.1.Reset / manual lockout ..................................................................................58
7.5.4.2.Alarm upon start prevention...........................................................................59
7.5.4.3.Possible start preventions..............................................................................60
7.5.4.4.Repetition counter..........................................................................................60
7.5.4.5.Start without prepurging (as per EN 676) ......................................................63
7.5.4.6.Gas shortage program...................................................................................64
7.5.4.7.Program stop function....................................................................................65
7.5.4.8.Forced intermittent operation (<24 hours) .....................................................65
7.5.4.9.Low-fire shutdown..........................................................................................65
7.5.4.10.Continuous fan...............................................................................................66
7.5.4.11.Test function for approval of burner – loss-of-flame test (TÜV test) ..............67
7.5.4.12.Postpurging in the lockout position ................................................................68
7.5.4.13.Switching back to pilot ...................................................................................69
7.6Fuel trains (application examples) .................................................................71
7.7Sequence diagrams.......................................................................................80
7.7.1Gas direct ignition «G», «G mod», «G mod pneu»........................................81