1I56‐2700‐004
BEFOREINSTALLING
ThissensormustbeinstalledincompliancewiththeC.I.E.installationmanual.TheinstallationmustmeettherequirementsoftheAuthorityHaving
Jurisdiction(AHJ).HeatSensorsoffermaximumperformancewheninstalledincompliancewithAS1670.1‐2004.
PleaserefertotheoperatorsmanualforthelistedC.I.E.forspecificoperationandsettingsforthe5251RB‐WPand5251B‐WPHeatsensors.
Note:ThisdetectormustbefittedtothespecialB501Abaseassuppliedwiththedetector.ThisdetectorwillnotfitintothestandardB501modelbase.
GENERALDESCRIPTION
Models5251RB‐WPand5251B‐WPareintelligentheatsensorsthatutilizeastate‐of‐the‐artthermistorsensingcircuitforfastresponse.Allheatdetectors
shouldbespacedandinstalledinaccordancewiththerequirementsoftherelevantauthorityhavingjurisdictionandAS1670.1‐2004.
Thedetectoraddressshouldbesetbyhandheldprogrammer(modelCP500)from1to159beforeinstalling.
Note:CheckC.I.E.maximumloopcapacitybeforesettingaddresshigherthan99.
Model5251RB‐WPisaTypeA2Rrate‐of‐risetemperaturesensorwith63°Cfixedtemperaturealarmsetting.Model5251B‐WPisaTypeA2fixedtemperature
heatsensorwith63°Cfixedtemperaturealarmsetting.
TwoLEDsilluminateredtoprovide360°visibilityofthesensoralarmindication.TheLEDscanbelatchedonbycodecommandfromtheC.I.E.foranalarm
indication.TheLEDscanalsobeunlatchedtothenormalconditionbycodecommand.RemoteLEDannunciatorcapabilityisavailableasanoptionalaccessory
(PartNo.RA400Z).
Models5251RB‐WPand5251B‐WPrequirecompatibleaddressablecommunicationstofunctionproperly.Thereforethesesensorsmustonlybeconnectedto
compatibleandlistedC.I.E.
WIRINGGUIDE
Properwiregaugesshouldbeused.Theinstallationwiresshouldbecolorcodedtolimitwiringmistakesandeasesystemtroubleshooting.Improper
connectionswillpreventasystemfromrespondingproperlyintheeventofafire.
WIRINGINSTALLATIONGUIDELINES
INSTALLATION AND MAINTENANCE INSTRUCTIONS
SPECIFICATIONS
Diameter:
Height:
Weight:
InstallationTemperatureRange:
OperatingHumidityRange:
VoltageRange:
StandbyCurrent:
LEDCurrent:
FixedTemperatureRating:
FixedTemp.&RORDetection:
FixedTemp.Detection:
IPRating:
104mm(4.1inches)installedinB501A
51mm(2.0inches)
137g(4.8ounces)
20°Cto50°C(‐4°Fto122°F)
10%to90%RelativeHumidity(Non‐condensing)
15to32VoltsDCPeak
300μA@24VDC(onecommunicationevery5secondswithLEDblinkenabled)
6.5mA@24VDC
63°C(146°F)
Type:A2R(5251RB‐WP)
Type:A2(5251B‐WP)
IP67
Figure 1.
Thisdetectorprovidessixwireswhicharedividedintothreegroups,
separatelytwored,twowhiteandtwoblackwires.
RefertoFigure1.
TerminalNotes:
Redwire:Power/Loop+ve
Blackwire:Power/Loop‐ve(alsoRemoteLED‐ve)
Whitewire:RemoteLED+ve
WiringDiagramreferstoFigure2.
Removepowerfromthecommunicationlinebeforeinstallingsensors.
1.SecureB501Aadaptertotherooforceiling.
2.Setthesensortoadesiredaddresswithhandheldprogrammer.
3.ConnecttheWirestoloopwiringasperthewiringdiagram,seeFigure2A.
4.Thewiringconnectionsmustbepreventfromwater,seefigure2B.
5.Installthesensorintothesensoradapter.Pushthesensorintotheadapter
whileturningitclockwisetosecureitinplace.
6.Afterallsensorshavebeeninstalled,applypowertothecontrolunitand
activatethecommunicationline.
7.Testthesensor(s)asdescribedintheTESTINGsectionofthismanual.
5251RB-WP and 5251B-WP
Weatherproof Intelligent Heat Sensors www.systemsensor.com